← Back
Two family converted from one family
6709 16 AVENUE
BROOKLYN · BIN 3134578
💬 Discuss this project
1945Year Built
2Stories
B3Building Class
R5Zoning
1,782 sfGross Floor Area
2Units
Two family converted from one family · 1,602 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 12 docs
Floor 21p · 1 filing · 9 docs
Floor 11p · 1 filing · 12 docs
Basement3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2021$950K—Private party → Private party$533/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BILLAH ENGINEERING PLLC809/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
Building Lifecycle
All (17)Filed (8)Permit Issued (2)Signed Off (2)Inspection (5)
10/20/2021
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00522514-I1
10/20/2021
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST, AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NOCHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00522513-I1
09/15/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00522514-P6
09/09/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/03/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/23/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00522514-P3
08/20/2021
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST, AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NOCHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00522513-P2
08/20/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00522514-P2
07/26/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00522514-P1
07/15/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/06/2021
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST, AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NOCHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00522513-P1
07/02/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/25/2021
Permit issued — Plumbing
B00522514-I1-PL
05/22/2021
Permit issued — General Construction
B00522513-I1-GC
05/18/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00522514-I1
05/18/2021
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST, AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NOCHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00522513-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC05/25/2021
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC05/22/2021
2 projects · most recent 06/29/2021
General Wiring
FiledStatusContractorScope
06/29/2021CompleteKJK ELECTRIC INCGeneral Wiring
03/05/2021CompleteILLUMINATIONS UNLMTD ELEC2 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/09/2021Pass-Final General Construction Non-Directive 14PassView ↗
09/03/2021Fail-Final General Construction Non-Directive 14FailView ↗
07/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/02/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00522513-I1Request digital key ↗
09/01/2026B00522513-P2Request digital key ↗
09/01/2026B00522513-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026B00522514-P6Open ↗
08/13/2026B00522513-P2Open ↗
08/13/2026B00522513-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B00522513-P2Open ↗
08/13/2026B00522513-I1Open ↗
08/13/2026B00522513-P1Open ↗
Showing 3 of 5 on file for this type