← Back
BuildNYC
Three families
671 AUTUMN AVENUE
BROOKLYN · BIN 3095856
💬 Discuss this project
1965Year Built
2Stories
C0Building Class
R5Zoning
1,995 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Three families · Owner of record: Prosperity JCM · 1,992 sf lot · 1 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 13p · 1 filing · 6 docs
Cellar4p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RS Design Associates207/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RS Design Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RS Design AssociatesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADS Special Inspections1270207/18/2025
Building Lifecycle
08/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/18/2025
Filed — Alteration
Alteration of walls and kitchen at 1st floor and boiler room doors
B01024868-P1
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NISCHAL ARJUNE
07/02/2025
Special inspection requirement — Lighting in dwelling units
ERROL CRAWFORD
04/18/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRS Design Associates08/30/2024
2 projects · most recent 10/24/2023
General Wiring
FiledStatusContractorScope
10/24/2023CompleteMadison ElectricGeneral Wiring
03/02/2022Permit IssuedJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 07/18/2025
FiledStatusContractorScope
07/18/2025Signed-offRS Design Associates—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/02/2025Fire-Resistant Penetrations and JointsNISCHAL ARJUNEspecial
07/02/2025Lighting in dwelling unitsERROL CRAWFORDenergy_progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account