← Back
Over six families without stores
672 BECK STREET
BRONX · BIN 2005094
💬 Discuss this project
1931Year Built
5Stories
C1Building Class
R7-1Zoning
34,200 sfGross Floor Area
41Units
LL97 CoveredRent Stabilized93 Open Violations ▸
Over six families without stores · Owner of record: 664-672 BECK ST HSNG DEV · 10,156 sf lot · 3.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 3 filings · 20 docs
Floor 5Under Construction58p · 3 filings · 20 docs
Floor 4Under Construction53p · 3 filings · 20 docs
Floor 3Under Construction56p · 3 filings · 20 docs
Floor 2Under Construction53p · 3 filings · 20 docs
Floor 1Under Construction57p · 3 filings · 20 docs
Sub-BasementUnder Construction16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MHANY MANAGEMENT5708/29/2026
PROJECT EYE CONSULTANTS507/08/2026
664-672 BECK STREET HOUSING DEVELOP407/08/2026
664-672 BECK ST HSNG DEV103/22/2026
TRI BOROUGH SCAFFOLDING103/22/2026
664-672 BECK ST HOUSING203/21/2026
664 BECK STREET HOUSING HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC1203/21/2026
NEW YORK ENGINEERING ASSOCIATES P403/21/2026
AE DESIGN SOLUTION203/21/2026
CSR EXPEDITERS203/21/2026
GREEN STUDIO203/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROJECT EYE CONSULTANTS IGeneral Contractor1507/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor1007/08/2026
NM MECHANICAL CORPPlumbing607/08/2026
PANDELI GJINIElectrical603/21/2026
MC SUPERSTRUCTURE INCGeneral Contractor403/21/2026
ACCORD POWER INCGeneral Contractor207/08/2026
TECHNO-VOLT ELEC, INCElectrical203/22/2026
DIMITRIOS ROSVOGLOUElectrical103/21/2026
THOMAS KELLYElectrical103/21/2026
ROSVOGLOU DIMITRIOSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803906/22/2026
SYNERGIC DESIGN LLC8561107/08/2025
NEW YORK ENGINEERING ASSO851206/24/2021
Building Lifecycle
All (109)Filed (16)Permit Issued (29)Signed Off (4)Violation (60)
08/11/2026
Filed — Alteration
Modification of an existing steam boiler within a multi-family residential building. No change of use, egress or occupancy under this application.
X01430010-I1
06/24/2026
Violation issued (HPD, closed)
C
06/22/2026
Filed — Alteration
Renovation of an existing apartment building. Water/sanitary piping, gas piping, gas fixtures, and bath/kitchen fixtures are to be replaced No change of use, egress, or occupancy under this application.
X00749030-P2
06/10/2026
Violation issued (HPD, closed)
C
05/14/2026
Permit issued — Plumbing
X00749030-I1-PL
04/29/2026
Violation issued (HPD, open)
A
03/31/2026
Violation issued (HPD, open)
C
03/02/2026
Permit issued — Solar
X01248780-I1-SL
03/02/2026
Violation issued (HPD, open)
B
03/02/2026
Violation issued (HPD, closed)
B
02/25/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (HPD, closed)
C
02/14/2026
Violation issued (HPD, open)
C
02/14/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
02/03/2026
Filed — Alteration
Renovation of an existing apartment building. Water/sanitary piping, gas piping, gas fixtures, and bath/kitchen fixtures are to be replaced No change of use, egress, or occupancy under this application.
X00749030-P1
02/03/2026
Filed — Alteration
Proposed renovation of existing building. Provide new Exhaust throughout. No change of use, egress or occupancy under this application.
X00749061-P1
02/02/2026
Violation issued (HPD, open)
C
02/02/2026
Violation issued (HPD, closed)
C
02/02/2026
Violation issued (HPD, closed)
C
01/26/2026
Violation issued (HPD, open)
C
01/26/2026
Violation issued (HPD, closed)
C
01/07/2026
Permit issued — General Construction
X00749012-I1-GC
01/05/2026
Permit issued — Structural
X00749012-S1-ST
01/05/2026
Permit issued — Mechanical Systems
X00749061-I1-MS
12/03/2025
Violation issued (HPD, open)
B
12/03/2025
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
I
10/14/2025
Permit issued — Solar
X01248780-I1-SL
08/01/2025
Permit issued — Structural
X00749012-S1-ST
07/08/2025
Filed — Alteration
Installation of 23.085 kw solar energy system on roof. No change of occupancy, use or egress.
X01248780-I1
06/04/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, open)
A
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, open)
A
05/21/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, closed)
C
05/21/2025
Violation issued (HPD, open)
B
05/14/2025
Permit issued — Plumbing
X00749030-I1-PL
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNM MECHANICAL CORP05/14/2026
DOB NOWSolarSigned-offACCORD POWER INC03/02/2026
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I01/07/2026
DOB NOWStructuralPermit IssuedPROJECT EYE CONSULTANTS I01/05/2026
DOB NOWMechanical SystemsPermit IssuedPROJECT EYE CONSULTANTS I01/05/2026
DOB NOWSolarSigned-offACCORD POWER INC10/14/2025
DOB NOWStructuralPermit IssuedPROJECT EYE CONSULTANTS I08/01/2025
DOB NOWPlumbingPermit IssuedNM MECHANICAL CORP05/14/2025
DOB NOWMechanical SystemsPermit IssuedPROJECT EYE CONSULTANTS I03/12/2025
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I01/06/2025
DOB NOWStructuralPermit IssuedPROJECT EYE CONSULTANTS I08/07/2024
DOB NOWPlumbingPermit IssuedNM MECHANICAL CORP05/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offPROJECT EYE CONSULTANTS I04/22/2024
DOB NOWMechanical SystemsPermit IssuedPROJECT EYE CONSULTANTS I03/06/2024
DOB NOWPlumbingPermit IssuedNM MECHANICAL CORP01/23/2024
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I01/09/2024
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I12/05/2023
DOB NOWStructuralPermit IssuedPROJECT EYE CONSULTANTS I07/24/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/13/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/12/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/08/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/08/2023
DOB NOWMechanical SystemsPermit IssuedPROJECT EYE CONSULTANTS I04/05/2023
DOB NOWPlumbingPermit IssuedNM MECHANICAL CORP02/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offPROJECT EYE CONSULTANTS I02/04/2023
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I12/14/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING08/17/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING08/24/2021
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC03/19/2021
BISFBISSUEDA & C COMBUSTION SERVICES11/08/2000
BISPLISSUEDPERFECT PLUMBING & HEATING07/31/2000
BISFBISSUEDEVERFLOW PLUMBING & HEATING03/09/1992
1 project · most recent 02/03/2026
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/03/2026Permit IssuedPROJECT EYE CONSULTANTS IAssociated Ducts and Piping, Ventilation Systems
Ventilation
Greenheck G-097-VG 220 CFM · Exhaust Fan ×8
G-098-VG 275 CFM · Kitchen Exhaust ×8
Panasonic FV-0511VF1 109 CFM · Kitchen Exhaust ×2
FV-0511VKS2 90 CFM · Exhaust Fan ×2
Enervex DEF300 1,380 CFM · Chimney ×2
King Electric MAU2025-3-ECM-SSR 1,300 CFM · Makeup Air ×2
Renewaire HE-3XJINV-S15W-ANTF-L 1,000 CFM · Erv ×2
Ducts & Piping
N/A n/a 1 CFM · Ductwork ×2
1 project · most recent 06/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/22/2026Permit IssuedNM MECHANICAL CORPGas, Storm, Water/Sanitary
6 projects · most recent 12/29/2025
General Wiring
FiledStatusContractorScope
12/29/2025CompleteTECHNO-VOLT ELEC, INC43 meters, 43 new_meters
09/22/2025CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
07/08/2025CompleteACCORD POWER ELECTRIC LLC—
06/28/2024CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
09/13/2023CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
07/14/2021CompleteV. VASS ELECTRIC CORP—
1 project · most recent 02/20/2024
Steel Wood
FiledStatusContractorScope
02/20/2024Signed-offPROJECT EYE CONSULTANTS ISteel, Wood
1 project · most recent 07/08/2025
FiledStatusContractorScope
07/08/2025Signed-offACCORD POWER INC114 panels, 46.16 kw, 6,429.6 roof_area_sqft
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/14/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/02/2024Pass-Final PL - UndergroundPassView ↗
11/02/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/12/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/27/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
08/06/2026Tenant Protection Plan Compliance—special
08/03/2026HVAC-R and service water heating equipment—energy_progress
08/03/2026HVAC-R and service water piping design and insulation—energy_progress
08/03/2026HVAC-R and service water heating system controls—energy_progress
07/13/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/13/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
07/13/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/26/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/26/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/26/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
01/29/2026Mechanical SystemsSAMI HAJJAR P.Especial
01/29/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
01/29/2026Permanent certificateSAMI HAJJAR P.Eenergy_progress
01/29/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/29/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
01/29/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
01/29/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
01/29/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
01/29/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
01/29/2026FinalSAMI HAJJAR P.Eprogress
06/30/2025FinalMalathi Ananthakrishnanprogress
06/30/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
06/30/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
06/30/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
06/30/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
Latest 25 of 43.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch14
08/25/2026X00563729-I1Request digital key ↗
08/23/2026X00823770-I1Request digital key ↗
08/23/2026X00868213-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/25/2026X00457391-I1Request digital key ↗
08/15/2026X00457391-P1Request digital key ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026X00457391-I1Open ↗
09/23/2026X00457391-I1Open ↗
09/23/2026X00457391-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/25/2026X00457391-I1Open ↗
08/25/2026X00457391-P1Open ↗
08/25/2026X00563729-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026X00457391-I1Open ↗
09/01/2026X00749012-I1Open ↗
09/01/2026X00749012-S1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/25/2026X00457391-P1Open ↗
08/25/2026X00457391-I1Open ↗
08/17/2026X00749030-P1Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00457391-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00457391-I1Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/17/2026X00749030-P2Open ↗
08/17/2026X00749030-P1Open ↗
08/17/2026X00749030-I1Open ↗
Showing 3 of 11 on file for this type