← Back
Primarily 2 family with 1 store or office
6724 13 AVENUE
BROOKLYN · BIN 3142868
💬 Discuss this project
1899Year Built
3Stories
S2Building Class
R6BZoning
3,210 sfGross Floor Area
3Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 6724 ZHENG LIN LLC · 1,235 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar2p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6724 ZHENG LIN1907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/21/2015$1.2M—Private party → 6724 ZHENG LIN LLC$361/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC201/02/2024
ALPHA HOME DESIGN LLC206/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LC EXPEDITING SERVICES403/21/2026
PHS CONSULTING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI STATE PLBG & HTG INCPlumbing207/08/2026
ST SAFETY CONS. INCGeneral Contractor107/08/2026
CHAMP PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449201/02/2024
Building Lifecycle
All (34)Filed (4)Permit Issued (4)Signed Off (2)Violation (14)Inspection (3)Special Inspection (7)
11/24/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2024
Permit issued — Boiler Equipment
B00977084-S1-BE
01/08/2024
Permit issued — Plumbing
B00977084-I1-PL
01/02/2024
Filed — Alteration
remove existing oil boiler and oil tank, install 3 gas boilers and 2 water heater in cellar for mixed use building
B00977084-S1
01/02/2024
Filed — Alteration
remove existing oil boiler and oil tank, install 3 gas boilers and 2 water heater in cellar for mixed use building
B00977084-I1
01/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
MOHAMED MAHMOUD
01/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
MOHAMED MAHMOUD
12/14/2023
Special inspection requirement — Lowest Floor Elevation
MOHAMED MAHMOUD
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/14/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/14/2021
Signed off — Alteration
this application is filed to removed ecb# 35510965y, cap and removed 1 shampoo chair at 1st floor. no change in use or occupancy
B00538867-I1
09/13/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/03/2021
Signed off — Alteration
this application is filed to removed ecb# 35510965y, cap and removed 1 shampoo chair at 1st floor. no change in use or occupancy
B00538867-S1
09/03/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/31/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/17/2021
Permit issued — General Construction
B00538867-I1-GC
08/13/2021
Permit issued — Plumbing
B00538867-S1-PL
06/16/2021
Filed — Alteration
this application is filed to removed ecb# 35510965y, cap and removed 1 shampoo chair at 1st floor. no change in use or occupancy
B00538867-I1
06/16/2021
Filed — Alteration
this application is filed to removed ecb# 35510965y, cap and removed 1 shampoo chair at 1st floor. no change in use or occupancy
B00538867-S1
06/16/2021
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
05/24/2021
Violation issued (ECB, closed)
Zoning
05/24/2021
Violation issued (ECB, closed)
Construction
05/24/2021
Violation issued (ECB, closed)
Construction
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedDW PLUMBING INC01/08/2024
DOB NOWPlumbingPermit IssuedDW PLUMBING INC01/08/2024
DOB NOWGeneral ConstructionSigned-offST SAFETY CONS. INC08/17/2021
DOB NOWPlumbingSigned-offCHAMP PLUMBING & HTG CORP08/13/2021
BISFSISSUEDMETRO FUEL OIL CO.05/23/1995
1 project · most recent 01/02/2024
Gas
FiledStatusContractorScope
01/02/2024Permit IssuedTRI STATE PLBG & HTG INCGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/13/2021Pass-Final General Construction Non-Directive 14PassView ↗
09/03/2021Fail-Final General Construction Non-Directive 14FailView ↗
08/31/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/02/2024Tenant Protection Plan ComplianceMOHAMED MAHMOUDspecial
01/02/2024Tenant Protection Plan ComplianceMOHAMED MAHMOUDspecial
12/14/2023Lowest Floor ElevationMOHAMED MAHMOUDprogress
12/14/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/14/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
12/14/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
06/16/2021Energy Code Compliance InspectionsYAN GAOprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00538867-S1Request digital key ↗
09/01/2026B00538867-I1Request digital key ↗
08/26/2026B00977084-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00538867-S1Open ↗
09/01/2026B00538867-I1Open ↗
08/26/2026B00977084-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026B00977084-S1Open ↗
09/01/2026B00977084-I1Open ↗
08/29/2026B00538867-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B00977084-S1Open ↗
09/01/2026B00977084-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00538867-S1Open ↗
09/01/2026B00538867-I1Open ↗
08/26/2026B00977084-I1Open ↗
Showing 3 of 4 on file for this type