| Owner | Filings | Most Recent |
|---|---|---|
| NYU LANGONE HEALTH | 269 | 09/24/2026 |
| NEW CINGULAR WIRELESS PCS, LLC | 9 | 07/08/2026 |
| MICHAEL ANTHONY CONTRACTI | 3 | 03/22/2026 |
| SL GREEN | 29 | 03/22/2026 |
| TISHMAN CONSTRUCTION | 5 | 03/22/2026 |
| NYU LMC E GARAGE CORP | 1 | 03/22/2026 |
| SL GREEN REALTY | 112 | 03/22/2026 |
| NEW YORK UNIVERSITY | 2 | 03/22/2026 |
| 673 FIRST AVENUE ASSOCIATES | 3 | 03/22/2026 |
| S.L GREEN C/0 RICK SERRIP | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LORING CONSULTING ENGINEERS, INC. | 48 | 07/20/2026 |
| PERKINS EASTMAN | 8 | 07/01/2026 |
| EWINGCOLE | 5 | 06/09/2026 |
| PLAN B ENGINEERING | 50 | 06/04/2026 |
| KMB DESIGN GROUP, LLC | 3 | 02/14/2025 |
| SIMPSON GUMPERTZ & HEGER | 1 | 01/08/2025 |
| HOWARD I SHAPIRO & ASSOCIATES | 6 | 05/21/2024 |
| LIZARDOS ENGINEERING | 5 | 04/09/2024 |
| WJE ENGINEERS & ARCHITECTS, PC | 1 | 11/28/2023 |
| HC ARCHITECT, PC | 6 | 02/22/2023 |
| SEVERUD ASSOCIATES CONSULTING ENGIN | 4 | 11/05/2022 |
| SYSKA HENNESSY GROUP | 2 | 05/25/2021 |
| MG ENGINEERING D.P.C. | 3 | 01/08/2021 |
| GEI CONSULTANTS INC. P.C. | 1 | 05/07/2020 |
| CENTEK ENGINEERING, INC. | 1 | 08/03/2018 |
| BAILEYS ENGINEERING PC | 3 | 05/30/2018 |
| LEON SKVIRSKY PE | 3 | 05/09/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| EUROCELT EXPEDITING, INC | 98 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 111 | 03/21/2026 |
| RIGGING CONSULTANTS | 8 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 12 | 03/21/2026 |
| JP EXPEDITE | 12 | 03/21/2026 |
| BUILDING BROTHERS | 6 | 03/21/2026 |
| AE DESIGN SOLUTION | 6 | 03/21/2026 |
| CCM CONSULTING GROUP, INC. | 3 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PLATFORM SOLUTIONS, INC | General Contractor | 88 | 08/01/2026 |
| TISHMAN CONSTRUCTION CORP | General Contractor | 87 | 08/08/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 22 | 07/08/2026 |
| W5 GROUP LLC | General Contractor | 17 | 07/08/2026 |
| PACE PLUMBING CORP | Fire Protection | 12 | 07/08/2026 |
| SIGNS CAD | Scaffold | 12 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 9 | 09/09/2026 |
| RAEL AUTOMATIC SPR. CO.IN | Fire Protection | 8 | 07/08/2026 |
| NELSON AIR DEVICE CORP | General Contractor | 7 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 7 | 09/24/2026 |
| BENJAMIN CONSTRUCTION COR | General Contractor | 7 | 07/08/2026 |
| K.G. MECHANICAL INC | Plumbing | 6 | 07/08/2026 |
| PJP INSTALLERS INC | General Contractor | 5 | 07/08/2026 |
| Z-CAR-D | Scaffold | 5 | 07/08/2026 |
| JACOBS TELECOMMUN. INC | General Contractor | 4 | 07/08/2026 |
| ALLIANCE PLUMBING CORP | Plumbing | 4 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| E-J ELEC. INSTALLATION CO | Electrical | 3 | 03/22/2026 |
| DIGITAL CONSTRUCTION TECH | General Contractor | 3 | 03/21/2026 |
| JAY HELFGOTT | Electrical | 2 | 03/21/2026 |
| LAWRENCE J. LEVINE | Fire Protection | 2 | 03/21/2026 |
| METRO FIRE PROTECTION INC | Fire Protection | 2 | 07/08/2026 |
| CURRENT FIRE PROTECTION INC | Fire Protection | 2 | 07/08/2026 |
| NEXT SOLUTIONS C.S. INC | General Contractor | 2 | 07/08/2026 |
| CARDOZA PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALAN MARGOLIN & ASSOC | 423 | 72 | 07/20/2026 |
| PCS ENGINEERING | 3745 | 4 | 01/06/2026 |
| KMB DESIGN GROUP, LLC | 513 | 3 | 02/14/2025 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 6 | 04/09/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 09/23/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 09/08/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 08/07/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATFORM SOLUTIONS, INC | 07/20/2026 |
| DOB NOW | Construction Fence | Permit Issued | PLATFORM SOLUTIONS, INC | 07/20/2026 |
| DOB NOW | Structural | Permit Issued | TISHMAN CONSTRUCTION CORP | 07/17/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 07/15/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PLATFORM SOLUTIONS, INC | 07/07/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | PULLMAN SST INC | 07/01/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 07/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 06/17/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 06/17/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 06/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 06/08/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | PLATFORM SOLUTIONS, INC | 06/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TISHMAN CONSTRUCTION CORP | 05/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TISHMAN CONSTRUCTION CORP | 05/29/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 05/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 05/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 05/13/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATFORM SOLUTIONS, INC | 05/05/2026 |
| DOB NOW | Structural | Permit Issued | W5 GROUP LLC | 04/28/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | W5 GROUP LLC | 04/28/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PLATFORM SOLUTIONS, INC | 04/27/2026 |
| DOB NOW | Plumbing | Permit Issued | ALLIANCE PLUMBING CORP | 04/24/2026 |
| DOB NOW | Boiler Equipment | Signed-off | K.G. MECHANICAL INC | 04/24/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATFORM SOLUTIONS, INC | 02/18/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | PULLMAN SST INC | 02/17/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 02/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 02/12/2026 |
| DOB NOW | Boiler Equipment | Signed-off | K.G. MECHANICAL INC | 01/23/2026 |
| DOB NOW | Structural | Permit Issued | TISHMAN CONSTRUCTION CORP | 01/14/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 01/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TISHMAN CONSTRUCTION CORP | 01/14/2026 |
| DOB NOW | Structural | Signed-off | TISHMAN CONSTRUCTION CORP | 01/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TISHMAN CONSTRUCTION CORP | 01/14/2026 |
| DOB NOW | Structural | Permit Issued | TISHMAN CONSTRUCTION CORP | 01/13/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 01/07/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 01/07/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 12/29/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/20/2026 | Permit Issued | TISHMAN CONSTRUCTION CORP | Air Conditioning Systems, Cooling Towers, Heating Systems, Ventilation Systems | Cooling York AMI-V17 266,100 BTU ×1 YORK AMI-V17 266,100 BTU ×2 ZJ150C00S4B5JCD2A2 140,000 BTU · Rooftop Unit ×1 KJ150C00R4BECCD5A1 140,000 BTU · Chiller ×2 XTO-33X45 146,000 BTU ×2 Iec VBA4000595927 164,990 BTU · Fan Coil Indoor ×3 FXA1200595919 33,645 BTU ×4 HDY3000595911 148,215 BTU · Fan Coil Indoor ×4 VDY1600595916 31,015 CFM · Ahu ×4 FXA1200595918 33,645 BTU ×2 HDY06 266,100 BTU ×2 VBA3000595924 98,810 BTU ×2 Trane TRANE BCHE0-54 47,340 BTU · Chiller ×2 — KC150C00A2BLD 150,000 BTU · Condensing Unit ×2 Greenheck 25556871 2,250 CFM · Exhaust Fan ×2 Hitachi TIDH048B23S 47,340 BTU · Heat Pump Outdoor ×2 Ied HBD3000595920 86,090 BTU ×2 Heating Sterling HS-84 43,600 BTU · Electric Heater ×66 Cooling Tower Marley NC8414SQN 684,300 CFM · Cooling Tower ×3 |
| 07/15/2026 | Permit Issued | TISHMAN CONSTRUCTION CORP | Air Conditioning Systems, Ventilation Systems | |
| 07/02/2026 | Permit Issued | TISHMAN CONSTRUCTION CORP | Air Conditioning Systems | Cooling International Enviro-Tec HDD40 91,300 BTU ×4 |
| 07/01/2026 | Permit Issued | TISHMAN CONSTRUCTION CORP | Generators | Generators Preferred Utilities NA 2,000 kW · Generator ×1 Cummins 2000DQKAB 2,000 kW · Generator ×1 |
| 06/09/2026 | Permit Issued | TISHMAN CONSTRUCTION CORP | Air Conditioning Systems, Heating Systems, Ventilation Systems | Heating Sterling HS-84 43,600 BTU · Unit Heater ×4 Ventilation Greenheck CSP-A3300-VG 1,500 CFM · Exhaust Fan ×8 BSQ-140HP 1,350 CFM · Exhaust Fan ×4 BSQ-160HP 800 CFM · Exhaust Fan ×4 SQ-130HP-VG 1,000 CFM · Exhaust Fan ×2 SQ-160HP-VG 1,800 CFM · Exhaust Fan ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/02/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 1,927 heads, 6 outlets |
| 06/09/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 762 heads, 2 outlets |
| 06/17/2025 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | — |
| 06/17/2025 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 218 heads, 1 outlets |
| 10/16/2023 | — | — | — |
| 09/02/2022 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/02/2026 | Permit Issued | CARDOZA PLUMBING WMBE | Medical Gas, Water/Sanitary |
| 06/09/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 05/04/2026 | Permit Issued | PAR PLUMBING CO., INC | Gas, Medical Gas, Storm, Water/Sanitary |
| 05/04/2026 | Permit Issued | PAR PLUMBING CO., INC | Gas, Medical Gas, Storm, Water/Sanitary |
| 10/27/2021 | Signed-off | PACE PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/02/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | — |
| 05/22/2025 | Complete | ADCO ELEC'L CORP | General Wiring |
| 04/18/2025 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 12/02/2024 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 11/15/2024 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 11/05/2024 | Permit Issued | CORPORATE ELEC. GROUP INC | General Wiring |
| 10/28/2024 | Permit Issued | ADCO ELEC'L CORP | — |
| 10/15/2024 | Permit Issued | ALLAN BRITEWAY ELECTRICAL | General Wiring |
| 10/07/2024 | Permit Issued | ADCO ELEC'L CORP | General Wiring |
| 09/19/2024 | Permit Issued | E-J ELEC. INSTALLATION CO | 1 meters, 1 new_meters |
| 09/16/2024 | Permit Issued | CORPORATE ELEC. GROUP INC | — |
| 09/03/2024 | Permit Issued | FRED GELLER ELEC'L INC. | General Wiring |
| 04/04/2024 | Permit Issued | A.S.R. ELEC'L CONTR'G INC | General Wiring, Lighting |
| 01/19/2024 | Permit Issued | A.S.R. ELEC'L CONTR'G INC | 1 meters, 1 new_meters |
| 05/20/2023 | Permit Issued | ADCO ELEC'L CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/21/2024 | Permit Issued | W5 GROUP LLC | 4 scope_items |
| 11/04/2022 | Permit Issued | TISHMAN CONSTRUCTION CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2025 | Permit Issued | PLATFORM SOLUTIONS, INC | Sidewalk Shed |
| 04/22/2025 | Permit Issued | PLATFORM SOLUTIONS, INC | Scaffold |
| 09/26/2024 | Permit Issued | PLATFORM SOLUTIONS, INC | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/06/2026 | Signed-off | PULLMAN SST INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/10/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/04/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/29/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/29/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/15/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/15/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 07/08/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/08/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 06/23/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 06/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/22/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/16/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/14/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/27/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/09/2026 | Mechanical Systems | Young Suh | special |
| 08/09/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 08/09/2026 | Final | Young Suh | progress |
| 08/09/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 08/09/2026 | Post-installed Anchors | Young Suh | special |
| 08/09/2026 | Shutoff dampers | Young Suh | energy_progress |
| 08/09/2026 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 07/27/2026 | Final | Young Suh | progress |
| 07/27/2026 | Post-installed Anchors | Young Suh | special |
| 07/27/2026 | Emergency and Standby Power Systems (Generator) | Young Suh | special |
| 07/27/2026 | Mechanical Systems | Young Suh | special |
| 07/24/2026 | Post-installed Anchors | Young Suh | special |
| 07/24/2026 | Interior lighting power | Young Suh | energy_progress |
| 07/24/2026 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 07/24/2026 | Ventilation and air distribution system | Young Suh | energy_progress |
| 07/24/2026 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| 07/24/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 07/24/2026 | Shutoff dampers | Young Suh | energy_progress |
| 07/24/2026 | Electrical motors and elevators | Young Suh | energy_progress |
| 07/24/2026 | HVAC-R and service water heating equipment | Young Suh | energy_progress |
| 07/24/2026 | Lighting controls | Young Suh | energy_progress |
| 07/24/2026 | Final | Young Suh | progress |
| 07/24/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 07/24/2026 | Mechanical Systems | Young Suh | special |
| 07/15/2026 | Maintenance information | Young Suh | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| NYU Langone Orthopedic Center | Medical / Healthcare | Cellar, Floors 1–13, Mezzanine, Penthouse, Roof | Project M01141114 Project M00944364 Project M08025728 Project M08028441 Project M08029624 Project M08026777 Project M08027276 Project M08027495 Project M08027823 Project M08029627 Project M08030098 Project M08022284 |
| NYU Langone Medical Center | Medical / Healthcare | Cellar | Project M00333337 |