DOB07/19/2001WORK WITHOUT A PERMIT WORK NOTED OPEN VETAL STAIR CASE BUILT AT WORTH SIDE OF BUILDING FROM GRADE TO SECOND FLOOR NEW SIDE ENTRACE DOOR BUILT AT SECOND STORY NORTH SIDE REMEDY: OBTAIN PERMIT
DOB03/12/2001V-DOB VIOLATION - ACTIVE
DOB01/25/2001HAZARDOUS
DOB01/25/2001HAZARDOUS
DOB01/25/2001WORK WITHOUT PERMIT. WORK NOTED: AT NORTH SIDE OF BLDG A FLIGHT OF METAL STAIRS CONSISTING OF 2 LANDINGS & 25 STEPS (TREADS) WITH A 7 1/4 RISER CREATING A TOTAL RISE (HEIGHT) OF APPROXIMATELY 15' LEADING TO A DOOR & OUTSIDE ELEVATED SHED. REMEDY: OBTAIN NECESSARY PERMITS OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
DOB11/24/2000V-DOB VIOLATION - ACTIVE
DOB09/14/2000V-DOB VIOLATION - ACTIVE
DOB10/16/1997VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
ECB09/18/2006WORK W/O A PERMIT. WORK NOTED:AT REAR OF ABOVE PREMISES.REAR GARAGE MEAS APPROX 16'L X 16'W X 20'H HAS ERECTED A HORIZONTAL EXTENSION 2" X 6" WOOD STRINGERS W/ APPROX 75 DEGREE PITCH WOOD ROOF ON TOP OF EXISTINothing owed — awaiting certificate of correction
ECB01/26/2001FILING A FALSE CERTIFICATE OF CORRECTION WITH THE NYC DEPARTMENT OF BLDG. PURSUANT TO SECTION 26-126.2. NOTE: RESPONDANT FILED A CERTIFICATE OF CORRECTION FOR NOTICE OF VIOLATION #34262425R ON OCTOBER 19,2000.Nothing owed — awaiting certificate of correction
ECB01/25/2001FAILURE TO MAINTAIN. NOTE: AT 1ST FL OUTSIDE FACIAR BOARD AT SOUTH SIDE OF BLDG IS IN MAJOR DISREPAIR AND IN POSSIBLE DANGER OF COLLAPSING. NOTE: A 8" SEPARATION EXIST BETWEEN HOUSE & EVE WITH DETERRIORATING WONothing owed — awaiting certificate of correction
ECB01/25/2001FENCE EXCEEDS PERMITED HEIGHT. NOTED: IN DRIVEWAY, INSTALLED 11'HIGH X10'LONG STELL ROLL DOWN SECURITY GATE. NOTE AT PROPERTY LINE SOUTH SIDE INSTALLED A 8'HIGH X 20'LONG IRON FENCE LOCATED IN A R3-2 ZONING DISNothing owed — awaiting certificate of correction
ECB11/23/1998OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS.CELLAR CHANGED FROM STORAGE & ORDINARY USE TO 2 APTS. PARTITIONS ERECTED & KITCHEN & BATH FACILITIES HAVE BEEN INSTALLED.Nothing owed — awaiting certificate of correction
ECB10/16/1997WORK WITHOUT A PERMIT (WORK NOTED) (1) OPEN METAL STAIR CASE BUILT AT NORTH SIDE OF BUILDING, FROM GRADE TO SECOND STORY. (2) NEW SIDE ENTRANCE DOOR BUILT AT SECOND STORY NORTH SIDE. REMEDY: OBTAIN A PERMIT IFNothing owed — awaiting certificate of correction