| Owner | Filings | Most Recent |
|---|---|---|
| 675 GC | 50 | 09/29/2026 |
| 101 GREENWICH PROPERTY OWNER | 1 | 09/13/2026 |
| DURST ORGANIZATION | 183 | 07/08/2026 |
| ROYAL REALTY | 54 | 07/08/2026 |
| 675 THIRD OWNER LLC | 3 | 03/22/2026 |
| DAVID WERNER REAL ESTATE | 1 | 03/22/2026 |
| DOLP 675 PROPERTIES 11 | 25 | 03/22/2026 |
| DOLP 675 PROSPERTIES II | 754 | 03/22/2026 |
| ROYAL REALTY GROUP | 3 | 03/22/2026 |
| STERLING SERVICE COMPANY | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 04/01/2025 | $100.2M | — | — → — | $346/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| SURFACE DESIGN | 2 | 07/06/2026 |
| ASHRAF CORP | 3 | 05/21/2026 |
| CHARLESWORTH ENGINEERING LLC | 1 | 04/12/2026 |
| JMV CONSULTING ENGINEERING | 7 | 12/12/2025 |
| GACE DPC | 2 | 11/10/2025 |
| GENSLER | 3 | 10/22/2025 |
| MG ENGINEERING D.P.C. | 24 | 10/03/2024 |
| MEYERS+ ENGINEERS | 4 | 07/15/2024 |
| ENV ARCHITECTS, DPC | 3 | 07/15/2024 |
| KOUZMANOFF BAINTON ARCHITECTS | 1 | 06/05/2024 |
| MONTROY ARCHITECTURE PLLC | 4 | 04/11/2024 |
| GKV ARCHITECTS | 7 | 08/15/2023 |
| CASEWORKS ARCHITECT, PLLC | 1 | 05/05/2023 |
| ENTHINK ENGINEERS LLC | 2 | 01/03/2022 |
| ROBERT DERECTOR ASSOCIATES | 16 | 12/20/2021 |
| SAFWAY ATLANTIC LLC | 1 | 02/05/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 74 | 03/21/2026 |
| PROJECT TACTICAL SOLUTIONS | 18 | 03/21/2026 |
| DVA Advisors | 13 | 03/21/2026 |
| NYCCODE | 2 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 6 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JOHN GALLIN & SON, INC | General Contractor | 20 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 17 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 11 | 07/08/2026 |
| COASTAL WATERPROOFING LLC | General Contractor | 7 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 6 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 6 | 09/29/2026 |
| NORTHEAST SPECIALIST GROUP | General Contractor | 6 | 08/25/2026 |
| TT MECHANICAL CORP | Plumbing | 5 | 09/23/2026 |
| P.E. STONE INC | Electrical | 5 | 03/22/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 5 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 4 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 4 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 4 | 07/08/2026 |
| ALEKSANDR ROZOVSKY | Electrical | 3 | 03/21/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 3 | 03/21/2026 |
| SYNERGY CONSTRUCTION INC | General Contractor | 3 | 07/08/2026 |
| FASULO, JOSEPH | Electrical | 3 | 03/21/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 2 | 07/08/2026 |
| FRED GELLER ELEC'L INC. | Electrical | 2 | 03/22/2026 |
| PATRIOT ELECTRIC CORP | Electrical | 2 | 03/22/2026 |
| PREFERRED MECHANICAL INC | Plumbing | 2 | 07/08/2026 |
| WOLF CONSTRUCTION CORP 20 | General Contractor | 2 | 07/08/2026 |
| TTM GROUP CORP | Fire Protection | 2 | 07/11/2026 |
| ARMON MECHANICAL INC | Fire Protection | 1 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SURFACE DESIGN PROFESSION | 3968 | 3 | 07/06/2026 |
| DOMANI INSPECTION SERVICE | 843 | 9 | 12/12/2025 |
| PROJECT TACTICAL SOLUTION | 5859 | 43 | 10/03/2024 |
| SAG ENGINEERING & CONSULT | 608 | 1 | 05/05/2023 |
| MILROSE CONSULTANTS LLC | 2003 | 3 | 12/20/2021 |
| AK ENGINEERING PC | 678 | 2 | 03/10/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 09/28/2026 |
| DOB NOW | Plumbing | Permit Issued | TT MECHANICAL CORP | 09/22/2026 |
| DOB NOW | General Construction | Permit Issued | NORTHEAST SPECIALIST GROUP | 08/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NORTHEAST SPECIALIST GROUP | 08/24/2026 |
| DOB NOW | General Construction | Permit Issued | NORTHEAST SPECIALIST GROUP | 08/24/2026 |
| DOB NOW | Plumbing | Permit Issued | TT MECHANICAL CORP | 08/06/2026 |
| DOB NOW | General Construction | Permit Issued | SKYLINE WINDOWS LLC | 07/16/2026 |
| DOB NOW | Sprinklers | Permit Issued | TTM GROUP CORP | 07/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | TT MECHANICAL CORP | 07/09/2026 |
| DOB NOW | Plumbing | Permit Issued | TT MECHANICAL CORP | 07/09/2026 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 07/06/2026 |
| DOB NOW | General Construction | Permit Issued | NORTHEAST SPECIALIST GROUP | 06/16/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 04/13/2026 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 04/08/2026 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 04/08/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 04/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | TTM GROUP CORP | 11/21/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | NORTHEAST SPECIALIST GROUP | 09/04/2025 |
| DOB NOW | Plumbing | Permit Issued | TT MECHANICAL CORP | 09/04/2025 |
| DOB NOW | General Construction | Permit Issued | NORTHEAST SPECIALIST GROUP | 08/27/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | COASTAL WTRPRFG LLC | 02/18/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 11/29/2024 |
| DOB NOW | General Construction | Signed-off | COASTAL WATERPROOFING LLC | 09/05/2024 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 07/25/2024 |
| DOB NOW | General Construction | Signed-off | JOHN GALLIN SON | 07/22/2024 |
| DOB NOW | General Construction | Signed-off | ICON INTERIORS INC | 07/18/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ICON INTERIORS INC | 07/17/2024 |
| DOB NOW | General Construction | Signed-off | COASTAL WATERPROOFING LLC | 07/11/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | COASTAL WTRPRFG LLC | 05/08/2024 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 04/17/2024 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 03/26/2024 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 03/22/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CLUNE CONSTRUCTION CO LP | 03/22/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | COASTAL WTRPRFG LLC | 01/10/2024 |
| DOB NOW | Sprinklers | Signed-off | ARMON MECHANICAL INC | 12/19/2023 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 12/15/2023 |
| DOB NOW | Plumbing | Signed-off | ARMON MECHANICAL INC | 12/14/2023 |
| DOB NOW | Mechanical Systems | Signed-off | CLUNE CONSTRUCTION CO LP | 12/07/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 12/04/2023 |
| DOB NOW | Sprinklers | Signed-off | ASHLAR MECHANICAL CORP | 08/24/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 12/12/2025 | Permit Issued | NORTHEAST SPECIALIST GROU | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Markel TASKMASTER 5100 5 kW · Electric Heater ×64 Mitsubishi Electric MXZ-SM60NAM2 66,000 BTU · Heat Pump Outdoor ×3 pvfy-p54namu-e1 60,000 BTU · Vrf Indoor ×3 Ventilation Greenheck CSP-A700-VG 700 CFM · Exhaust Fan ×2 |
| 11/10/2025 | Permit Issued | NORTHEAST SPECIALIST GROU | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Daikin RZA36AAVJU 36,000 BTU · Vrf Outdoor ×5 Heat / Cool Daikin RXYA240AATJA 240,000 BTU · Vrf Outdoor ×3 Rebel DPSH04B 48,921 BTU · Rooftop Unit ×2 FXSA36AAVJU 36,000 BTU · Vrf Indoor ×1 FXSA48AAVJU 48,000 BTU · Vrf Indoor ×1 RXFA36AAVJU 36,000 BTU · Vrf Indoor ×1 RXYA120AATJA 120,000 BTU · Vrf Outdoor ×1 RXYA72AATJA 72,000 BTU · Vrf Outdoor ×1 Iec HDY30 90,000 BTU · Fan Coil Indoor ×1 HPY10 54,636 BTU · Fan Coil Indoor ×1 HPY12 68,844 BTU · Fan Coil Indoor ×1 Aermec NYG0500XG00J7002 30 tons · Chiller ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/12/2025 | Permit Issued | TTM GROUP CORP | 3,194 heads |
| 11/10/2025 | Permit Issued | TTM GROUP CORP | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/12/2025 | Permit Issued | TT MECHANICAL CORP | Water/Sanitary |
| 11/10/2025 | Permit Issued | TT MECHANICAL CORP | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | FSG ELECTRIC INC | — |
| 04/06/2026 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 03/16/2026 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 11/06/2025 | Permit Issued | ROZ-A-LITE ELEC'L CONTG I | — |
| 10/28/2025 | Permit Issued | ROZ-A-LITE ELEC'L CONTG I | 1 meters |
| 10/28/2025 | Permit Issued | ROZ-A-LITE ELEC'L CONTG I | — |
| 04/15/2025 | Permit Issued | P.E. STONE INC | General Wiring |
| 09/10/2024 | Complete | UNITED ELEC & LIGHTING CO | General Wiring |
| 07/10/2024 | Complete | KONSKER ELECTRIC CORP. | — |
| 03/22/2024 | Complete | EPIC ELECTRIC INC | General Wiring |
| 02/12/2024 | Complete | TM SELECT ELECTRIC CORP | — |
| 02/12/2024 | Complete | TM SELECT ELECTRIC CORP | — |
| 08/24/2023 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| 03/01/2023 | Permit Issued | FREEDOM ELECTRIC & DATA | General Wiring |
| 11/29/2022 | Complete | PATRIOT ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/12/2025 | Permit Issued | TT MECHANICAL CORP | 1 scope_items |
| 11/10/2025 | Permit Issued | NORTHEAST SPECIALIST GROU | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/21/2026 | Permit Issued | ARSENAL SCAFFOLD INC | Fence, Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/01/2026 | — | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/11/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/18/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/03/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/26/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/26/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/03/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/28/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/28/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/19/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/28/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/25/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/20/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/29/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/26/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/29/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/16/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/29/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/26/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/21/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/20/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/27/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/17/2026 | Final | MOLLY FORR | progress |
| 06/17/2026 | Wall Panels, Curtain Walls, and Veneers | MOLLY FORR | special |
| 01/13/2026 | HVAC-R and service water heating system controls | JOHN MCMONAGLE | energy_progress |
| 01/13/2026 | HVAC-R and service water piping design and insulation | JOHN MCMONAGLE | energy_progress |
| 01/13/2026 | Maintenance information | JOHN MCMONAGLE | energy_progress |
| 01/13/2026 | HVAC-R and service water heating equipment | JOHN MCMONAGLE | energy_progress |
| 12/22/2025 | Wall Panels, Curtain Walls, and Veneers | MOLLY FORR | special |
| 12/22/2025 | Air barrier continuity plan testing | MOLLY FORR | energy_progress |
| 12/22/2025 | Air barrier - visual inspection | MOLLY FORR | energy_progress |
| 12/22/2025 | Final | MOLLY FORR | progress |
| 12/22/2025 | Energy Code Compliance Inspections | MOLLY FORR | progress |
| 12/22/2025 | Insulation placement and R values | MOLLY FORR | energy_progress |
| 12/22/2025 | Fenestration areas | MOLLY FORR | energy_progress |
| 12/22/2025 | Fenestration air leakage | MOLLY FORR | energy_progress |
| 12/22/2025 | Fenestration and door U-factor and product ratings | MOLLY FORR | energy_progress |
| 12/22/2025 | Post-installed Anchors | MOLLY FORR | special |
| 12/19/2025 | Lighting controls | JOHN MCMONAGLE | energy_progress |
| 12/19/2025 | Metering | JOHN MCMONAGLE | energy_progress |
| 12/19/2025 | Interior lighting power | JOHN MCMONAGLE | energy_progress |
| 12/19/2025 | Lighting in dwelling units | JOHN MCMONAGLE | energy_progress |
| 12/19/2025 | Duct leakage testing, insulation and design | JOHN MCMONAGLE | energy_progress |
| 12/19/2025 | Maintenance information | JOHN MCMONAGLE | energy_progress |
| 12/19/2025 | Shutoff dampers | JOHN MCMONAGLE | energy_progress |
| 12/19/2025 | Electrical motors and elevators | JOHN MCMONAGLE | energy_progress |
| 12/19/2025 | Exterior lighting power | JOHN MCMONAGLE | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Mid Cap | Office | Floor 28 | Project M01019395 |
| Washington Square Partners (WSP) | Office | Floor 24 | Project M00941980 |
| Karbone | Unknown | — | Project M00906208 |
| Maven | Office | Floor 20 | Project M00615466 Project M00615464 |
| T&R Productions | Office | Floor 21 | Project M00327862 Project M00327881 Project M00295069 |