← Back
BuildNYC
Elevator cooperative
675 WEST END AVENUE
MANHATTAN · BIN 1034123
💬 Discuss this project
1925Year Built
15Stories
D4Building Class
R10AZoning
81,066 sfGross Floor Area
62Units
LL97 CoveredRent Stabilized66 Active Violations 65 unresolved · 1 paperwork only 4 likely answered 7 old, status unconfirmed ▸FISP: UNSAFE
Elevator cooperative · Owner of record: 675 West End Owners · 7,450 sf lot · 10.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsCellar-roof plumbing installation1 filing
RoofSuspended scaffold outrigger systems for facade restorationUnder Construction1p · 3 filings · 16 docs
Floor 1Unit 1A3p · 4 filings · 12 docs
CellarNew low pressure gas service and meter2p · 4 filings · 20 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
675 West End Owners4603/22/2026
675 West End503/21/2026
Aviv Associates103/21/2026
Renon Construction103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rimkus111/12/2024
Paul Perdek, Professional Engineering107/26/2023
Robert Germain Jr. PE801/12/2023
Thomas R. Devanney Architect306/09/2022
Twig Consulting Engineers406/03/2022
M.int'l Engineering104/26/2022
Syed Engineering209/26/2021
Joel Phagoo P.E.109/07/2021
Ikra Consulting201/11/2021
Lighthouse204/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS Engineers603/21/2026
Kma Designs203/21/2026
Maryclare Nepogoda303/21/2026
Expediting203/21/2026
Joel Phagoo P.E.103/21/2026
AK Consulting Services403/21/2026
A1 Expediting Service203/21/2026
CB Expediting203/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Topline GCScaffold1007/08/2026
Cityline RestorationScaffold707/08/2026
Practical Plumbing & HeatingPlumbing607/08/2026
KLC 2 ConstructionGeneral Contractor407/08/2026
Dual Fuel Plumbing & HeatingPlumbing307/08/2026
Kings Group NYScaffold207/08/2026
WCK ElectricElectrical103/21/2026
Dual Fuel CompanyGeneral Contractor107/08/2026
Ada ElectricElectrical103/22/2026
Clarity TV & Electric Service, IElectrical103/21/2026
Rennon ConstructionScaffold107/08/2026
Vertex ElectricElectrical103/21/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
Practical Plumbing & HeatingFire Protection107/08/2026
Norway ElectricElectrical103/21/2026
High Quality ElectricElectrical103/21/2026
Mike Lewkovicz Electric CompanyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joel Phagoo, PE2416103/20/2024
Robert F. Germain Jr. PE5100601/12/2023
Twig Special Inspections885406/03/2022
M. International Engineering3129104/26/2022
Thomas R. Devanney2738105/19/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
06/17/2026
Elevator Category 1 inspection report filed
03/18/2026
Permit renewed — Suspended Scaffold
Renewed without changes
M01182212-I1-SC
03/17/2026
Failure to maintain bldg exterior facade and appurtenances.-note: at time of inspection, i observed at exp #1 west-cracked decorative masonry…
ECB violation · closed
02/25/2026
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01182212-P2
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting03/18/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY12/04/2025
DOB NOWSuspended ScaffoldSigned-offD&N Construction & Consultng05/02/2025
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting03/07/2025
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting02/27/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY12/10/2024
DOB NOWSidewalk ShedSigned-offTopline GC06/14/2024
DOB NOWSuspended ScaffoldSigned-offD&N Construction & Consultng03/21/2024
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating03/07/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedCityline Restoration07/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offCityline Restoration02/17/2023
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating01/23/2023
DOB NOWSidewalk ShedSigned-offTopline GC10/18/2022
DOB NOWSidewalk ShedSigned-offCityline Restoration10/06/2022
DOB NOWPlumbingSigned-offPractical Plumbing & Heating09/07/2022
DOB NOWBoiler EquipmentSigned-offMmi Mechanical08/22/2022
DOB NOWPlumbingSigned-offPractical Plumbing & Heating05/23/2022
DOB NOWSprinklersSigned-offPractical Plumbing & Heating05/18/2022
DOB NOWPlumbingSigned-offPractical Plumbing & Heating01/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offCityline Restoration01/26/2022
DOB NOWPlumbingSigned-offPractical Plumbing & Heating01/21/2022
DOB NOWGeneral ConstructionSigned-offKLC 2 Construction10/22/2021
DOB NOWSidewalk ShedSigned-offTopline GC10/21/2021
DOB NOWBoiler EquipmentSigned-offAmerican Boiler & Welding10/14/2021
DOB NOWGeneral ConstructionSigned-offDual Fuel Company10/06/2021
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating10/06/2021
DOB NOWProtection and Mechanical MethodsSigned-offCityline Restoration09/07/2021
DOB NOWPlumbingSigned-offPractical Plumbing & Heating08/05/2021
DOB NOWGeneral ConstructionSigned-offKLC 2 Construction07/30/2021
DOB NOWSidewalk ShedSigned-offTopline GC07/09/2021
DOB NOWPlumbingSigned-offPractical Plumbing & Heating04/23/2021
DOB NOWSidewalk ShedSigned-offRennon Construction12/09/2020
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating02/11/2020
BISOTISSUEDTwo-Tone Contracting03/25/2026
BISOTISSUEDTwo-Tone Contracting07/03/2025
BISOTISSUEDCityline Restoration08/22/2024
BISEQISSUEDCityline Restoration08/22/2024
BISEQISSUEDCityline Restoration08/01/2023
BISOTISSUEDCityline Restoration04/20/2023
BISEQISSUEDCityline Restoration08/01/2022
+ 43 more permits on file
11 projects · most recent 11/04/2026
General Wiring
FiledStatusContractorScope
11/04/2026Permit IssuedMartinez ElectricalGeneral Wiring
08/03/2026Permit IssuedRobert Chimenti—
12/06/2024Permit IssuedHigh Quality Electric—
04/16/2024CompleteThe Metro Group ElectricGeneral Wiring
02/09/2022CompleteEnterprise Electrical SystemsGeneral Wiring
07/08/2021Permit IssuedRichard Neu—
06/12/2021CompleteAda Electric—
12/09/2020CompleteGreen Power Electric—
03/25/2020Permit IssuedRichard NeuGeneral Wiring
05/09/2019CompleteV. Vass ElectricGeneral Wiring
05/04/2018CompleteJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 02/25/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
02/25/2026Permit IssuedTwo-Tone ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/20/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2022Pass-Final Boiler Equipment InspectionPassView ↗
09/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/24/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/19/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/25/2026Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
02/25/2026Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
08/02/2025Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
01/11/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/15/2022Maintenance informationRobert Germain Jr.energy_progress
08/15/2022HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
08/15/2022HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
08/15/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/15/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
08/12/2022FinalRobert Germain Jr.progress
08/11/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
06/03/2022Fire-Resistant Penetrations and JointsDave Wallspecial
06/01/2022Fire-Resistant Penetrations and JointsDave Wallspecial
05/06/2022Fire-Resistant Penetrations and JointsDave Wallspecial
04/26/2022Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
04/14/2022Sprinkler SystemsNANIK MASSANDspecial
02/23/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
02/22/2022Fire-Resistant Penetrations and JointsDave Wallspecial
04/11/2021Fire-Resistant Penetrations and JointsThomas Devanneyspecial
04/11/2021FinalThomas Devanneyprogress
04/11/2021Lighting in dwelling unitsThomas Devanneyenergy_progress
04/20/2020Energy Code Compliance InspectionsSAMIR ABDALLAprogress
492 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account