← Back
BuildNYC
Over six families without stores
675 WILLOUGHBY AVENUE
BROOKLYN · BIN 3048927
💬 Discuss this project
1916Year Built
5Stories
C1Building Class
R6BZoning
18,600 sfGross Floor Area
20Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: NYC Housing Authority · 5,500 sf lot · 3.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction66p · 1 filing · 20 docs
BulkheadFacade repair with material hoistUnder Construction7p · 2 filings · 20 docs
Floor 4Under Construction83p · 1 filing · 20 docs
Floor 3Under Construction84p · 1 filing · 20 docs
Floor 2Under Construction84p · 1 filing · 20 docs
Floor 1Under Construction91p · 1 filing · 20 docs
CellarUnder Construction62p · 1 filing · 20 docs
Site & exteriorSidewalk shed erection and lightingUnder Construction56p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority2110/21/2026
Kalel Companies908/29/2026
STV103/22/2026
Ohsg Owner103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf109/25/2025
M. Hamdi Gunal, PE, P106/30/2025
R Cladding Consulting & Engineering106/04/2025
Inglese Architecture and Engineering305/21/2025
SLM Architecture205/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning1403/21/2026
BK Constructiondba SRT Construction103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Twin Swing Scaffold inGeneral Contractor203/21/2026
BK Construction ServicesScaffold209/26/2026
Metropolitan EnterprisesGeneral Contractor203/21/2026
Aah ContructionGeneral Contractor203/21/2026
A & E PlumbingPlumbing106/28/2026
Premier ConstructionGeneral Contractor107/08/2026
Mac Fhionnghaile & SonsElectrical103/22/2026
Doriel ScaffoldingGeneral Contractor208/12/1999
Rockledge ScaffoldingGeneral Contractor111/27/2007
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. Hamdi Gunal, PE3000706/30/2025
Building Lifecycle
10/20/2026
Permit renewed — General Construction
Renewed without changes
B01194186-I1-GC
09/25/2026
Permit renewed — Sidewalk Shed
Renewed with changes
B01286115-I1-SH
07/09/2026
Signed off — Alteration
BETA-MAX HOIST INSTALLED IN ORDER TO LIFT MATERIAL TO PERFORM FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
B01383628-I1
04/14/2026
Permit issued — Suspended Scaffold
B01383628-I1-SC
04/10/2026
Permit issued — General Construction
B01194186-S5-GC
67 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPyramid Etc Companies10/20/2026
DOB NOWSidewalk ShedPermit IssuedBK Construction Services09/25/2026
DOB NOWSuspended ScaffoldSigned-offPremier Construction04/14/2026
DOB NOWGeneral ConstructionPermit IssuedPremier Construction04/10/2026
DOB NOWMechanical SystemsPermit IssuedPyramid Etc Companies02/10/2026
DOB NOWPlumbingPermit IssuedA & E Plumbing02/10/2026
DOB NOWGeneral ConstructionPermit IssuedPyramid Etc Companies10/20/2025
DOB NOWSidewalk ShedPermit IssuedBK Construction Services09/25/2025
BISEQISSUEDAah Contruction03/06/2009
BISOTISSUEDAah Contruction03/06/2009
BISEQISSUEDTwin & Swing Scaffold02/17/2009
BISEQISSUEDTwin & Swing Scaffold02/17/2009
BISEQISSUEDMetropolitan Enterprises01/15/2009
BISEQISSUEDMetropolitan Enterprises01/15/2009
BISEQISSUEDRockledge Scaffold11/27/2007
BISEQISSUEDDoriel Scaffolding08/12/1999
BISEQISSUEDDoriel Scaffolding06/10/1999
1 project · most recent 06/30/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
06/30/2025Permit IssuedPyramid Etc CompaniesHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 06/30/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/30/2025Permit IssuedLeema Plumbing & HeatingGas, Water/Sanitary
4 projects · most recent 10/09/2026
General Wiring
FiledStatusContractorScope
10/09/2026Permit IssuedGregory BlauGeneral Wiring
09/26/2025Permit IssuedHigh Quality Electric of NYC—
05/01/2020CompleteSezekcol ElectricGeneral Wiring
09/18/2018CompleteMac Fhionnghaile & SonsGeneral Wiring
1 project · most recent 06/30/2025
Wood
FiledStatusContractorScope
06/30/2025Permit IssuedPyramid Etc CompaniesWood
1 project · most recent 09/25/2025
Sidewalk Shed
FiledStatusContractorScope
09/25/2025Permit IssuedBK Construction ServicesSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/18/2025Tenant Protection Plan ComplianceMehmet Gunalspecial
06/18/2025Wood – Seismic ResistanceMehmet Gunalspecial
06/18/2025Structural Stability – Alterations of existing buildingsMehmet Gunalspecial
06/18/2025FinalMehmet Gunalprogress
05/16/2025Energy Code Compliance InspectionsMehmet Gunalprogress
05/16/2025HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
05/16/2025Duct leakage testing, insulation and designMehmet Gunalenergy_progress
05/16/2025HVAC-R and service water heating equipmentMehmet Gunalenergy_progress
05/16/2025Mechanical SystemsMehmet Gunalspecial
05/16/2025Tenant Protection Plan ComplianceMehmet Gunalspecial
05/16/2025Fire-Resistant Penetrations and JointsMehmet Gunalspecial
05/16/2025Heating SystemsMehmet Gunalspecial
05/16/2025FinalMehmet Gunalprogress
05/16/2025Tenant Protection Plan ComplianceMehmet Gunalspecial
05/16/2025Tenant Protection Plan ComplianceMehmet Gunalspecial
05/16/2025Ventilation and air distribution systemMehmet Gunalenergy_progress
05/16/2025HVAC-R and service water heating system controlsMehmet Gunalenergy_progress
05/16/2025Shutoff dampersMehmet Gunalenergy_progress
04/16/2025Fenestration and door U-factor and product ratingsMehmet Gunalenergy_progress
04/16/2025Fire-Resistant Penetrations and JointsMehmet Gunalspecial
04/16/2025Tenant Protection Plan ComplianceMehmet Gunalspecial
04/16/2025Energy Code Compliance InspectionsMehmet Gunalprogress
04/16/2025Fire-Resistance Rated ConstructionMehmet Gunalprogress
04/16/2025FinalShaneekua Henryprogress
04/16/2025Fenestration air leakageMehmet Gunalenergy_progress
Latest 25 of 44.
84 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account