← Back
Primarily 2 family with 1 store or office
676 FLUSHING AVENUE
BROOKLYN · BIN 3048324
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6AZoning
4,600 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 676 AVE. LLC · 2,500 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 13p · 2 filings · 20 docs
Cellar4p · 3 filings · 20 docs
Basement1p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONCORD CONSULTING ENGINEERING PC211/19/2020
KUSHNER STUDIOS202/20/2020
KCE CONSULTING ENGINEERING PLLC110/01/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BALICO GENERAL CONTRACTINGeneral Contractor603/21/2026
M&G PLUMBING AND HEATINGPlumbing507/08/2026
M G PLUMBING HEATINGGeneral Contractor203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH CONSULTING LLC5702411/19/2020
KCE CONSULTING ENGINEERIN3712110/01/2019
Building Lifecycle
All (31)Filed (5)Permit Issued (3)Signed Off (3)Violation (1)Special Inspection (19)
01/19/2021
Signed off — Alteration
2 NEW EL HWHS, 2 NEW TOIL, 2 NEW LAVS, REL 1 TOIL, REL 1 LAV, 1 NEW ICE MAKER, 6 NEW NON-RES SINKS, 1 NEW DW, 9 NEW FD, 5 NEW FL SINKS, 1 NEW GT, 7 NEW NON-RES COOKING EQ, 1 NEW RPZ, 2 SEWER EJECTOR PUMPS, 1 NEW MUA AND 4 NEW SP HEADS OFF THE DOMESTIC
B00209036-I1
01/14/2021
Signed off — Alteration
INSTALLATION OF NEW HVAC SYSTEM, NEW KITCHEN EXHAUST SYSTEM, AND MAKE UP AIR SYSTEM
B00237618-I1
11/25/2020
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
11/25/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
11/25/2020
Special inspection requirement — Final
Shahrish Shuvo
11/25/2020
Special inspection requirement — HVAC insulation and sealing
Shahrish Shuvo
11/25/2020
Special inspection requirement — HVAC and service water heating system controls
Shahrish Shuvo
11/25/2020
Special inspection requirement — Maintenance information
Shahrish Shuvo
11/25/2020
Special inspection requirement — HVAC and service water heating equipment
Shahrish Shuvo
11/19/2020
Filed — Alteration
INSTALLATION OF NEW HVAC SYSTEM, NEW KITCHEN EXHAUST SYSTEM, AND MAKE UP AIR SYSTEM
B00237618-P1
10/15/2020
Special inspection requirement — Maintenance information
Shahrish Shuvo
10/15/2020
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
10/15/2020
Special inspection requirement — Final
Shahrish Shuvo
10/15/2020
Special inspection requirement — HVAC and service water heating system controls
Shahrish Shuvo
10/15/2020
Special inspection requirement — HVAC insulation and sealing
Shahrish Shuvo
10/15/2020
Special inspection requirement — HVAC and service water heating equipment
Shahrish Shuvo
10/15/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
08/27/2020
Signed off — Alteration
B00228644-I1
02/25/2020
Special inspection requirement — HVAC and service water heating system controls
Shahrish Shuvo
02/25/2020
Special inspection requirement — HVAC insulation and sealing
Shahrish Shuvo
02/25/2020
Special inspection requirement — HVAC and service water heating equipment
Shahrish Shuvo
02/25/2020
Special inspection requirement — Maintenance information
Shahrish Shuvo
02/25/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
02/20/2020
Filed — Alteration
2 NEW EL HWHS, 2 NEW TOIL, 2 NEW LAVS, REL 1 TOIL, REL 1 LAV, 1 NEW ICE MAKER, 6 NEW NON-RES SINKS, 1 NEW DW, 9 NEW FD, 5 NEW FL SINKS, 1 NEW GT, 7 NEW NON-RES COOKING EQ, 1 NEW RPZ, 2 SEWER EJECTOR PUMPS, 1 NEW MUA AND 4 NEW SP HEADS OFF THE DOMESTIC
B00209036-P1
12/28/2019
Permit issued — Mechanical Systems
B00237618-I1-MS
11/25/2019
Permit issued — Plumbing
B00209036-I1-PL
11/13/2019
Permit issued — Structural
B00228644-I1-ST
10/04/2019
Filed — Alteration
INSTALLATION OF NEW HVAC SYSTEM, NEW KITCHEN EXHAUST SYSTEM, AND MAKE UP AIR SYSTEM
B00237618-I1
10/01/2019
Filed — Alteration
B00228644-I1
09/26/2019
Filed — Alteration
2 NEW EL HWHS, 2 NEW TOIL, 2 NEW LAVS, REL 1 TOIL, REL 1 LAV, 1 NEW ICE MAKER, 6 NEW NON-RES SINKS, 1 NEW DW, 9 NEW FD, 5 NEW FL SINKS, 1 NEW GT, 7 NEW NON-RES COOKING EQ, 1 NEW RPZ, 2 SEWER EJECTOR PUMPS, 1 NEW MUA AND 4 NEW SP HEADS OFF THE DOMESTIC
B00209036-I1
02/11/2016
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBALICO GENERAL CONTRACTIN12/28/2019
DOB NOWPlumbingSigned-offM&G PLUMBING AND HEATING11/25/2019
DOB NOWStructuralSigned-offBALICO GENERAL CONTRACTIN11/13/2019
BISBLISSUEDJ M S PLBG & HTG04/26/2005
BISPLISSUEDJ M S PLBG & HTG05/20/2003
BISOTISSUEDOLD RELIABLE STORE FIXTURES05/01/2003
2 projects · most recent 04/13/2021
General Wiring
FiledStatusContractorScope
04/13/2021CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/08/2018CompleteWILLDAN ELECTRICAL OF NY—
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
11/25/2020Mechanical SystemsShahrish Shuvospecial
11/25/2020Fire-Resistant Penetrations and JointsShahrish Shuvospecial
11/25/2020FinalShahrish Shuvoprogress
11/25/2020HVAC insulation and sealing Shahrish Shuvoenergy_progress
11/25/2020HVAC and service water heating system controls Shahrish Shuvoenergy_progress
11/25/2020Maintenance informationShahrish Shuvoenergy_progress
11/25/2020HVAC and service water heating equipment Shahrish Shuvoenergy_progress
10/15/2020Maintenance informationShahrish Shuvoenergy_progress
10/15/2020Mechanical SystemsShahrish Shuvospecial
10/15/2020FinalShahrish Shuvoprogress
10/15/2020HVAC and service water heating system controls Shahrish Shuvoenergy_progress
10/15/2020HVAC insulation and sealing Shahrish Shuvoenergy_progress
10/15/2020HVAC and service water heating equipment Shahrish Shuvoenergy_progress
10/15/2020Fire-Resistant Penetrations and JointsShahrish Shuvospecial
02/25/2020HVAC and service water heating system controls Shahrish Shuvoenergy_progress
02/25/2020HVAC insulation and sealing Shahrish Shuvoenergy_progress
02/25/2020HVAC and service water heating equipment Shahrish Shuvoenergy_progress
02/25/2020Maintenance informationShahrish Shuvoenergy_progress
02/25/2020Fire-Resistant Penetrations and JointsShahrish Shuvospecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Greening's Fine FoodsRestaurant / Food ServiceFloor 1
Project B00237618 Alteration · LOC Issued · 10/04/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00209036-I1Request digital key ↗
08/15/2026B00209036-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00237618-I1Request digital key ↗
08/15/2026B00237618-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00228644-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/23/2020321959948Open ↗
09/13/2019321959948Open ↗
▸BISWORK PERMIT APPLICATION1
11/07/2019321959948Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature14
08/26/2026B00209036-I1Open ↗
08/26/2026B00209036-I1Open ↗
08/26/2026B00209036-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/26/2026B00209036-I1Open ↗
08/26/2026B00237618-P1Open ↗
08/26/2026B00237618-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B00237618-P1Open ↗
08/13/2026B00237618-I1Open ↗
08/13/2026B00228644-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/25/2019321959948Open ↗
10/03/2019321959948Open ↗
09/13/2019321959948Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan5
08/13/2026B00209036-P1Open ↗
08/13/2026B00209036-I1Open ↗
08/13/2026B00237618-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes1
09/13/2019321959948Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B00237618-I1Open ↗
08/13/2026B00209036-P1Open ↗
08/13/2026B00228644-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/26/2019321959948Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/28/2019321959948Open ↗
09/13/2019321959948Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00209036-I1Open ↗
08/13/2026B00237618-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/16/2020321959948Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/16/2020321959948Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/16/2020321959948Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/29/2020321959948Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
10/16/2020321959948Open ↗
09/13/2019321959948Open ↗
▸BISWELDERS AFFIDAVIT1
10/23/2019321959948Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
09/13/2019321959948Open ↗
▸BISADDITIONAL INFORMATION1
09/13/2019321959948Open ↗
▸Other Documents1
▸BISKITCHEN FIRE SUPPRESSION SYSTEM1
12/23/2020321959948Open ↗