Public elementary, junior or senior high
P.S. 135 Sheldon A. Brookner
676 LINDEN BOULEVARD · BIN 3102005
💬 Discuss this project
1931Year Built
5Stories
W1Building Class
R5Zoning
54,375 sfGross Floor Area
1Units
LL97 Covered4 Open Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 64,000 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY409/13/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION 0403/22/2026
J N CONSTRUCTION GROUP403/22/2026
DOE K 135 040503/22/2026
DEPT OF EDUCATION P.S.135103/22/2026
DEPARTMENT OF EDUCATION1003/22/2026
DEPT OF EDUCATION P.S. 13203/22/2026
D.O.E. P.S.135503/22/2026
D.O.E. K 135 0103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STEPHEN B JACOBS GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S ELECTRIC INC.Electrical103/22/2026
CANDELA SYSTEMS CORP DBAElectrical103/22/2026
FRANCIS RICHARDSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351108/25/2023
Building Lifecycle
All (78)Filed (5)Violation (60)Objection (4)Special Inspection (9)
08/13/2026
Objection raised — Other
08/07/2026
Filed — Alteration
REMOVE & DISPOSE: EX. DBL CLF GATES, ASPHALT PAV AND BASE TO A DEPTH OF 1'-6" BELOW FG DISPOSE OF LEGALLY OFF SITE. IMPROVEMENTS: NEW ASPHALT, PERMEABLE PAVERS W/ TREE PITS AND TREE PLANTING, FLUSH CC, 15'-0" HT. CLF DOUBLE GATES, PLAY EQ. W/ SAFETY SURFA
B01366001-S3
08/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/06/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
04/18/2026
Objection raised — Other
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
03/31/2026
Filed — Alteration
REMOVE & DISPOSE: EX. DBL CLF GATES, ASPHALT PAV AND BASE TO A DEPTH OF 1'-6" BELOW FG DISPOSE OF LEGALLY OFF SITE. IMPROVEMENTS: NEW ASPHALT, PERMEABLE PAVERS W/ TREE PITS AND TREE PLANTING, FLUSH CC, 15'-0" HT. CLF DOUBLE GATES, PLAY EQ. W/ SAFETY SURFA
B01366001-S2
03/25/2026
Special inspection requirement — Final
03/18/2026
Objection raised — Other
03/18/2026
Objection raised — Other
03/11/2026
Filed — Alteration
REMOVE & DISPOSE: EX. DBL CLF GATES, ASPHALT PAV AND BASE TO A DEPTH OF 1'-6" BELOW FG DISPOSE OF LEGALLY OFF SITE. IMPROVEMENTS: NEW ASPHALT, PERMEABLE PAVERS W/ TREE PITS AND TREE PLANTING, FLUSH CC, 15'-0" HT. CLF DOUBLE GATES, PLAY EQ. W/ SAFETY SURFA
B01366001-S1
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/04/2026
Filed — Alteration
REMOVE & DISPOSE: EX. DBL CLF GATES, ASPHALT PAV AND BASE TO A DEPTH OF 1'-6" BELOW FG DISPOSE OF LEGALLY OFF SITE. IMPROVEMENTS: NEW ASPHALT, PERMEABLE PAVERS W/ TREE PITS AND TREE PLANTING, FLUSH CC, 15'-0" HT. CLF DOUBLE GATES, PLAY EQ. W/ SAFETY SURFA
B01366001-I1
02/09/2026
Violation issued (FDNY_NOV, closed)
11/17/2025
Violation issued (FDNY_ORDER, closed)
11/17/2025
Violation issued (FDNY_NOV, closed)
08/19/2025
Violation issued (FDNY_ORDER, closed)
11/22/2024
Violation issued (FDNY_ORDER, closed)
11/22/2024
Violation issued (FDNY_ORDER, closed)
03/15/2024
Violation issued (ECB, closed)
Construction
09/08/2023
Violation issued (FDNY_NOV, closed)
09/08/2023
Violation issued (FDNY_NOV, closed)
08/25/2023
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEMS FOR THE SECOND FLOOR AUDITORIUM.
B00924634-I1
08/24/2023
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/24/2023
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/24/2023
Special inspection requirement — Final
Asma Hashmi
03/10/2023
Violation issued (ECB, closed)
Construction
03/10/2023
Violation issued (ECB, closed)
Construction
05/05/2022
Violation issued (ECB, closed)
Construction
05/05/2022
Violation issued (ECB, closed)
Construction
05/05/2022
Violation issued (ECB, closed)
Construction
11/30/2021
Violation issued (FDNY_NOV, closed)
08/11/2021
Violation issued (ECB, closed)
Site Safety
08/11/2021
Violation issued (ECB, closed)
Construction
08/11/2021
Violation issued (ECB, closed)
Construction
08/11/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Violation issued (ECB, closed)
Construction
06/01/2020
Violation issued (ECB, closed)
Construction
06/01/2020
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/20/2017
Violation issued (ECB, closed)
Construction
11/14/2016
Violation issued (ECB, closed)
Construction
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDJ & N CONSTRUCTION GROUP08/03/2022
BISOTISSUEDJ & N CONSTRUCTION GROUP08/03/2022
BISOTISSUEDJ & N CONSTRUCTION GROUP08/03/2022
BISPLISSUEDFRANCO BELLI PLMG&HTG SON02/24/2022
BISEQISSUEDJ & N CONSTRUCTION GROUP12/08/2021
BISMHISSUEDKW TECH CORP08/10/2021
BISOTISSUEDJ & N CONSTRUCTION GROUP08/05/2021
BISMHRE-ISSUEDKW TECH CORP08/05/2021
BISOTISSUEDJ & N CONSTRUCTION GROUP08/05/2021
BISOTISSUEDJ & N CONSTRUCTION GROUP08/05/2021
BISOTISSUEDJ & N CONSTRUCTION GROUP08/03/2021
BISPLISSUEDFRANCO BELLI PLMG&HTG SON02/26/2021
BISOTISSUEDJ & N CONSTRUCTION GROUP12/18/2020
BISOTISSUEDJ & N CONSTRUCTION GROUP12/18/2020
BISOTISSUEDJ & N CONSTRUCTION GROUP12/18/2020
BISOTISSUEDJ & N CONSTRUCTION GROUP12/18/2020
BISEQISSUEDJ & N CONSTRUCTION GROUP12/18/2020
BISEQISSUEDJ & N CONSTRUCTION GROUP12/18/2020
BISMHISSUEDKW TECH CORP12/08/2020
BISEQISSUEDJ & N CONSTRUCTION GROUP11/25/2020
BISMHISSUEDKW TECH CORP02/26/2020
BISPLISSUEDFRANCO BELLI PLMG&HTG SON02/26/2020
BISOTISSUEDJ & N CONSTRUCTION GROUP02/26/2020
BISOTISSUEDJ & N CONSTRUCTION GROUP02/26/2020
BISOTISSUEDJ & N CONSTRUCTION GROUP02/26/2020
BISOTISSUEDJ & N CONSTRUCTION GROUP02/05/2020
BISEQISSUEDJ & N CONSTRUCTION GROUP01/08/2020
BISEQISSUEDJ & N CONSTRUCTION GROUP12/27/2019
BISEQISSUEDJ & N CONSTRUCTION GROUP12/06/2019
BISEQISSUEDABAX INC07/10/2018
BISEQISSUEDABAX INC06/22/2018
BISPLISSUEDATLANTIS PLBG&HTG CORP08/11/2015
BISOTISSUEDCM&E CON, INC12/11/2013
BISOTISSUEDCM&E CON, INC12/11/2013
BISPLISSUEDATLANTIS PLBG&HTG CORP12/03/2013
BISPLISSUEDFORSYTHE P&H CORP03/22/2013
BISOTISSUEDCM&E CON, INC03/22/2013
BISOTISSUEDCM&E CON, INC03/22/2013
BISEQISSUEDCM&E CON, INC01/10/2013
BISPLISSUEDMAR-SAL PLBG & HTG, INC03/26/2012
+ 10 more permits on file
1 project · most recent 08/25/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2023——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUB36TLAV1 34,000 BTU · Split System ×8
AOU120RLAVL 120,000 BTU · Condensing Unit ×2
1 project · most recent 08/07/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/07/2026——Storm, Water/Sanitary
12 projects · most recent 08/05/2026
General Wiring Lighting
FiledStatusContractorScope
08/05/2026Permit IssuedSTEEL CITY ELECTRICAL CONGeneral Wiring
04/20/2026Permit IssuedANCO ELECTL CONTCTNG INCGeneral Wiring
11/19/2024CompleteCANDELA SYSTEMS CORP DBALighting
04/05/2024CompleteGEMINI ELECTRIC CO., INC.—
10/16/2023CompleteANCO ELECTL CONTCTNG INC—
08/02/2023Permit IssuedA & S ELECTRIC INC.General Wiring
06/26/2023CompleteI.S.M. ELECTRIC, INC.—
01/12/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
11/27/2019CompleteI.S.M. ELECTRIC, INC.—
05/29/2018CompleteCHARAN ELEC'L ENTERP'S IN—
05/23/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
02/22/2018Permit IssuedSTANCO SYSTEM ELEC'L CONT—
1 project · most recent 08/07/2026
FiledStatusContractorScope
08/07/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/06/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
03/25/2026Final—progress
03/11/2026Fire-Resistant Penetrations and Joints—special
08/24/2023Mechanical SystemsAsma Hashmispecial
08/24/2023Energy Code Compliance InspectionsAsma Hashmiprogress
08/24/2023Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/24/2023Post-installed AnchorsAsma Hashmispecial
08/24/2023FinalAsma Hashmiprogress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026B00924634-I1Request digital key ↗
08/18/2026B01366001-I1Request digital key ↗
08/18/2026B01366001-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/09/2009310311230Open ↗
▸BISWORK PERMIT APPLICATION1
03/24/2009310311230Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B00924634-I1Open ↗
08/18/2026B01366001-I1Open ↗
08/18/2026B01366001-S3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00924634-I1Open ↗
08/28/2026B00924634-I1Open ↗
08/28/2026B00924634-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/07/2009310311230Open ↗
03/09/2009310311230Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00924634-I1Open ↗
08/28/2026B00924634-I1Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/09/2009310311230Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/18/2026B01366001-S3Open ↗
08/13/2026B00924634-I1Open ↗
08/13/2026B01366001-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/18/2026B01366001-S3Open ↗
08/13/2026B01366001-S1Open ↗
08/13/2026B01366001-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/15/2026B01366001-S2Open ↗
08/13/2026B01366001-S1Open ↗
08/13/2026B01366001-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/07/2009310311230Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/09/2009310311230Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/07/2009310311230Open ↗
03/09/2009310311230Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/09/2009310311230Open ↗
▸Other Documents4
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal4
08/18/2026B01366001-S3Open ↗
08/13/2026B01366001-S1Open ↗
08/13/2026B01366001-I1Open ↗
Showing 3 of 4 on file for this type