← Back
Three families
677 GREENE AVENUE
BROOKLYN · BIN 3050319
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,192 sfGross Floor Area
3Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
Three families · 1,900 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 31p · 1 filing · 6 docs
Floor 21p · 1 filing · 6 docs
Floor 11p · 1 filing · 20 docs
Cellar4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/26/2018$1.9M—— → —$587/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AZAR ASSOCIATES1303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URBAN STANDARD GENERAL COGeneral Contractor303/21/2026
NU-WAY HEATING & COOLINGGeneral Contractor203/21/2026
RIDGEFIELD CORPGeneral Contractor207/08/2026
DIMAGGIO CALOGEROGeneral Contractor103/21/2026
GOTHAM PLUMBINGGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANG PARK ARCH. P.C.663811/08/2024
NEW AGE ENGINEERING PLLC7746403/13/2024
MADSEN ENGINEERING5423710/02/2023
Building Lifecycle
All (92)Filed (15)Permit Issued (4)Signed Off (5)Violation (19)Objection (19)Special Inspection (30)
05/04/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
11/19/2024
Signed off — Alteration
REMOVAL OF NON-LOAD BEARING PARTITONS, CABINETS, FLOORING AND FINISHES, NEWCABINETRY, GWB PARTITIONS, DROPPED CEILINGS AND DOORS ALL AS PER PLANS FILED.NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B00912234-I1
11/18/2024
Special inspection requirement — Interior lighting power
Chang Park
11/18/2024
Special inspection requirement — Lighting controls
Chang Park
11/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
11/18/2024
Special inspection requirement — Final
Chang Park
11/18/2024
Special inspection requirement — Lighting in dwelling units
Chang Park
11/08/2024
Filed — Alteration
REMOVAL OF NON-LOAD BEARING PARTITONS, CABINETS, FLOORING AND FINISHES, NEWCABINETRY, GWB PARTITIONS, DROPPED CEILINGS AND DOORS ALL AS PER PLANS FILED.NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B00912234-P2
11/06/2024
Special inspection requirement — Final
Chang Park
11/06/2024
Special inspection requirement — Interior lighting power
Chang Park
11/06/2024
Special inspection requirement — Lighting controls
Chang Park
11/06/2024
Special inspection requirement — Lighting in dwelling units
Chang Park
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
10/18/2024
Signed off — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS, NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
B00920961-I1
09/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
09/10/2024
Filed — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS, NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
B00920961-P4
09/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
08/09/2024
Objection resolved — Addressed
08/07/2024
Objection raised — Scope
07/31/2024
Filed — Alteration
REMOVAL OF NON-LOAD BEARING PARTITONS, CABINETS, FLOORING AND FINISHES, NEWCABINETRY, GWB PARTITIONS, DROPPED CEILINGS AND DOORS ALL AS PER PLANS FILED.NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B00912234-P1
07/30/2024
Special inspection requirement — Lighting controls
Chang Park
07/30/2024
Special inspection requirement — Interior lighting power
Chang Park
07/30/2024
Special inspection requirement — Lighting in dwelling units
Chang Park
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
07/30/2024
Special inspection requirement — Final
Chang Park
07/12/2024
Filed — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS, NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
B00920961-P3
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
05/08/2024
Signed off — Alteration
INSTALL NEW HVAC SPLIT SYSTEM, BATHROOM EXHAUST FANS, AND ASSOCIATED DUCTS, VENTS, AND PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPACY OR EGRESS.
B00927196-I1
04/10/2024
Violation issued (HPD, open)
A
03/13/2024
Filed — Alteration
INSTALL NEW HVAC SPLIT SYSTEM, BATHROOM EXHAUST FANS, AND ASSOCIATED DUCTS, VENTS, AND PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPACY OR EGRESS.
B00927196-P1
02/01/2024
Objection raised — Other
02/01/2024
Objection resolved — Addressed
01/28/2024
Filed — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS, NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
B00920961-P2
01/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
01/19/2024
Permit issued — Mechanical Systems
B00927196-I1-MS
01/16/2024
Objection raised — Other
01/16/2024
Objection resolved — Addressed
01/10/2024
Filed — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS, NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
B00920961-P1
01/08/2024
Signed off — Alteration
STRUCTURAL REINFORCEMENTS PER PLANS FILED. NO CHANGE IN OCCUPANCY USE OR EGRESS
B00871313-S1
12/28/2023
Signed off — Alteration
STRUCTURAL REINFORCEMENTS PER PLANS FILED. NO CHANGE IN OCCUPANCY USE OR EGRESS
B00871313-I1
11/21/2023
Violation issued (HPD, open)
I
10/10/2023
Permit issued — Foundation
B00871313-S1-FO
10/05/2023
Special inspection requirement — Final
Erik Madsen
10/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Erik Madsen
10/05/2023
Special inspection requirement — Subgrade Inspections
Erik Madsen
10/05/2023
Special inspection requirement — Concrete - Cast-In-Place
Erik Madsen
10/05/2023
Special inspection requirement — Post-installed Anchors
Erik Madsen
10/05/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Erik Madsen
10/05/2023
Special inspection requirement — Footing and Foundation
Erik Madsen
10/03/2023
Filed — Alteration
INSTALL NEW HVAC SPLIT SYSTEM, BATHROOM EXHAUST FANS, AND ASSOCIATED DUCTS, VENTS, AND PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPACY OR EGRESS.
B00927196-I1
10/02/2023
Filed — Alteration
STRUCTURAL REINFORCEMENTS PER PLANS FILED. NO CHANGE IN OCCUPANCY USE OR EGRESS
B00871313-P2
10/02/2023
Special inspection requirement — Footing and Foundation
Erik Madsen
10/02/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Erik Madsen
10/02/2023
Special inspection requirement — Subgrade Inspections
Erik Madsen
10/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Erik Madsen
09/22/2023
Permit issued — Structural
B00871313-I1-ST
09/22/2023
Objection resolved — Addressed
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNU-WAY HEATING & COOLING01/19/2024
DOB NOWFoundationSigned-offRIDGEFIELD CORP10/10/2023
DOB NOWStructuralSigned-offRIDGEFIELD CORP09/22/2023
DOB NOWGeneral ConstructionSigned-offURBAN STANDARD GENERAL CO09/21/2023
1 project · most recent 10/09/2023
General Wiring
FiledStatusContractorScope
10/09/2023CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
1 project · most recent 06/16/2023
FiledStatusContractorScope
06/16/2023——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
11/18/2024Interior lighting powerChang Parkenergy_progress
11/18/2024Lighting controlsChang Parkenergy_progress
11/18/2024Fire-Resistant Penetrations and JointsChang Parkspecial
11/18/2024FinalChang Parkprogress
11/18/2024Lighting in dwelling unitsChang Parkenergy_progress
11/06/2024FinalChang Parkprogress
11/06/2024Interior lighting powerChang Parkenergy_progress
11/06/2024Lighting controlsChang Parkenergy_progress
11/06/2024Lighting in dwelling unitsChang Parkenergy_progress
11/06/2024Fire-Resistant Penetrations and JointsChang Parkspecial
09/12/2024Fire-Resistant Penetrations and JointsChang Parkspecial
09/10/2024Fire-Resistant Penetrations and JointsChang Parkspecial
07/30/2024Lighting controlsChang Parkenergy_progress
07/30/2024Interior lighting powerChang Parkenergy_progress
07/30/2024Lighting in dwelling unitsChang Parkenergy_progress
07/30/2024Fire-Resistant Penetrations and JointsChang Parkspecial
07/30/2024FinalChang Parkprogress
07/01/2024Fire-Resistant Penetrations and JointsChang Parkspecial
01/26/2024Fire-Resistant Penetrations and JointsChang Parkspecial
10/05/2023FinalErik Madsenprogress
10/05/2023Structural Stability – Alterations of existing buildingsErik Madsenspecial
10/05/2023Subgrade InspectionsErik Madsenspecial
10/05/2023Concrete - Cast-In-PlaceErik Madsenspecial
10/05/2023Post-installed AnchorsErik Madsenspecial
10/05/2023Subsurface Conditions – Fill Placement & In-Place DensityErik Madsenspecial
Latest 25 of 46.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/27/2026B00871313-I1Request digital key ↗
08/27/2026B00871313-P2Request digital key ↗
08/27/2026B00871313-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/27/2026B00871313-P2Open ↗
08/27/2026B00871313-P1Open ↗
08/27/2026B00871313-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/30/2026B00912234-I1Open ↗
09/30/2026B00912234-I1Open ↗
09/30/2026B00912234-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/30/2026B00912234-I1Open ↗
09/25/2026B00920961-P4Open ↗
08/28/2026B00920961-P2Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/27/2026B00871313-P2Open ↗
08/27/2026B00871313-P1Open ↗
08/27/2026B00871313-I1Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00920961-P1Open ↗