← Back
Elevator apt, semi-fireproof without stores
679 MARCY AVENUE
BROOKLYN · BIN 3429149
💬 Discuss this project
2024Year Built
6Stories
D1Building Class
R7AZoning
9,176 sfGross Floor Area
10Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: MARCY HEIGHTS LLC · 2,500 sf lot · 3.67 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof9p · 4 filings · 20 docs
Bulkhead3p · 1 filing · 13 docs
Floor 68p · 3 filings · 20 docs
Floor 54p · 3 filings · 20 docs
Floor 47p · 4 filings · 20 docs
Floor 35p · 3 filings · 20 docs
Floor 29p · 3 filings · 20 docs
Floor 17p · 2 filings · 20 docs
Cellar12p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TWIN GROUP ASSOCIATES5407/08/2026
DORIA507/08/2026
OWNER'S REP807/08/2026
GROUP ASSOCIATES INC TWIN103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/08/2020$1.4M—Private party → MARCY HEIGHTS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS103/21/2026
SPEEDY EXPEDITING2003/21/2026
EXPRESS FILING INC803/21/2026
GREEN STUDIO203/21/2026
THE GREEN STUDIO203/21/2026
EXPEDITING 4 U103/21/2026
MILLENNIUM DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TWIN GROUP ASSOCIATES INCGeneral Contractor2207/08/2026
GWT ENTERPRISES INCGeneral Contractor407/08/2026
PLBG P & H INCPlumbing307/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
TRISTATE FIRE SPRINK INCFire Protection107/08/2026
VILLAGE ELECTL CONTRS INC 004467General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC15141409/23/2024
SKYLINE RIGGING7880104/11/2024
Building Lifecycle
All (108)Filed (21)Permit Issued (13)Signed Off (9)Violation (8)Inspection (6)Objection (18)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
12/27/2024
Violation issued (ECB, closed)
Boilers
11/08/2024
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION TO NEW BUILDING JOB #321591871
B00373825-I1
10/28/2024
Signed off — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION TO NEW BUILDING JOB #321591871
B00373780-I1
10/09/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
10/08/2024
Signed off — Alteration
INSTALLATION OF MECHANICAL VENTILATION SYSTEMS, HEATING AND COOLING EQUIPMENTS, HOT WATER HEATER EQUIPMENTS, ENERGY RECOVERY SYSTEMS, ANDDUCTWORK IN-CONJUNCTION WITH NB APPLICATION # 321591871.
B00373676-I1
10/08/2024
Signed off — Alteration
B01034077-I1
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
09/30/2024
Special inspection requirement — Sprinkler Systems
RAUL VELASQUEZ MARTINEZ
09/23/2024
Filed — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION TO NEW BUILDING JOB #321591871
B00373780-P2
09/05/2024
Special inspection requirement — Mechanical Systems
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — Maintenance information
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — Duct leakage testing, insulation and design
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — Heating Systems
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — HVAC insulation and sealing
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — Energy Code Compliance Inspections
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — Shutoff dampers
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
09/05/2024
Special inspection requirement — Electrical motors and elevators
RAUL VELASQUEZ MARTINEZ
09/04/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLDING, ROOF PROTECTION, AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01013174-I1
08/28/2024
Filed — Alteration
INSTALLATION OF MECHANICAL VENTILATION SYSTEMS, HEATING AND COOLING EQUIPMENTS, HOT WATER HEATER EQUIPMENTS, ENERGY RECOVERY SYSTEMS, ANDDUCTWORK IN-CONJUNCTION WITH NB APPLICATION # 321591871.
B00373676-P3
08/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/12/2024
Signed off — Alteration
B00362442-I1
08/08/2024
Signed off — Alteration
STRUCTURAL APPLICATION FILED IN CONJUNCTION TO NEW BUILDING JOB # 321591871.
B00351807-I1
08/08/2024
Special inspection requirement — HVAC and service water heating equipment
RAUL VELASQUEZ MARTINEZ
08/08/2024
Special inspection requirement — HVAC and service water heating system controls
RAUL VELASQUEZ MARTINEZ
08/08/2024
Special inspection requirement — HVAC insulation and sealing
RAUL VELASQUEZ MARTINEZ
08/08/2024
Special inspection requirement — Maintenance information
RAUL VELASQUEZ MARTINEZ
08/08/2024
Special inspection requirement — Energy Code Compliance Inspections
RAUL VELASQUEZ MARTINEZ
08/08/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RAUL VELASQUEZ MARTINEZ
08/08/2024
Special inspection requirement — Electrical motors
RAUL VELASQUEZ MARTINEZ
08/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
08/07/2024
421-a(16) registration filed
07/31/2024
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION TO NEW BUILDING JOB #321591871
B00373825-P5
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
07/31/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RAUL VELASQUEZ MARTINEZ
07/31/2024
Special inspection requirement — HVAC and service water heating equipment
RAUL VELASQUEZ MARTINEZ
07/31/2024
Special inspection requirement — Energy Code Compliance Inspections
RAUL VELASQUEZ MARTINEZ
07/31/2024
Special inspection requirement — HVAC and service water heating system controls
RAUL VELASQUEZ MARTINEZ
07/31/2024
Special inspection requirement — HVAC insulation and sealing
RAUL VELASQUEZ MARTINEZ
07/31/2024
Special inspection requirement — Electrical motors
RAUL VELASQUEZ MARTINEZ
06/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/11/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/05/2024
Permit issued — Mechanical Systems
B00373676-I1-MS
05/28/2024
Violation issued (ECB, closed)
Construction
05/20/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLDING, ROOF PROTECTION, AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01013174-P1
05/01/2024
Permit issued — Suspended Scaffold
B01034077-I1-SC
04/25/2024
Violation issued (ECB, closed)
Unknown
04/25/2024
Violation issued (ECB, closed)
Unknown
04/11/2024
Filed — Alteration
B01034077-I1
04/11/2024
Permit issued — Suspended Scaffold
B01034077-I1-SC
04/04/2024
Permit issued — Sprinklers
B00373780-I1-EW-SP
03/29/2024
Violation issued (ECB, closed)
Unknown
03/12/2024
Permit issued — Structural
B00351807-I1-ST
03/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/01/2024
Permit issued — Supported Scaffold
B01013174-I1-SH
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTWIN GROUP ASSOCIATES INC06/05/2024
DOB NOWSuspended ScaffoldSigned-offDORIA, INC05/01/2024
DOB NOWSuspended ScaffoldSigned-offDORIA, INC04/11/2024
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC04/04/2024
DOB NOWStructuralSigned-offTWIN GROUP ASSOCIATES INC03/12/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC03/01/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC03/01/2024
DOB NOWPlumbingSigned-offPLBG P & H INC02/02/2024
DOB NOWConstruction FenceSigned-offTWIN GROUP ASSOCIATES INC11/15/2023
DOB NOWMechanical SystemsSigned-offTWIN GROUP ASSOCIATES INC06/14/2023
DOB NOWStructuralSigned-offTWIN GROUP ASSOCIATES INC03/14/2023
DOB NOWConstruction FenceSigned-offTWIN GROUP ASSOCIATES INC11/18/2022
DOB NOWConstruction FenceSigned-offTWIN GROUP ASSOCIATES INC03/02/2022
BIS—ISSUEDTWIN GROUP ASSOCIATES INC02/06/2024
BIS—RE-ISSUEDTWIN GROUP ASSOCIATES INC02/06/2024
BIS—ISSUEDTWIN GROUP ASSOCIATES INC02/01/2024
BIS—ISSUEDTWIN GROUP ASSOCIATES INC02/01/2024
BIS—ISSUEDTWIN GROUP ASSOCIATES INC01/18/2024
BIS—ISSUEDTWIN GROUP ASSOCIATES INC01/18/2024
BIS—ISSUEDTWIN GROUP ASSOCIATES INC12/11/2023
BIS—ISSUEDTWIN GROUP ASSOCIATES INC12/11/2023
BIS—ISSUEDTWIN GROUP ASSOCIATES INC10/24/2023
BIS—ISSUEDTWIN GROUP ASSOCIATES INC10/24/2023
BIS—ISSUEDTWIN GROUP ASSOCIATES INC06/15/2023
BIS—ISSUEDTWIN GROUP ASSOCIATES INC06/15/2023
BIS—ISSUEDTWIN GROUP ASSOCIATES INC07/05/2022
BIS—ISSUEDTWIN GROUP ASSOCIATES INC07/05/2022
BIS—ISSUEDTWIN GROUP ASSOCIATES INC07/05/2022
BIS—ISSUEDTWIN GROUP ASSOCIATES INC07/05/2022
BIS—ISSUEDTWIN GROUP ASSOCIATES INC06/29/2021
BIS—ISSUEDTWIN GROUP ASSOCIATES INC06/23/2021
5 projects · most recent 09/26/2024
General Wiring
FiledStatusContractorScope
09/26/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
05/07/2024CompletePOWER DIRECT ELECTRIC INC—
05/01/2024CompletePOWER DIRECT ELECTRIC INC—
04/25/2024CompletePOWER DIRECT ELECTRIC INC—
12/01/2023CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/09/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/11/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
09/30/2024Sprinkler SystemsRAUL VELASQUEZ MARTINEZspecial
09/30/2024Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
09/05/2024HVAC-R and service water heating system controlsRAUL VELASQUEZ MARTINEZenergy_progress
09/05/2024Electrical motors and elevatorsRAUL VELASQUEZ MARTINEZenergy_progress
09/05/2024HVAC-R and service water piping design and insulationRAUL VELASQUEZ MARTINEZenergy_progress
09/05/2024Shutoff dampersRAUL VELASQUEZ MARTINEZenergy_progress
09/05/2024Duct leakage testing, insulation and designRAUL VELASQUEZ MARTINEZenergy_progress
09/05/2024HVAC-R and service water heating equipmentRAUL VELASQUEZ MARTINEZenergy_progress
09/05/2024HVAC insulation and sealing RAUL VELASQUEZ MARTINEZenergy_progress
09/05/2024Energy Code Compliance InspectionsRAUL VELASQUEZ MARTINEZprogress
09/05/2024FinalRAUL VELASQUEZ MARTINEZprogress
09/05/2024Heating SystemsRAUL VELASQUEZ MARTINEZspecial
09/05/2024Mechanical SystemsRAUL VELASQUEZ MARTINEZspecial
09/05/2024Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
09/05/2024Maintenance informationRAUL VELASQUEZ MARTINEZenergy_progress
08/08/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRAUL VELASQUEZ MARTINEZspecial
08/08/2024Maintenance informationRAUL VELASQUEZ MARTINEZenergy_progress
08/08/2024HVAC insulation and sealing RAUL VELASQUEZ MARTINEZenergy_progress
08/08/2024HVAC and service water heating equipment RAUL VELASQUEZ MARTINEZenergy_progress
08/08/2024Electrical motorsRAUL VELASQUEZ MARTINEZenergy_progress
08/08/2024HVAC and service water heating system controls RAUL VELASQUEZ MARTINEZenergy_progress
08/08/2024Energy Code Compliance InspectionsRAUL VELASQUEZ MARTINEZprogress
08/08/2024Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
07/31/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRAUL VELASQUEZ MARTINEZspecial
07/31/2024Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
Latest 25 of 63.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00373676-I1Request digital key ↗
09/02/2026B00373676-P3Request digital key ↗
08/15/2026B00373676-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch4
09/01/2026B00533480-I1Request digital key ↗
08/25/2026B01034077-I1Request digital key ↗
08/25/2026B01013174-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural4
08/28/2026B00351807-P2Request digital key ↗
08/28/2026B00351807-P3Request digital key ↗
08/28/2026B00351807-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00373825-I1Request digital key ↗
09/02/2026B00373825-P5Request digital key ↗
09/02/2026B00373825-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/02/2026B00373780-I1Request digital key ↗
09/02/2026B00373780-P1Request digital key ↗
09/02/2026B00373780-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00431018-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00362442-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
11/28/2022340738866Open ↗
10/20/2022340738866Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/14/2022340738866Open ↗
▸Seals & Professional Certifications58
▸DOB NOWProgress Inspector Seal & Signature23
08/29/2026B00431018-I1Open ↗
08/26/2026B00373676-I1Open ↗
08/26/2026B00373676-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/25/2026B01013174-I1Open ↗
08/25/2026B01013174-P1Open ↗
08/13/2026B00431018-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/24/2026B01034077-I1Open ↗
08/26/2026B00373676-I1Open ↗
08/26/2026B00373676-I1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/26/2020340738866Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWFDNY: Letter of No Objection3
08/13/2026B00373780-P1Open ↗
08/13/2026B00373780-I1Open ↗
08/13/2026B00373780-P2Open ↗
▸Safety & Tenant Protection2
▸BISBPP: STREET TREES SITE PLAN1
11/23/2022340738866Open ↗
▸BISSTREET TREE CHECKLIST1
11/23/2022340738866Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00373676-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
09/17/2024340738866Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
08/28/2024340738866Open ↗
11/23/2022340738866Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/14/2022340738866Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/26/2020340738866Open ↗
▸Other Documents5
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/23/2022340738866Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/14/2022340738866Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/23/2022340738866Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01034077-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01034077-I1Open ↗