← Back
Walk-up apt, over six families with stores
679 METROPOLITAN AVENUE
BROOKLYN · East Williamsburg · BIN 3068716
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R7AZoning
24,000 sfGross Floor Area
36Units
Rent Stabilized139 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · 5,550 sf lot · 4.32 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar9p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GRIFFIN BUILDING CORP1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.301/24/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAM ENERGY HTG&MECH CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808201/24/2023
Building Lifecycle
All (73)Filed (3)Permit Issued (2)Signed Off (2)Violation (60)Inspection (4)Special Inspection (2)
05/05/2026
Violation issued (HPD, open)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2025
Violation issued (HPD, closed)
A
04/11/2024
Violation issued (HPD, closed)
A
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2023
Violation issued (HPD, closed)
A
03/17/2023
Signed off — Alteration
B00784936-I1
03/15/2023
Signed off — Alteration
REFILE DOB JOB No. 301089300 FOR INSTALLATION OF NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00784942-I1
01/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
01/24/2023
Filed — Alteration
REFILE DOB JOB No. 301089300 FOR INSTALLATION OF NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00784942-P1
12/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/30/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/27/2022
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
09/05/2022
Permit issued — Boiler Equipment
B00784936-I1-BE
09/03/2022
Permit issued — Plumbing
B00784942-I1-PL
08/29/2022
Filed — Alteration
B00784936-I1
08/29/2022
Filed — Alteration
REFILE DOB JOB No. 301089300 FOR INSTALLATION OF NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00784942-I1
08/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
03/01/2022
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
A
02/12/2019
Violation issued (FDNY_NOV, closed)
08/09/2018
Violation issued (HPD, open)
B
08/09/2018
Violation issued (HPD, open)
B
08/09/2018
Violation issued (HPD, open)
B
08/09/2018
Violation issued (HPD, open)
B
08/09/2018
Violation issued (HPD, open)
B
08/09/2018
Violation issued (HPD, open)
B
08/09/2018
Violation issued (HPD, open)
A
08/09/2018
Violation issued (HPD, open)
A
08/09/2018
Violation issued (HPD, open)
B
06/28/2018
Violation issued (HPD, open)
A
06/28/2018
Violation issued (HPD, open)
B
06/28/2018
Violation issued (HPD, open)
C
06/28/2018
Violation issued (HPD, open)
A
04/05/2018
Violation issued (FDNY_NOV, closed)
11/29/2017
Violation issued (HPD, open)
C
11/29/2017
Violation issued (HPD, closed)
A
03/15/2017
Violation issued (HPD, open)
C
03/15/2017
Violation issued (HPD, closed)
A
11/10/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/23/2015
Violation issued (HPD, closed)
I
08/15/2013
Violation issued (HPD, open)
B
08/15/2013
Violation issued (HPD, open)
B
08/15/2013
Violation issued (HPD, open)
B
08/15/2013
Violation issued (HPD, open)
B
08/15/2013
Violation issued (HPD, open)
B
08/15/2013
Violation issued (HPD, open)
B
07/12/2013
Violation issued (HPD, closed)
C
07/12/2013
Violation issued (HPD, open)
A
07/12/2013
Violation issued (HPD, closed)
B
07/12/2013
Violation issued (HPD, open)
A
07/12/2013
Violation issued (HPD, closed)
B
07/12/2013
Violation issued (HPD, open)
A
07/12/2013
Violation issued (HPD, open)
B
07/12/2013
Violation issued (HPD, open)
B
07/12/2013
Violation issued (HPD, closed)
C
07/12/2013
Violation issued (HPD, open)
B
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH09/05/2022
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP09/03/2022
BISFBISSUEDMETRO FUEL OIL CORP11/03/2000
BISPLISSUEDMETRO PLBG SERVICES CORP11/03/2000
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2022Pass-Final Boiler Equipment InspectionPassView ↗
09/27/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
01/25/2023Fire-Resistant Penetrations and JointsJoseph Bazinispecial
08/29/2022HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B00784942-I1Request digital key ↗
08/28/2026B00784942-P1Request digital key ↗
08/28/2026B00784936-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B00784942-I1Open ↗
08/28/2026B00784942-P1Open ↗
08/28/2026B00784936-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B00784936-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00784942-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026B00784942-I1Open ↗
08/28/2026B00784942-P1Open ↗
08/28/2026B00784936-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00784936-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00784936-I1Open ↗