← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
679 VAN SINDEREN AVENUE
BROOKLYN · BIN 3427011
💬 Discuss this project
2018Year Built
7Stories
RMBuilding Class
R7AZoning
132,557 sfGross Floor Area
104Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Van Sinderen Plaza Housing Development F Und · 37,550 sf lot · 3.53 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3 filings
Floor 72 filings
Floor 62 filings
Floor 54 filings
Floor 44 filings
Floor 34 filings
Floor 24 filings
Floor 111 filings
Cellar1 filing
Site & exterior5 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Van Sinderen Plaza2503/21/2026
New Van Sinderen Lots2203/21/2026
2155 Morris110/26/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Design Studio403/21/2026
J A Expediting603/21/2026
HV Associates403/21/2026
Louis Striar403/21/2026
William Vitacco Associates303/21/2026
Synergy Building Consultants203/21/2026
Eurocelt Expediting603/21/2026
Indesign Studio403/21/2026
Rigid Structural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold603/21/2026
Fluid MechanicsPlumbing403/22/2026
Sign Master USAspecialty_contractor303/21/2026
Macquesten Cons. ManagementGeneral Contractor203/21/2026
MC SuperstructureScaffold207/08/2026
FVC ElectricGeneral Contractor103/22/2026
Philip Habib AssociatesGeneral Contractor103/22/2026
Neptune Signs & AwningsSign hanger107/08/2026
Boyd MechanicalPlumbing107/08/2026
Mega PlumbingPlumbing107/08/2026
FVC ElectricElectrical103/21/2026
New York Standard Mechanical CoFire Protection107/08/2026
Newbridge Electl ContngElectrical103/22/2026
V. Vass ElectricElectrical103/22/2026
Optimal ElectricElectrical103/21/2026
Zerem ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252610/17/2022
Yan Gao6619207/05/2022
Walter T. Gorman, P.E., P268308/07/2020
Certified Testing Laborat396104/14/2020
Building Lifecycle
10/23/2026
Filed — Alteration
B01400063-I1
07/27/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/01/2026
Elevator Category 1 inspection report filed
07/01/2026
Elevator Category 5 inspection report filed
03/28/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 219, 2nd STORY, 9th APARTMENT FROM NORTH AT EAST
HPD violation · closed
263 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
Nothing on file for this building.
498 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account