← Back
Walk-up cooperative
68-01 BELL BOULEVARD
QUEENS · BIN 4450814
💬 Discuss this project
1949Year Built
2Stories
C6Building Class
R3-2Zoning
208,800 sfGross Floor Area
197Units
LL97 CoveredRent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: UNITED VETERANS MUTUAL HOUSING · 297,579 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG ENGINEERING PLLC305/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCX DESIGN603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RONG MAINTENANCE INCGeneral Contractor303/21/2026
R & T ELECTRICAL CORPElectrical103/22/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG ENGINEERING PLLC8512305/30/2024
Building Lifecycle
All (23)Filed (3)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (11)
07/05/2024
Signed off — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00971012-S1
07/05/2024
Signed off — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00971012-I1
06/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
05/30/2024
Filed — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00971012-P2
05/30/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
05/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
05/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
05/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
05/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
05/10/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
04/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/21/2023
Permit issued — Plumbing
Q00971012-S1-PL
12/18/2023
Permit issued — General Construction
Q00971012-I1-GC
12/05/2023
Filed — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00971012-S1
12/05/2023
Filed — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00971012-I1
12/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
12/04/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
12/04/2023
Special inspection requirement — Final
XIAO ZHENG
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC12/21/2023
DOB NOWGeneral ConstructionSigned-offRONG MAINTENANCE INC12/18/2023
1 project · most recent 04/09/2024
General Wiring
FiledStatusContractorScope
04/09/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
04/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/30/2024Energy Code Compliance InspectionsXIAO ZHENGprogress
05/30/2024HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
05/30/2024Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
05/10/2024HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
05/10/2024Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
05/10/2024Energy Code Compliance InspectionsXIAO ZHENGprogress
12/05/2023HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
12/04/2023Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
12/04/2023Energy Code Compliance InspectionsXIAO ZHENGprogress
12/04/2023Fire-Resistance Rated ConstructionXIAO ZHENGprogress
12/04/2023FinalXIAO ZHENGprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026Q00971012-P2Request digital key ↗
08/22/2026Q00971012-S1Request digital key ↗
08/22/2026Q00971012-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026Q00971012-S1Open ↗
08/31/2026Q00971012-S1Open ↗
08/28/2026Q00971012-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026Q00971012-I1Open ↗
08/22/2026Q00971012-P2Open ↗
08/22/2026Q00971012-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026Q00971012-S1Open ↗
08/28/2026Q00971012-P2Open ↗
08/27/2026Q00971012-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026Q00971012-I1Open ↗
08/22/2026Q00971012-P2Open ↗
08/22/2026Q00971012-S1Open ↗