BuildNYC
Elevator apt, semi-fireproof without stores
The Woodhaven
68-19 WOODHAVEN BOULEVARD · Rego Park · BIN 4625089
💬 Discuss this project
2024Year Built
7Stories
D1Building Class
R6AZoning
109,587 sfGross Floor Area
120Units
2 Active Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 68-19 Woodhaven Housing Development Fund · 26,152 sf lot · 4.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRestoring Communities HDFC31p · 2 filings · 9 docs
BulkheadRestoring Communities HDFC2p · 1 filing · 6 docs
Floor 7Restoring Communities HDFC25p · 1 filing · 6 docs
Floor 6Restoring Communities HDFC27p · 1 filing · 6 docs
Floor 5Restoring Communities HDFC27p · 1 filing · 6 docs
Floor 4Restoring Communities HDFC25p · 1 filing · 6 docs
Floor 3Restoring Communities HDFC25p · 1 filing · 6 docs
Floor 2Restoring Communities HDFC25p · 1 filing · 6 docs
Floor 1Restoring Communities HDFC25p · 1 filing · 6 docs
Site & exteriorRestoring Communities HDFC14p · 5 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Restoring Communities HDFC1707/08/2026
Rego Park Realty203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/19/2023$12.5M—Z&Z WOODHAVEN LLC → 68-19 WOODHAVEN HOUSING DEVELOPMENT FUND CORPORATI— not available
07/30/2019$5.3M—REGO PARK REALTY, LLC → 68-19 REGO PARK LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hussein Saad106/30/2025
George J. Xerakias, PE106/20/2025
Patuxent Engineering405/15/2025
Tohfaz Uddin PE101/09/2025
Paul Perdek212/13/2024
Ashraf208/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HS Design Studio203/21/2026
Patuxent Engineering803/21/2026
A1 Expediting Service603/21/2026
Green Studio403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold603/21/2026
First Standard ConstructionScaffold404/09/2026
Rockledge ScaffoldScaffold304/09/2026
Emes Solarspecialty_contractor303/21/2026
BunlinScaffold207/08/2026
Amer-A-Pipe Plumbing & HeatingPlumbing103/21/2026
Planet Construction & DevelopmentGeneral Contractor112/04/2014
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272106/30/2025
George J. Xerakias, PE1658106/20/2025
Building Lifecycle
09/08/2026
Signed off — Alteration
Q00783487-I1
09/08/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00783704-I1
06/05/2026
Signed off — Alteration
Q01222154-I1
03/30/2026
Signed off — Alteration
INSTALLATION OF MAGNI CRANE PLACEMENT IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01174692-I1
01/16/2026
Signed off — Alteration
INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01168809-I1
35 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offElm Suspension Systems08/11/2025
DOB NOWSolarSigned-offEmes Solar07/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offBunlin02/10/2025
DOB NOWSupported ScaffoldSigned-offBunlin01/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold01/10/2025
DOB NOWSidewalk ShedSigned-offRockledge Scaffold12/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold12/16/2024
DOB NOWConstruction FenceSigned-offFirst Standard Construction02/18/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY08/11/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY08/11/2022
DOB NOWConstruction FenceSigned-offFirst Standard Construction02/01/2022
BISPLISSUEDAmer-A-Pipe Plumbing & Heating01/23/2015
BISOTISSUEDPlanet Construction & de12/04/2014
9 projects · most recent 04/30/2026
General Wiring
FiledStatusContractorScope
04/30/2026CompleteRoz-A-Lite Electrical Contracting—
02/04/2026CompleteRoz-A-Lite Electrical Contg IGeneral Wiring
01/09/2026CompleteB.P. Electric—
02/17/2025CancelledRoz-A-Lite Electrical Contg IGeneral Wiring
01/31/2025CancelledRoz-A-Lite Electrical Contg IGeneral Wiring
01/09/2025CompleteAnthony G FerryGeneral Wiring
11/07/2024CompleteAnthony G Ferry—
08/01/2022CompleteIlluminous ElectricGeneral Wiring
08/01/2022CompleteIlluminous ElectricGeneral Wiring
1 project · most recent 08/11/2022
Sidewalk Shed
FiledStatusContractorScope
08/11/2022Signed-offPlatinum Services NYSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/19/2025Post-installed AnchorsGeorge Xerakiasspecial
41 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account