← Back
Primarily 2 family with 1 store or office
68-34 FRESH POND ROAD
QUEENS · BIN 4088005
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6BZoning
3,300 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Primarily 2 family with 1 store or office · Owner of record: 68-35 FRESH POND LLC · 2,787 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 315p · 3 filings · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar11p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
361 ST NICHOLAS1507/08/2026
60-56 70TH AVE404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/06/2022$1.9M—6835 FRESH POND LLC → 68-35 FRESH POND LLC$585/sf building
04/06/2022$1.9M—6835 FRESH POND LLC → 68-35 FRESH POND LLC$585/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC107/23/2025
HPL ENGINEERING P.C.506/03/2022
JIMENEZ BUILDING CONSULTING LLC803/21/2022
SD DESIGN STUDIO LLC107/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE1803/21/2026
JM CONSULTANT STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor507/08/2026
J Y ELECTRIC INCElectrical203/22/2026
CATMAN PLUMBING INCPlumbing207/08/2026
CASE PLUMBING LLCFire Protection107/08/2026
INDENT BUILDERS INCGeneral Contractor104/09/2026
ST SAFETY CONS. INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854107/23/2025
HPL ENGINEERING PC5613506/03/2022
M. INT'L ENGINEERING PLLC3129403/21/2022
JIMENEZ BUILDING CONSULTI7944302/28/2022
NY ACOM ENGINEERING PLLC7061112/20/2021
Building Lifecycle
All (100)Filed (15)Permit Issued (8)Signed Off (5)Violation (8)Inspection (10)Objection (24)Special Inspection (30)
03/17/2026
Signed off — Alteration
Installation of PV system on existing rooftop, no changes to egress or use of occupancy.
Q01245467-I1
09/04/2025
Permit issued — Solar
Q01245467-I1-SL
07/23/2025
Filed — Alteration
Installation of PV system on existing rooftop, no changes to egress or use of occupancy.
Q01245467-I1
06/23/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
06/23/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
06/23/2025
Special inspection requirement — Final
TOM PETERSEN
06/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/27/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
06/10/2022
Special inspection requirement — Maintenance information
Fran Huang
06/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
06/10/2022
Special inspection requirement — Masonry
Fran Huang
06/10/2022
Special inspection requirement — Air barrier - visual inspection
Fran Huang
06/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/10/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
06/10/2022
Special inspection requirement — Fenestration areas
Fran Huang
06/10/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
06/10/2022
Special inspection requirement — Interior lighting power
Fran Huang
06/03/2022
Filed — Alteration CO
RENOVATE CELLAR & 1ST FLOOR TO BE LAUNDROMAT ESTABLISHMENT. NEW PARTITION, & STRUCTURE WORK AS PER PLAN SUBMITTED. PLUMBING & SPRINKLER WORK TO BE FILED UNDER DOBNow APPLICATION # Q00574517. REQUEST NEW CERTIFICATE OF OCCUPANCY
Q00543943-P2
06/03/2022
Special inspection requirement — Interior lighting power
Fran Huang
06/03/2022
Special inspection requirement — Fenestration areas
Fran Huang
06/03/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
06/03/2022
Special inspection requirement — Air barrier - visual inspection
Fran Huang
06/03/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
06/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
06/03/2022
Special inspection requirement — Masonry
Fran Huang
06/03/2022
Special inspection requirement — Maintenance information
Fran Huang
06/03/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
06/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
05/24/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/03/2022
Objection raised — Zoning
05/03/2022
Objection resolved — Addressed
04/28/2022
Filed — Alteration CO
RENOVATE CELLAR & 1ST FLOOR TO BE LAUNDROMAT ESTABLISHMENT. NEW PARTITION, & STRUCTURE WORK AS PER PLAN SUBMITTED. PLUMBING & SPRINKLER WORK TO BE FILED UNDER DOBNow APPLICATION # Q00574517. REQUEST NEW CERTIFICATE OF OCCUPANCY
Q00543943-P1
04/26/2022
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD CONSTRUCTION FENCE WORK IN CONJUNCTION WITH D.O.B. ALT-I APPLICATION #:421797595. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
Q00369502-I1
04/20/2022
Signed off — Alteration
FILED PLUMBING & SPRINKLER WORK IN CONJUNCTION WITH CO APPLICATION #: Q00543943. INSTALL NEW PLUMBING AND SPRINKLER FIXTURES AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00574517-I1
03/25/2022
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU. 3RD FLOOR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00471550-I1
03/24/2022
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU 3RD FLOOR. PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00477453-I1
03/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
03/24/2022
Special inspection requirement — Maintenance information
NANIK MASSAND
03/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
03/24/2022
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
03/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
03/21/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU. 3RD FLOOR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00471550-P3
03/21/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU 3RD FLOOR. PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00477453-P4
03/14/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/11/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/08/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/28/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU. 3RD FLOOR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00471550-P2
01/20/2022
Permit issued — General Construction
Q00471550-I1-GC
01/14/2022
Filed — Alteration
FILED PLUMBING & SPRINKLER WORK IN CONJUNCTION WITH CO APPLICATION #: Q00543943. INSTALL NEW PLUMBING AND SPRINKLER FIXTURES AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00574517-P1
12/20/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU. 3RD FLOOR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00471550-P1
12/20/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU 3RD FLOOR. PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00477453-P3
12/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/21/2021
Permit issued — General Construction
Q00543943-I1-GC
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offINDENT BUILDERS INC09/04/2025
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC01/20/2022
DOB NOWGeneral ConstructionPermit IssuedST SAFETY CONS. INC09/21/2021
DOB NOWPlumbingSigned-offS & L PLUMBING INC09/14/2021
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC09/13/2021
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC03/04/2021
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC02/19/2021
DOB NOWConstruction FenceSigned-offWINWAY DEVELOPMENT LLC07/15/2020
BISPLISSUEDAUSTIN PLBG & HTG CO.INC03/18/2010
BISBLISSUEDAUSTIN PLBG & HTG CO.INC03/18/2010
BISPLISSUEDAMERICAN NATIONAL P & H I05/26/2009
3 projects · most recent 06/30/2025
General Wiring
FiledStatusContractorScope
06/30/2025CompleteAMBER ELECTL CONTNG INC—
07/18/2022CompleteJ Y ELECTRIC INCGeneral Wiring
04/06/2022CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/27/2022Fail-Final CND-Occupancy InspectionFailView ↗
07/27/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/24/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/14/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/08/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
06/23/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
06/23/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
06/23/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
06/23/2025Energy Code Compliance InspectionsTOM PETERSENprogress
06/23/2025FinalTOM PETERSENprogress
06/10/2022Air barrier - visual inspectionFran Huangenergy_progress
06/10/2022Maintenance informationFran Huangenergy_progress
06/10/2022Interior lighting powerFran Huangenergy_progress
06/10/2022Fenestration areasFran Huangenergy_progress
06/10/2022Fenestration and door U-factor and product ratingsFran Huangenergy_progress
06/10/2022Fenestration air leakageFran Huangenergy_progress
06/10/2022MasonryFran Huangspecial
06/10/2022Fire-Resistant Penetrations and JointsFran Huangspecial
06/10/2022Structural Stability – Alterations of existing buildingsFran Huangspecial
06/10/2022Energy Code Compliance InspectionsFran Huangprogress
06/03/2022Fire-Resistant Penetrations and JointsFran Huangspecial
06/03/2022Air barrier - visual inspectionFran Huangenergy_progress
06/03/2022Fenestration and door U-factor and product ratingsFran Huangenergy_progress
06/03/2022Maintenance informationFran Huangenergy_progress
06/03/2022Energy Code Compliance InspectionsFran Huangprogress
06/03/2022Structural Stability – Alterations of existing buildingsFran Huangspecial
06/03/2022MasonryFran Huangspecial
06/03/2022Interior lighting powerFran Huangenergy_progress
06/03/2022Fenestration air leakageFran Huangenergy_progress
06/03/2022Fenestration areasFran Huangenergy_progress
Latest 25 of 65.
▾Documents — 185 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch10
08/27/2026Q00574517-P1Request digital key ↗
08/27/2026Q00574517-I1Request digital key ↗
08/26/2026Q00477453-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
08/26/2026Q00471550-I1Request digital key ↗
08/26/2026Q00471550-P3Request digital key ↗
08/26/2026Q00471550-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00369502-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION17
04/20/2023410218937Open ↗
04/06/2023410218937Open ↗
08/26/2022410218937Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION5
03/18/2010410218937Open ↗
03/18/2010410218937Open ↗
10/22/2009410218937Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/25/2020421797595Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
12/30/2020421797595Open ↗
12/17/2020421797595Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/04/2020421797595Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/17/2020421797595Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/04/2020421797595Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/04/2020421797595Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/18/2019421797595Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00543943-I1Open ↗
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature38
09/23/2026Q00471550-I1Open ↗
09/23/2026Q00471550-I1Open ↗
09/23/2026Q00471550-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/28/2026Q00369502-I1Open ↗
08/26/2026Q00477453-P3Open ↗
08/26/2026Q00477453-P4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026Q00471550-I1Open ↗
09/19/2026Q00477453-I1Open ↗
09/02/2026Q00471550-P3Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/18/2019421797595Open ↗
02/05/2009410218937Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/05/2009410218937Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/05/2009410218937Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
01/15/2010410218937Open ↗
01/12/2010410218937Open ↗
02/05/2009410218937Open ↗
▸BISSCHEDULE B - PLUMBING1
02/05/2009410218937Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00543943-P2Open ↗
08/13/2026Q00543943-P1Open ↗
08/13/2026Q00543943-I1Open ↗
▸BISSTREET TREE CHECKLIST2
12/18/2019421797595Open ↗
02/05/2009410218937Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
12/17/2020421797595Open ↗
▸BISTenant Protection Plan and Notes1
12/18/2019421797595Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/26/2026Q00477453-P3Open ↗
08/26/2026Q00477453-I1Open ↗
08/26/2026Q00477453-P2Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/05/2009410218937Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/04/2020421797595Open ↗
▸Energy Compliance6
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026Q00477453-I1Open ↗
08/13/2026Q00543943-I1Open ↗
08/13/2026Q00471550-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/18/2019421797595Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
11/04/2020421797595Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/30/2020421797595Open ↗
11/04/2020421797595Open ↗
11/04/2020421797595Open ↗
Showing 3 of 4 on file for this type
▸BISSOIL REPORT1
11/04/2020421797595Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/04/2020421797595Open ↗
▸Approvals, Objections & Sign-offs19
▸BISLETTERS - SUPPORTING DOCUMENTATION13
04/27/2023410218937Open ↗
04/27/2023410218937Open ↗
04/06/2023410218937Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
10/14/2020421797595Open ↗
10/07/2020421797595Open ↗
09/17/2020421797595Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
01/27/2009410218937Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01245467-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/17/2020421797595Open ↗
12/18/2019421797595Open ↗
02/05/2009410218937Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
12/30/2020421797595Open ↗
12/17/2020421797595Open ↗
12/17/2020421797595Open ↗
▸BISEFILING COVER SHEET1
12/18/2019421797595Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
12/17/2020421797595Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
11/04/2020421797595Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00543943-I1Open ↗