DOB05/07/2025CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
DOB02/11/2025CYCLE 9B UNSAFE REPORT FILED
HPD12/03/2023§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE FOYER LOCATED AT APT A26, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
HPD12/03/2023§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 4th PRIVATE HALLWAY FROM EAST LOCATED AT APT A26, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
HPD12/03/2023§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT A26, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
HPD08/08/2023§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
HPD08/08/2023§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
DOB02/22/2023FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
DOB04/29/2021FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB07/31/2018FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
DOB08/30/2013FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
ECB05/23/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #911033. REMEDY: SUBMIT ACCEPTABLE REQUNothing owed — awaiting certificate of correction
ECB03/07/2020FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTE:ATTHE TIME OF INSPECTION FACADE OBSERVE DEFECTS SUCH AS.(1)EXPOSURE#1(FRONT EAST FACADE)CRACK/DETERIORATED/LOOSE MASONRY MORTAR AT MULTIPLE LONothing owed — awaiting certificate of correction