BROOKLYN
68 COMMERCIAL STREET
BROOKLYN · Greenpoint · BIN 3429860
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof108p · 3 filings · 20 docs
Floor 61p · 1 filing · 2 docs
Floor 5102p · 2 filings · 20 docs
Floor 4104p · 2 filings · 20 docs
Floor 3103p · 2 filings · 20 docs
Floor 2105p · 3 filings · 20 docs
Floor 1104p · 2 filings · 20 docs
Basement2p · 3 filings · 7 docs
Site & exterior60p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
68 COMMERCIAL STREET6107/08/2026
PARSONS CONSTRUCTION1607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/09/2021$1.6M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2603/21/2026
SANDEEP KAUR503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YELLOW HAT CONSTRUCTION IGeneral Contractor2107/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor707/08/2026
N TECH DESIGN OF AMERICAGeneral Contractor303/21/2026
PLATINUM PWR ELECTL CONTElectrical203/22/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.2541209/20/2024
Building Lifecycle
All (90)Filed (19)Permit Issued (19)Signed Off (8)Violation (7)Inspection (7)Special Inspection (30)
05/11/2026
Violation issued (HPD, closed)
A
06/16/2025
Violation issued (HPD, closed)
A
11/01/2024
Signed off — New Building
B00712301-S1
11/01/2024
Signed off — New Building
B00712301-S2
10/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/07/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/02/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/20/2024
Filed — New Building
B00712301-P7
09/17/2024
Permit issued — Plumbing
B00712301-S2-EW-SP
08/07/2024
Permit issued — Sprinklers
B00712301-S2-PL
07/30/2024
Signed off — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
B08003388-I1
07/30/2024
Signed off — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
B08003388-S2
07/15/2024
Special inspection requirement — Protection of exposed foundation insulation
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Lighting controls
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Interior lighting power
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Fenestration areas
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Metering
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Insulation placement and R values
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Exterior lighting power
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Air barrier - visual inspection
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
07/15/2024
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
07/12/2024
Filed — New Building
B00712301-P6
07/02/2024
Violation issued (ECB, closed)
Construction
06/03/2024
Signed off — Alteration
B00698941-I1
05/29/2024
Filed — New Building
B00712301-P5
05/24/2024
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
05/24/2024
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
05/24/2024
Special inspection requirement — Final
MAURICIO ANDRADE
05/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
05/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
05/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
05/24/2024
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
05/24/2024
Special inspection requirement — Duct leakage testing, insulation and design
MAURICIO ANDRADE
05/24/2024
Special inspection requirement — Shutoff dampers
MAURICIO ANDRADE
05/10/2024
Filed — New Building
B00712301-P4
05/03/2024
Violation issued (ECB, closed)
Construction
04/15/2024
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
04/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
04/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
04/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
04/15/2024
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
04/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/23/2024
Signed off — New Building
B00712301-S3
02/12/2024
Signed off — New Building
B00712301-S4
02/08/2024
Permit issued — Mechanical Systems
B00712301-S1-MS
01/09/2024
Signed off — New Building
B00712301-S5
12/19/2023
Permit issued — Construction Fence
B00698941-I1-FN
11/28/2023
Filed — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
B08003388-P3
11/16/2023
Permit issued — Sidewalk Shed
B08003388-I1-SH
11/16/2023
Violation issued (ECB, closed)
Construction
11/08/2023
Permit issued — Supported Scaffold
B08003388-S2-SF
11/07/2023
Filed — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
B08003388-S2
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA M B MECHANICAL INC09/17/2024
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN08/07/2024
DOB NOWMechanical SystemsSigned-offYELLOW HAT CONSTRUCTION I02/08/2024
DOB NOWConstruction FenceSigned-offYELLOW HAT CONSTRUCTION I12/19/2023
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC11/16/2023
DOB NOWSupported ScaffoldSigned-offPARSONS CONSTRUCTION INC11/08/2023
DOB NOWPlumbingSigned-offA M B MECHANICAL INC09/22/2023
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN07/14/2023
DOB NOWFoundationPermit IssuedYELLOW HAT CONSTRUCTION I06/21/2023
DOB NOWGeneral ConstructionPermit IssuedYELLOW HAT CONSTRUCTION I06/21/2023
DOB NOWStructuralSigned-offYELLOW HAT CONSTRUCTION I06/21/2023
DOB NOWStructuralSigned-offYELLOW HAT CONSTRUCTION I05/09/2023
DOB NOWFoundationPermit IssuedYELLOW HAT CONSTRUCTION I05/08/2023
DOB NOWMechanical SystemsSigned-offYELLOW HAT CONSTRUCTION I12/29/2022
DOB NOWSupport of ExcavationSigned-offYELLOW HAT CONSTRUCTION I12/29/2022
DOB NOWGeneral ConstructionPermit IssuedYELLOW HAT CONSTRUCTION I12/29/2022
DOB NOWConstruction FenceSigned-offYELLOW HAT CONSTRUCTION I12/15/2022
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC09/21/2022
DOB NOWConstruction FenceSigned-offN TECH DESIGN OF AMERICA08/31/2022
4 projects · most recent 01/31/2025
General Wiring
FiledStatusContractorScope
01/31/2025CompletePLATINUM PWR ELECTL CONTGeneral Wiring
06/04/2024CompleteTUXEDO ELEC'L CONTR'G INC—
04/17/2023CompleteTRUE POWER ELECL CONT LLC—
11/04/2022CompleteBDS ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/08/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
07/15/2024Insulation placement and R valuesMAURICIO ANDRADEenergy_progress
07/15/2024Fenestration areasMAURICIO ANDRADEenergy_progress
07/15/2024Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
07/15/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
07/15/2024Maintenance informationMAURICIO ANDRADEenergy_progress
07/15/2024Air barrier - visual inspectionMAURICIO ANDRADEenergy_progress
07/15/2024Fenestration and door U-factor and product ratingsMAURICIO ANDRADEenergy_progress
07/15/2024Interior lighting powerMAURICIO ANDRADEenergy_progress
07/15/2024Lighting controlsMAURICIO ANDRADEenergy_progress
07/15/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
07/15/2024MeteringMAURICIO ANDRADEenergy_progress
07/15/2024Protection of exposed foundation insulationMAURICIO ANDRADEenergy_progress
07/15/2024Fenestration air leakageMAURICIO ANDRADEenergy_progress
07/15/2024Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
07/15/2024Exterior lighting powerMAURICIO ANDRADEenergy_progress
05/24/2024Shutoff dampersMAURICIO ANDRADEenergy_progress
05/24/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/24/2024Mechanical SystemsMAURICIO ANDRADEspecial
05/24/2024Post-installed AnchorsMAURICIO ANDRADEspecial
05/24/2024HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
05/24/2024Maintenance informationMAURICIO ANDRADEenergy_progress
05/24/2024HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
05/24/2024Duct leakage testing, insulation and designMAURICIO ANDRADEenergy_progress
05/24/2024HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
05/24/2024FinalMAURICIO ANDRADEprogress
Latest 25 of 67.
▾Documents — 129 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/30/2026B00698941-I1Request digital key ↗
08/28/2026B00712301-S3Request digital key ↗
08/28/2026B00712301-S2Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
07/24/2024322117516Open ↗
06/28/2024310183182Open ↗
05/23/2022340855015Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/23/2022340855015Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00712301-P6Open ↗
08/13/2026B00712301-P3Open ↗
08/13/2026B00712301-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00712301-P3Open ↗
08/13/2026B00712301-I1Open ↗
08/13/2026B00712301-P6Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/01/2024322117516Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00712301-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/30/2026B00698941-I1Open ↗
08/28/2026B00712301-S2Open ↗
08/28/2026B00712301-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026B00712301-S4Open ↗
09/02/2026B00712301-S4Open ↗
09/02/2026B00712301-S4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026B00712301-S4Open ↗
09/02/2026B00712301-S4Open ↗
09/01/2026B00712301-P5Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/23/2022340855015Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/23/2022340855015Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00712301-P3Open ↗
08/13/2026B00712301-P6Open ↗
08/13/2026B00712301-I1Open ↗
▸Safety & Tenant Protection13
▸DOB NOWHPD-1: Anti-Harassment Area Checklist4
08/13/2026B00712301-P7Open ↗
08/13/2026B00712301-I1Open ↗
08/13/2026B00712301-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist3
08/28/2026B00712301-I1Open ↗
08/28/2026B00712301-P3Open ↗
08/13/2026B00712301-P6Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/23/2022340855015Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/23/2022340855015Open ↗
▸BISSTREET TREE CHECKLIST1
05/23/2022340855015Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00712301-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00712301-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00712301-I1Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/13/2008310183182Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00712301-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026B00712301-S5Open ↗
08/13/2026B00712301-S4Open ↗
08/13/2026B00712301-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00712301-S4Open ↗
08/13/2026B00712301-S5Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00712301-S4Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B00712301-S4Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/28/2024340855015Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/13/2008310183182Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
07/24/2024322117516Open ↗
08/13/2008310183182Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/23/2022340855015Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/23/2022340855015Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial3
08/13/2026B00712301-P6Open ↗
08/13/2026B00712301-I1Open ↗
08/13/2026B00712301-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00712301-P6Open ↗
08/13/2026B00712301-P3Open ↗
08/13/2026B00712301-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/28/2026B00712301-I1Open ↗
08/28/2026B00712301-P3Open ↗
08/13/2026B00712301-P6Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
08/13/2026B00712301-P7Open ↗
08/13/2026B00712301-S2Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
08/13/2026B00712301-P7Open ↗
08/13/2026B00712301-S2Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
08/01/2024322117516Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/24/2024322117516Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/01/2024322117516Open ↗
▸BISUnknown1
07/24/2024322117516Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/23/2022340855015Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00712301-S5Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00712301-I1Open ↗