← Back
Four families
68 EAST 52 STREET
BROOKLYN · East Flatbush-Rugby · BIN 3099676
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R6Zoning
3,652 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Four families · 3,000 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHARLES RUTENBERG REALTY INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.111/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.R.P PLUMBING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781111/03/2020
Building Lifecycle
All (17)Filed (1)Permit Issued (1)Signed Off (1)Violation (8)Special Inspection (6)
06/09/2025
Violation issued (HPD, closed)
A
04/09/2024
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (HPD, closed)
A
03/16/2021
Signed off — Alteration
EXISTING OIL TO GAS CONVERSION OF 1-EXISTING BOILERS, IN THE CELLAR, REMOVE AND CAP 2-OIL TANKS IN THE GARAGE UNDER BIN# 3421007. INSTALL 1-NEW GAS BOILER AND GAS DRYER IN CELLAR. INSTALLATION OF PLUMBING FIXTURES (WASHER, TOILET, LAVATORY & SLOP SINK)
B00422620-I1
11/05/2020
Permit issued — Plumbing
B00422620-I1-PL
11/03/2020
Filed — Alteration
EXISTING OIL TO GAS CONVERSION OF 1-EXISTING BOILERS, IN THE CELLAR, REMOVE AND CAP 2-OIL TANKS IN THE GARAGE UNDER BIN# 3421007. INSTALL 1-NEW GAS BOILER AND GAS DRYER IN CELLAR. INSTALLATION OF PLUMBING FIXTURES (WASHER, TOILET, LAVATORY & SLOP SINK)
B00422620-I1
11/02/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/02/2020
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/02/2020
Special inspection requirement — HVAC and service water heating equipment
CHRISTIAN LOZADA
11/02/2020
Special inspection requirement — HVAC and service water heating system controls
CHRISTIAN LOZADA
11/02/2020
Special inspection requirement — HVAC insulation and sealing
CHRISTIAN LOZADA
11/02/2020
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/07/2016
Violation issued (HPD, closed)
I
09/17/2013
Violation issued (HPD, open)
B
04/22/2004
Violation issued (ECB, closed)
Construction
04/22/2004
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offC.R.P PLUMBING & HTG INC11/05/2020
BISOTISSUEDC.R.P PLUMBING & HTG INC11/09/2020
BISPLISSUEDHTS PLBG&HTG INC10/08/2004
BISOTISSUEDN/A10/04/2004
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/02/2020Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/02/2020Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/02/2020HVAC and service water heating equipment CHRISTIAN LOZADAenergy_progress
11/02/2020HVAC and service water heating system controls CHRISTIAN LOZADAenergy_progress
11/02/2020HVAC insulation and sealing CHRISTIAN LOZADAenergy_progress
11/02/2020Maintenance informationCHRISTIAN LOZADAenergy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00422620-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
03/16/2021322005833Open ↗
11/03/2020340782567Open ↗
11/12/2019322005833Open ↗
▸BISWORK PERMIT APPLICATION1
11/09/2020340782567Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B00422620-I1Open ↗
08/28/2026B00422620-I1Open ↗
08/28/2026B00422620-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/03/2020340782567Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/03/2020340782567Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/03/2020340782567Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/19/2020322005833Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/02/2026B00422620-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00422620-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/12/2019322005833Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES2
11/03/2020340782567Open ↗
11/12/2019322005833Open ↗
▸BISSTREET TREE CHECKLIST1
11/12/2019322005833Open ↗
▸DOB NOWTenant Protection Plan1
09/02/2026B00422620-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/03/2020340782567Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026B00422620-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/16/2021340782567Open ↗
11/09/2020340782567Open ↗
11/03/2020340782567Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/19/2020322005833Open ↗
11/12/2019322005833Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/16/2021340782567Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/03/2020340782567Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/16/2021340782567Open ↗
11/09/2020340782567Open ↗
11/03/2020340782567Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/16/2021340782567Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/16/2021340782567Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/16/2021340782567Open ↗
11/03/2020340782567Open ↗
11/12/2019322005833Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
11/12/2019322005833Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/03/2020340782567Open ↗