← Back
Elevator cooperative
68 EAST 86 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1046836
💬 Discuss this project
1912Year Built
12Stories
D4Building Class
R10Zoning
53,220 sfGross Floor Area
27Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 68 EAST 86THST OWNERS CORP · 6,521 sf lot · 8.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof15p · 1 filing · 10 docs
Penthouse25p · 3 filings · 20 docs
Floor 1224p · 3 filings · 20 docs
Floor 114p · 1 filing · 3 docs
Floor 10
Floor 917p · 2 filings · 20 docs
Floor 811p · 2 filings · 11 docs
Floor 7
Floor 6
Floor 5
Floor 424p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 14p · 1 filing · 2 docs
Cellar24p · 2 filings · 20 docs
Site & exterior12p · 3 filings · 6 docs
Filed — no permit issued9p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
68 E 86TH STREET OWNERS3503/21/2026
68 EAST 86TH STREET OWNERS3403/21/2026
RELIABLE ENTERPRISES1307/08/2026
PHOENIX SUTTON STR INC503/22/2026
EQUITY MANAGEMENT303/21/2026
ORSID REALTY CORP203/21/2026
68 E 86TH STREET203/21/2026
68 EAST 86THST OWNERS CORP103/22/2026
JAS160N3103/22/2026
68 EAST 86 STREET OWNERS COPR103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MESZAROS ENGINEERING PLLC1203/21/2026
RESOLUTION EXPEDITING1203/21/2026
CONVERSANO ASSOCIATES, INC.1003/21/2026
AE DESIGN SOLUTION203/21/2026
GREEN LIGHT EXPEDITING LLC603/21/2026
MAR DESIGN SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TC BROWNE & CO., LLCGeneral Contractor1407/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor1107/08/2026
ADRIATIC PLUMBING & HEATINGGeneral Contractor203/21/2026
FINE FORM INCGeneral Contractor207/08/2026
LEGACY PLUMBING & HTG LLCPlumbing207/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor203/21/2026
PHOENIX SUTTON STR INCGeneral Contractor203/21/2026
ADVANCE TEAM CONSULTANT *General Contractor207/08/2026
VOLTRON ELECTRIC LLCElectrical103/22/2026
ABILENE INCGeneral Contractor104/09/2026
DAVID CONSTRUCTING NY, INGeneral Contractor107/08/2026
T.R. FOX CONTRACTING INCGeneral Contractor107/08/2026
A PLUS PLUMBING CORPPlumbing107/08/2026
CITY/SUBURBAN PLBG CORPPlumbing107/08/2026
AN-K ELECTRIC LLCElectrical103/22/2026
NY CITY PLUMBER CORPPlumbing107/08/2026
ANTHONY LOGOZZOElectrical103/21/2026
BERMAN BRYANElectrical103/21/2026
BRYAN BERMANElectrical103/21/2026
CREGGAN ELECTRIAL CORPElectrical103/22/2026
DALIP ZEKIROSKIElectrical103/21/2026
JEFFREY SOLOMONElectrical103/21/2026
MARIO CASTROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MESZAROS ENGINEERING PLLC963804/16/2026
MAR CODE INC.7000109/10/2025
KAY LEONG AKERLOF ARCHITE1594207/08/2025
ALAN MARGOLIN & ASSOC423504/04/2025
SD TESTING & INSPECTION S7010202/13/2024
CES ENGINEERING LLC1277206/07/2023
MW PROFESSIONAL ENGINEERI570102/04/2023
Building Lifecycle
All (209)Filed (33)Permit Issued (27)Signed Off (17)Facade (FISP) (13)Violation (60)Inspection (15)Objection (14)Special Inspection (30)
07/09/2026
Signed off — Alteration
M01089422-I1
05/29/2026
Signed off — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-S2
04/23/2026
Signed off — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-S1
04/23/2026
Signed off — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-I1
04/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
04/17/2026
Special inspection requirement — Final
Christian Meszaros
04/17/2026
Special inspection requirement — Post-installed Anchors
Christian Meszaros
04/17/2026
Special inspection requirement — Chimneys and vents
Christian Meszaros
04/17/2026
Special inspection requirement — Preliminary
Christian Meszaros
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christian Meszaros
04/16/2026
Filed — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-P3
04/15/2026
Filed — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-P4
04/13/2026
Special inspection requirement — Post-installed Anchors
Christian Meszaros
04/13/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
04/13/2026
Special inspection requirement — Final
Christian Meszaros
04/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christian Meszaros
04/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
04/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Christian Meszaros
04/13/2026
Special inspection requirement — Preliminary
Christian Meszaros
04/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
04/13/2026
Special inspection requirement — Chimneys and vents
Christian Meszaros
04/13/2026
Special inspection requirement — Maintenance information
Christian Meszaros
04/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
01/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/06/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/24/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
09/12/2025
Objection raised — Admin
09/10/2025
Filed — Alteration
CD5 FOR NEW 1 MAN CAGE TO ALLOW INSULATION OF EXISTING METAL CHIMNEY, NO CHANGE IN USE OCCUPANCY OR EGRESS
M01283203-I1
09/07/2025
Special inspection requirement — Post-installed Anchors
OMAR ELSHERIF
09/05/2025
Special inspection requirement — Permanent certificate
Christian Meszaros
09/05/2025
Special inspection requirement — Maintenance information
Christian Meszaros
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
09/05/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christian Meszaros
09/05/2025
Special inspection requirement — Heating Systems
Christian Meszaros
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
09/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
09/04/2025
Filed — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-P2
09/04/2025
Filed — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-P1
08/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
08/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
08/12/2025
Signed off — Alteration
M00940334-I1
08/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00944210-I1
07/10/2025
Objection raised — Scope
07/08/2025
Filed — Alteration
Mechanical work filed in conjunction with the renovation of an existing apartment. Architectural and plumbing work filed under separate application. No change of use, occupancy or egress.
M00609329-P1
06/06/2025
Signed off — Alteration
Filing herewith for the installation of mechanical systems
M00941538-S2
05/23/2025
Signed off — Alteration
Filing herewith for the installation of mechanical systems
M00941538-I1
05/23/2025
Signed off — Alteration
Filing herewith for the installation of mechanical systems
M00941538-S1
05/23/2025
Permit issued — Plumbing
M01215725-S1-PL
05/23/2025
Permit issued — Boiler Equipment
M01215725-S2-BE
05/22/2025
Permit issued — General Construction
M01215725-I1-GC
05/09/2025
Filed — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-S2
05/09/2025
Filed — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-S1
05/09/2025
Filed — Alteration
INSTALLATION OF NEW BOILER WITH A TANK-LESS COIL AND BURNER. NO CHANGE IN EGRESS OR OCCUPANCY.
M01215725-I1
04/04/2025
Filed — Alteration
Filing herewith for the installation of mechanical systems
M00941538-P2
Latest 60 of 209 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP05/23/2025
DOB NOWBoiler EquipmentSigned-offABILENE, INC05/23/2025
DOB NOWGeneral ConstructionSigned-offABILENE INC05/22/2025
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC10/29/2024
DOB NOWGeneral ConstructionSigned-offADRIATIC PLUMBING HEATI08/23/2024
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP06/12/2024
DOB NOWMechanical SystemsSigned-offFINE FORM05/22/2024
DOB NOWGeneral ConstructionSigned-offFINE FORM05/21/2024
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL04/29/2024
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC04/22/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC11/28/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC11/28/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC10/10/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC09/29/2023
DOB NOWMechanical SystemsSigned-offADVANCE TEAM CONSULTANT *06/28/2023
DOB NOWMechanical SystemsPermit IssuedTC BROWNE & CO., LLC06/13/2023
DOB NOWGeneral ConstructionPermit IssuedTC BROWNE & CO., LLC06/13/2023
DOB NOWGeneral ConstructionSigned-offADVANCE TEAM CONSULTANT *05/24/2023
DOB NOWPlumbingSigned-offCITY/SUBURBAN PLBG CORP04/26/2023
DOB NOWGeneral ConstructionSigned-offT.R. FOX CONTRACTING INC04/14/2023
DOB NOWPlumbingSigned-offLEGACY PLUMBING & HEATING03/20/2023
DOB NOWGeneral ConstructionSigned-offDAVID CONSTRUCTING NY, IN02/08/2023
DOB NOWMechanical SystemsPermit IssuedTC BROWNE & CO., LLC01/10/2023
DOB NOWGeneral ConstructionPermit IssuedTC BROWNE & CO., LLC01/09/2023
DOB NOWPlumbingSigned-offLEGACY PLUMBING & HEATING02/04/2022
DOB NOWGeneral ConstructionPermit IssuedTC BROWNE & CO., LLC02/02/2022
DOB NOWMechanical SystemsPermit IssuedTC BROWNE & CO., LLC02/01/2022
BISPLISSUEDGOLDS PLUMBING CORP05/10/2018
BISOTISSUEDNOVA CONSTRUCTION SERVICE04/13/2018
BISOTISSUEDNOVA RESTORATION LLC02/08/2018
BISOTISSUEDNOVA RESTORATION LLC11/28/2017
BISEQISSUEDNOVA RESTORATION LLC09/28/2017
BISMHISSUEDALL MAKES HTG & A/C CORP06/15/2017
BISMHISSUEDMC TEAM CONSTRUCTION INC06/06/2017
BISOTISSUEDMC TEAM CONSTRUCTION INC05/25/2017
BISMHISSUEDALL MAKES HTG & A/C CORP05/22/2017
BISPLISSUEDGOLDS PLUMBING CORP05/04/2017
BISOTISSUEDJ & J JOHNSON GENERAL CON05/02/2017
BISPLISSUEDQMB PLUMBING & HEATING INC12/09/2016
BISOTISSUEDMC TEAM CONSTRUCTION INC12/02/2016
+ 37 more permits on file
1 project · most recent 07/08/2025
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2025Permit IssuedTC BROWNE & CO., LLCAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Mitsubishi Electric PUMY-HP48NKMU1 48,000 BTU · Vrf Outdoor ×4
pefy-p15nmau-e3 15,000 BTU · Vrf Indoor ×2
pefy-p18nmau-e3 18,000 BTU · Vrf Indoor ×2
pefy-p24nmau-e3 24,000 BTU · Vrf Indoor ×2
pefy-p48nmau-e3 48,000 BTU · Vrf Indoor ×2
Ventilation
Loren Cook GC-128 50 CFM · Exhaust Fan ×2
2 projects · most recent 04/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/16/2026Signed-offNY CITY PLUMBER CORPGas, Water/Sanitary
03/03/2023Signed-offLEGACY PLUMBING & HEATINGGas, Water/Sanitary
9 projects · most recent 07/01/2025
General Wiring Boiler Controls
FiledStatusContractorScope
07/01/2025CompleteABILENE ELECTRIC INCBoiler Controls
06/19/2025Permit IssuedLION ELECTRIC INCGeneral Wiring
11/06/2024CompleteCREGGAN ELECTRIAL CORPGeneral Wiring
04/23/2024Permit IssuedOPTIMAL ELECTRIC, INC—
04/11/2024Permit IssuedCOACHMEN SOLUTIONS CORP—
11/01/2023CompleteAN-K ELECTRIC LLCGeneral Wiring
09/27/2023Permit IssuedRICHARD NEU—
06/13/2023CompleteVOLTRON ELECTRIC LLCGeneral Wiring
04/14/2023CompleteETECH ELECTRICAL LLCGeneral Wiring
1 project · most recent 09/10/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/10/2025——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
01/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2025Pass-Final Boiler Equipment InspectionPassView ↗
02/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/05/2022Certified Water Pressure - WP - PL - Underground TestCertifiedView ↗
08/03/2022Certified Water Pressure - WP - PL - Underground TestCertifiedView ↗
08/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
04/17/2026Post-installed AnchorsChristian Meszarosspecial
04/17/2026FinalChristian Meszarosprogress
04/17/2026PreliminaryChristian Meszarosprogress
04/17/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
04/17/2026Chimneys and ventsChristian Meszarosspecial
04/17/2026Fire-Resistant Penetrations and JointsChristian Meszarosspecial
04/13/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
04/13/2026Post-installed AnchorsChristian Meszarosspecial
04/13/2026Fire-Resistant Penetrations and JointsChristian Meszarosspecial
04/13/2026Chimneys and ventsChristian Meszarosspecial
04/13/2026Maintenance informationChristian Meszarosenergy_progress
04/13/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
04/13/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
04/13/2026Energy Code Compliance InspectionsChristian Meszarosprogress
04/13/2026Permanent certificateChristian Meszarosenergy_progress
04/13/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
04/13/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
04/13/2026PreliminaryChristian Meszarosprogress
04/13/2026FinalChristian Meszarosprogress
09/07/2025Post-installed AnchorsOMAR ELSHERIFspecial
09/05/2025Maintenance informationChristian Meszarosenergy_progress
09/05/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
09/05/2025Heating SystemsChristian Meszarosspecial
09/05/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsChristian Meszarosspecial
09/05/2025HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
Latest 25 of 99.
▾Documents — 356 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch33
08/31/2026M00820802-I1Request digital key ↗
08/31/2026M00821607-I1Request digital key ↗
08/31/2026M00821975-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸Applications & Permits44
▸BISWORK PERMIT APPLICATION28
05/22/2018123117947Open ↗
11/29/2017123117947Open ↗
09/27/2017140696815Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
09/27/2017140696815Open ↗
09/01/2017123117947Open ↗
06/19/2017122781604Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications125
▸DOB NOWProgress Inspector Seal & Signature37
09/23/2026M01215725-P4Open ↗
09/01/2026M01215725-P3Open ↗
09/01/2026M00941538-P2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/31/2026M00820802-I1Open ↗
08/31/2026M00821607-I1Open ↗
08/31/2026M00609328-P1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
11/14/2018123117947Open ↗
10/23/2018140696815Open ↗
06/26/2018123011258Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026M01215725-P3Open ↗
09/01/2026M01215725-P3Open ↗
09/01/2026M00941538-P2Open ↗
Showing 3 of 19 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/27/2017140696815Open ↗
01/27/2014140154393Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/27/2017140696815Open ↗
01/27/2014140154393Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/27/2017140696815Open ↗
01/27/2014140154393Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/16/2012121010164Open ↗
11/12/2009120203378Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment21
▸BISSELF-CERT PLUMBING NOTICE7
07/06/2015121769639Open ↗
06/04/2015121769639Open ↗
10/17/2014121769639Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/19/2017122781604Open ↗
02/02/2017123011258Open ↗
11/01/2016122781604Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING4
01/27/2014140154393Open ↗
10/18/2013121769639Open ↗
03/16/2012121010164Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/03/2014140154393Open ↗
03/16/2012121010164Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
04/24/2014121010164Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
09/01/2017123117947Open ↗
02/02/2017123011258Open ↗
11/01/2016122781604Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/08/2017122781604Open ↗
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
08/31/2026M00820802-I1Open ↗
08/31/2026M00821607-I1Open ↗
08/31/2026M00609328-P1Open ↗
Showing 3 of 28 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
11/29/2017123117947Open ↗
02/02/2017123011258Open ↗
11/01/2016122781604Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/16/2012121010164Open ↗
07/20/2011120737140Open ↗
04/20/2010120324764Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/12/2009120203378Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
11/14/2018123117947Open ↗
06/26/2018123011258Open ↗
06/20/2018122781604Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
11/14/2018123117947Open ↗
06/26/2018123011258Open ↗
06/20/2018122781604Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
03/16/2012121010164Open ↗
03/16/2012121010164Open ↗
07/20/2011120737140Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/27/2017140696815Open ↗
▸BISAS-BUILT ENERGY ANALYSISARA Supporting Document1
07/02/2018123011258Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/27/2014140154393Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/27/2014140154393Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/18/2011120737140Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00941538-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00609225-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/27/2017140696815Open ↗
01/27/2014140154393Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
11/14/2018123117947Open ↗
10/23/2018140696815Open ↗
06/26/2018123011258Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/16/2012121010164Open ↗
07/20/2011120737140Open ↗
04/20/2010120324764Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/22/2018123117947Open ↗
06/20/2014121010164Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
11/14/2018123117947Open ↗
06/26/2018123011258Open ↗
06/20/2018122781604Open ↗
Showing 3 of 15 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
01/11/2016122495175Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET10
09/01/2017123117947Open ↗
02/02/2017123011258Open ↗
11/01/2016122781604Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION8
06/13/2018123011258Open ↗
01/18/2018122781604Open ↗
07/26/2017123011258Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
11/14/2018123117947Open ↗
10/23/2018140696815Open ↗
06/26/2018123011258Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/27/2017140696815Open ↗
01/27/2014140154393Open ↗
06/10/2010120324764Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/29/2017123117947Open ↗
▸DOB NOWCalculations1
08/13/2026M01283203-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01283203-I1Open ↗