← Back
Three families
68 ECKFORD STREET
BROOKLYN · BIN 3067545
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
3,852 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 68 ECKFORD STREET LLC · 1,650 sf lot · 2.33 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Roof2p · 1 filing · 13 docs
Floor 33p · 1 filing · 13 docs
Floor 23p · 2 filings · 20 docs
Floor 1
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLANK PROPERTY GROUP1107/08/2026
68 ECKFORD STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/04/2019$1.6M—Private party → 68 ECKFORD STREET LLC$428/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES DIEHL ARCHITECT LLC607/13/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing807/08/2026
IR CONTRACTING INCGeneral Contractor207/08/2026
ZONE PLUMBING HEATING CGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252411/03/2022
Building Lifecycle
All (51)Filed (6)Permit Issued (2)Signed Off (2)Violation (12)Inspection (5)Special Inspection (24)
08/01/2023
Signed off — Alteration
INSTALLATION OF NEW HEATING VENTILATION AND AIR CONDITIONING EQUIPMENT FILED IN CONJUNCTION WITH ALTERATION 322019604.
B00289683-I1
07/24/2023
Special inspection requirement — HVAC insulation and sealing
INDARDEO PARBHUNATH
07/24/2023
Special inspection requirement — HVAC and service water heating system controls
INDARDEO PARBHUNATH
07/24/2023
Special inspection requirement — HVAC and service water heating equipment
INDARDEO PARBHUNATH
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
07/24/2023
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
07/24/2023
Special inspection requirement — Final
NAVEEN KUMAR
07/13/2023
Filed — Alteration
INSTALLATION OF NEW HEATING VENTILATION AND AIR CONDITIONING EQUIPMENT FILED IN CONJUNCTION WITH ALTERATION 322019604.
B00289683-P3
07/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
07/12/2023
Special inspection requirement — HVAC and service water heating equipment
INDARDEO PARBHUNATH
07/12/2023
Special inspection requirement — HVAC and service water heating system controls
INDARDEO PARBHUNATH
07/12/2023
Special inspection requirement — HVAC insulation and sealing
INDARDEO PARBHUNATH
07/12/2023
Special inspection requirement — Final
NAVEEN KUMAR
07/12/2023
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
06/23/2023
Signed off — Alteration
REMOVAL OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH ALTERATION 322019604.
B00289656-I1
03/22/2023
Violation issued (HPD, closed)
A
12/16/2022
Special inspection requirement — HVAC and service water heating equipment
INDARDEO PARBHUNATH
12/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/16/2022
Special inspection requirement — HVAC and service water heating system controls
INDARDEO PARBHUNATH
11/10/2022
Violation issued (HPD, closed)
I
11/03/2022
Filed — Alteration
REMOVAL OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH ALTERATION 322019604.
B00289656-P2
11/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
11/01/2022
Special inspection requirement — HVAC and service water heating equipment
INDARDEO PARBHUNATH
11/01/2022
Special inspection requirement — HVAC and service water heating system controls
INDARDEO PARBHUNATH
08/17/2022
Permit issued — Mechanical Systems
B00289683-I1-MS
06/07/2022
Filed — Alteration
REMOVAL OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH ALTERATION 322019604.
B00289656-P1
06/07/2022
Filed — Alteration
INSTALLATION OF NEW HEATING VENTILATION AND AIR CONDITIONING EQUIPMENT FILED IN CONJUNCTION WITH ALTERATION 322019604.
B00289683-P1
05/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
05/26/2022
Special inspection requirement — HVAC insulation and sealing
INDARDEO PARBHUNATH
05/26/2022
Special inspection requirement — HVAC and service water heating system controls
INDARDEO PARBHUNATH
05/26/2022
Special inspection requirement — HVAC and service water heating equipment
INDARDEO PARBHUNATH
05/26/2022
Special inspection requirement — Final
05/26/2022
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
I
12/29/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/29/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/24/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/17/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/15/2021
Permit issued — Plumbing
B00289656-I1-PL
04/08/2021
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
A
03/23/2020
Filed — Alteration
INSTALLATION OF NEW HEATING VENTILATION AND AIR CONDITIONING EQUIPMENT FILED IN CONJUNCTION WITH ALTERATION 322019604.
B00289683-I1
03/23/2020
Filed — Alteration
REMOVAL OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH ALTERATION 322019604.
B00289656-I1
10/30/2019
Violation issued (HPD, closed)
I
10/17/2018
Violation issued (HPD, closed)
I
11/22/2017
Violation issued (HPD, closed)
I
11/07/2016
Violation issued (HPD, closed)
I
10/08/2015
Violation issued (HPD, closed)
I
02/20/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offIR CONTRACTING INC08/17/2022
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C11/15/2021
BISOTISSUEDIR CONTRACTING INC02/07/2022
BISOTISSUEDIR CONTRACTING INC10/15/2021
1 project · most recent 11/19/2021
General Wiring
FiledStatusContractorScope
11/19/2021Permit IssuedT.M.T ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/29/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/29/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/24/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/17/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/24/2023HVAC insulation and sealing INDARDEO PARBHUNATHenergy_progress
07/24/2023HVAC and service water heating system controls INDARDEO PARBHUNATHenergy_progress
07/24/2023HVAC and service water heating equipment INDARDEO PARBHUNATHenergy_progress
07/24/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
07/24/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
07/24/2023FinalNAVEEN KUMARprogress
07/12/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
07/12/2023HVAC and service water heating equipment INDARDEO PARBHUNATHenergy_progress
07/12/2023HVAC and service water heating system controls INDARDEO PARBHUNATHenergy_progress
07/12/2023HVAC insulation and sealing INDARDEO PARBHUNATHenergy_progress
07/12/2023FinalNAVEEN KUMARprogress
07/12/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
12/16/2022HVAC and service water heating equipment INDARDEO PARBHUNATHenergy_progress
12/16/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
12/16/2022HVAC and service water heating system controls INDARDEO PARBHUNATHenergy_progress
11/01/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
11/01/2022HVAC and service water heating equipment INDARDEO PARBHUNATHenergy_progress
11/01/2022HVAC and service water heating system controls INDARDEO PARBHUNATHenergy_progress
05/26/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
05/26/2022HVAC insulation and sealing INDARDEO PARBHUNATHenergy_progress
05/26/2022HVAC and service water heating system controls INDARDEO PARBHUNATHenergy_progress
05/26/2022HVAC and service water heating equipment INDARDEO PARBHUNATHenergy_progress
05/26/2022Final—progress
05/26/2022Mechanical SystemsINDARDEO PARBHUNATHspecial
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00289656-I1Request digital key ↗
09/02/2026B00289656-P1Request digital key ↗
08/15/2026B00289656-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00289683-I1Request digital key ↗
09/02/2026B00289683-P3Request digital key ↗
09/02/2026B00289683-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
08/31/2022322019604Open ↗
05/27/2022322019604Open ↗
12/20/2019322019604Open ↗
▸BISWORK PERMIT APPLICATION1
10/15/2021322019604Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/07/2021322019604Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00289656-P2Open ↗
09/23/2026B00289656-P2Open ↗
09/03/2026B00289656-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026B00289683-P3Open ↗
08/13/2026B00289656-P2Open ↗
08/13/2026B00289683-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00289656-P2Open ↗
09/03/2026B00289656-I1Open ↗
08/31/2026B00289683-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/20/2019322019604Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE PERMITS1
11/10/2023322019604Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/10/2023322019604Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/10/2023322019604Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/10/2023322019604Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/06/2023322019604Open ↗
▸BISHEATING SYSTEMS1
11/10/2023322019604Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00289683-I1Open ↗
08/13/2026B00289656-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/23/2023322019604Open ↗
09/29/2021322019604Open ↗
▸BISFENESTRATION AIR LEAKAGE1
11/10/2023322019604Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/10/2023322019604Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/10/2023322019604Open ↗
▸BISFENESTRATION AREAS1
11/10/2023322019604Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/10/2023322019604Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/10/2023322019604Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/23/2023322019604Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/20/2019322019604Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
11/10/2023322019604Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/23/2023322019604Open ↗
09/29/2021322019604Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
11/10/2023322019604Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/10/2023322019604Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/10/2023322019604Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/10/2023322019604Open ↗
▸BISMECHANICAL SYSTEMS1
11/10/2023322019604Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
02/07/2021322019604Open ↗
12/20/2019322019604Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/10/2023322019604Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/20/2019322019604Open ↗
▸Other Documents3
▸BISCHIMNEYS AND VENTS1
11/10/2023322019604Open ↗
▸BISMAINTENANCE INFORMATION1
11/10/2023322019604Open ↗
▸BISPERMANENT CERTIFICATE1
11/10/2023322019604Open ↗