← Back
BuildNYC
Two stories - detached, small or mid-size
68 ENFIELD PLACE
STATEN ISLAND · BIN 5166374
💬 Discuss this project
2022Year Built
2Stories
A1Building Class
R2Zoning
2,494 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,998 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofE - Family Dwelling1p · 1 filing · 20 docs
Floor 2E - Family Dwelling18p · 1 filing · 20 docs
Floor 1E - Family Dwelling24p · 1 filing · 20 docs
BasementE - Family Dwelling17p · 1 filing · 20 docs
Site & exterior2p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect610/21/2024
A Tech Engineering NYC103/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Fatima Falconetti Expeditor603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Master Built HomesGeneral Contractor1007/08/2026
Master Built Homesspecialty_contractor303/21/2026
JB Buzco PlumbingPlumbing207/08/2026
B & R Electrical ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677410/21/2024
Building Lifecycle
03/10/2025
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
S00565335-I1-GC-CX
10/24/2024
Signed off — New Building
PROPOSED DETACHED ONE FAMILY DWELLING WITH BUILT-IN ONE CAR GARAGE AND ACCESSORY OFF STREET PARKING FOR ONE CAR.
S00565335-S1
10/23/2024
Objection raised — Q-1
10/23/2024
Objection resolved — Addressed
10/23/2024
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMaster Built Homes07/17/2024
DOB NOWStructuralPermit IssuedMaster Built Homes04/26/2024
DOB NOWFoundationSigned-offMaster Built Homes07/25/2023
DOB NOWPlumbingSigned-offJB Buzco Plumbing06/01/2023
DOB NOWMechanical SystemsPermit IssuedMaster Built Homes02/27/2023
DOB NOWPlumbingSigned-offJB Buzco Plumbing05/25/2022
DOB NOWGeneral ConstructionPermit IssuedMaster Built Homes02/28/2022
1 project · most recent 03/11/2024
General Wiring
FiledStatusContractorScope
03/11/2024CompleteB & R Electrical ContractingGeneral Wiring
1 project · most recent 10/21/2024
Concrete Wood
FiledStatusContractorScope
10/21/2024Signed-offMaster Built HomesConcrete, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/19/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
03/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
10/23/2024Footing and FoundationWILLIAM MONTAGUEprogress
10/23/2024Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
10/23/2024Wood – Prefabricated I-JoistsWILLIAM MONTAGUEspecial
10/23/2024Mechanical SystemsWILLIAM MONTAGUEspecial
10/23/2024Subsurface Investigations (Borings/Test Pits)BRIAN ARONEspecial
10/23/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
10/23/2024Subgrade InspectionsWILLIAM MONTAGUEspecial
10/23/2024Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
10/23/2024Structural Wood FrameWILLIAM MONTAGUEprogress
10/23/2024FinalWILLIAM MONTAGUEprogress
10/23/2024Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
10/23/2024Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
10/23/2024HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
10/23/2024HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
10/23/2024Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
10/23/2024Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
10/23/2024Fenestration air leakageWILLIAM MONTAGUEenergy_progress
10/23/2024Air barrier — testing WILLIAM MONTAGUEenergy_progress
10/23/2024FireplacesWILLIAM MONTAGUEenergy_progress
10/23/2024Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
10/23/2024Interior lighting powerWILLIAM MONTAGUEenergy_progress
10/23/2024HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
10/23/2024Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
10/23/2024Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
10/23/2024Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
Latest 25 of 61.
56 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account