← Back
BuildNYC
Two family brick
68 SOUTH PORTLAND AVENUE
BROOKLYN · Fort Greene · BIN 3058842
💬 Discuss this project
1852Year Built
3Stories
B1Building Class
R6BZoning
3,120 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family brick · 2,000 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 368 South Portland Ave. LLC1 filing · 18 docs
Floor 268 South Portland Ave. LLC1 filing · 18 docs
Floor 168 South Portland Ave. LLC1 filing · 18 docs
Cellar68 South Portland Ave. LLC1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
To the Owner of the Prem103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/23/2025$3.8M—Private party → Private party$1,218/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
As Engineering Services205/21/2026
Aht Engineering205/21/2026
Lester Katz, Ncarb105/21/2026
Building Lifecycle
All (84)Filed (5)Violation (3)Objection (46)Special Inspection (30)
06/25/2026
Objection resolved — Addressed
06/25/2026
Special inspection requirement — Permanent certificate
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/12/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Structural
06/08/2026
Objection raised — Mechanical
06/08/2026
Objection raised — Energy
06/08/2026
Objection raised — Admin
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Energy
06/08/2026
Objection raised — Inspections
06/08/2026
Objection raised — Structural
06/08/2026
Objection raised — Admin
06/08/2026
Objection raised — Structural
06/08/2026
Objection raised — Cost
06/08/2026
Objection raised — Scope
06/08/2026
Objection raised — Admin
06/08/2026
Objection raised — Mechanical
06/08/2026
Objection raised — Scope
06/08/2026
Objection raised — Scope
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Zoning
06/08/2026
Objection raised — Scope
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Admin
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Structural
06/08/2026
Objection raised — Structural
06/08/2026
Objection raised — Inspections
06/08/2026
Objection raised — Structural
06/08/2026
Objection raised — Scope
06/08/2026
Objection raised — Zoning
06/08/2026
Objection raised — Scope
06/08/2026
Objection raised — Structural
06/08/2026
Objection raised — Cost
06/08/2026
Objection raised — Admin
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Scope
05/21/2026
Filed — Alteration CO
NEW FOUNDATION IN CONJUNCTION WITH ENLARGEMENT OF EXISTING TOWNHOUSE.
B01400493-S2
05/21/2026
Filed — Alteration CO
NEW FOUNDATION IN CONJUNCTION WITH ENLARGEMENT OF EXISTING TOWNHOUSE.
B01400493-S3
05/21/2026
Filed — Alteration CO
NEW FOUNDATION IN CONJUNCTION WITH ENLARGEMENT OF EXISTING TOWNHOUSE.
B01400493-I1
05/21/2026
Filed — Alteration CO
NEW FOUNDATION IN CONJUNCTION WITH ENLARGEMENT OF EXISTING TOWNHOUSE.
B01400493-S4
05/21/2026
Filed — Alteration CO
NEW FOUNDATION IN CONJUNCTION WITH ENLARGEMENT OF EXISTING TOWNHOUSE.
B01400493-S1
05/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/13/2026
Special inspection requirement — Concrete - Cast-In-Place
05/13/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
05/13/2026
Special inspection requirement — Footing and Foundation
05/13/2026
Special inspection requirement — Structural Cold-Formed Steel
05/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/13/2026
Special inspection requirement — Structural Steel - Details
Latest 60 of 84 events.
Nothing on file for this building.
1 project · most recent 05/21/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/21/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NLHZ 5 tons · Condensing Unit ×3
MXZ-SM36NLHZ 3 tons · Condensing Unit ×1
1 project · most recent 05/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/21/2026——Gas, Storm, Water/Sanitary
1 project · most recent 05/21/2026
Steel Masonry Wood
FiledStatusContractorScope
05/21/2026——Steel, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
06/25/2026Permanent certificate—energy_progress
06/25/2026HVAC-R and service water heating system controls—energy_progress
05/21/2026Structural Stability – Alterations of existing buildings—special
05/13/2026Concrete - Cast-In-Place—special
05/13/2026Construction Utilizing CLT or SCL, Type IV—special
05/13/2026Footing and Foundation—progress
05/13/2026Structural Cold-Formed Steel—special
05/13/2026Structural Stability – Alterations of existing buildings—special
05/13/2026Structural Steel - Details—special
05/13/2026Final—progress
05/13/2026Masonry—special
05/13/2026Final—progress
05/13/2026Structural Stability – Alterations of existing buildings—special
05/12/2026Permanent certificate—energy_progress
05/12/2026HVAC-R and service water heating equipment—energy_progress
05/12/2026Maintenance information—energy_progress
05/12/2026HVAC-R and service water piping design and insulation—energy_progress
05/12/2026Mechanical Systems—special
05/12/2026Final—progress
05/12/2026Energy Code Compliance Inspections—progress
05/12/2026HVAC-R and service water heating system controls—energy_progress
05/12/2026HVAC-R and service water heating equipment—energy_progress
05/12/2026HVAC-R and service water piping design and insulation—energy_progress
05/12/2026Maintenance information—energy_progress
05/11/2026Energy Code Compliance Inspections—progress
Latest 25 of 36.
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026B01400493-S4Request digital key ↗
08/16/2026B01400493-S3Request digital key ↗
08/16/2026B01400493-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026B01400493-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026B01400493-S4Open ↗
08/16/2026B01400493-S3Open ↗
08/16/2026B01400493-S2Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026B01400493-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026B01400493-I1Open ↗
▸Other Documents5
▸DOB NOWPlot Diagram2
08/16/2026B01400493-S4Open ↗
08/16/2026B01400493-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026B01400493-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026B01400493-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026B01400493-I1Open ↗