← Back
Two family frame
680 HARRIS AVENUE
STATEN ISLAND · BIN 5020034
💬 Discuss this project
1970Year Built
1Stories
B2Building Class
R3-1Zoning
1,848 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Two family frame · 4,300 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CLIP ARCHITECTS208/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREAT WALL CONSULTANT P.E5633208/18/2026
Building Lifecycle
All (10)Filed (2)Violation (4)Special Inspection (4)
08/18/2026
Filed — Alteration
File to address ECB Violation #39198756J, 39198757L, 39198758N, 39198759P, propose plumbing work at open space of existing residential building as per plan. Restore back to legal condition. No change in use, egress, or occupancy.
S01442195-S1
08/18/2026
Filed — Alteration
File to address ECB Violation #39198756J, 39198757L, 39198758N, 39198759P, propose plumbing work at open space of existing residential building as per plan. Restore back to legal condition. No change in use, egress, or occupancy.
S01442195-I1
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
07/31/2026
Violation issued (ECB, open)
Construction
07/31/2026
Violation issued (ECB, open)
Unknown
07/31/2026
Violation issued (ECB, open)
Construction
07/31/2026
Violation issued (ECB, open)
Zoning
Nothing on file for this building.
1 project · most recent 08/18/2026
Water/Sanitary
FiledStatusContractorScope
08/18/2026——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/11/2026Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
08/11/2026Energy Code Compliance InspectionsJaeyoung Jangprogress
08/11/2026Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
08/11/2026Energy Code Compliance InspectionsJaeyoung Jangprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026S01442195-I1Request digital key ↗
08/19/2026S01442195-S1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026S01442195-I1Open ↗
08/19/2026S01442195-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S01442195-I1Open ↗
08/23/2026S01442195-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01442195-I1Open ↗
08/23/2026S01442195-S1Open ↗