← Back
BuildNYC
Walk-up apt, over six families with stores
680 MELROSE AVENUE
BRONX · BIN 2001366
💬 Discuss this project
1904Year Built
5Stories
C7Building Class
R6Zoning
9,316 sfGross Floor Area
12Units
Rent Stabilized32 Active Violations 31 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 680 LLC · 2,000 sf lot · 4.66 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 12 filings
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
680 LLC103/22/2026
Chestnut Holdings103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2014$2.0M—680 MELROSE EQUITIES LLC → 680 LLC$213/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KDV Designs Architects106/22/2021
Comprehensive Engineering111/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & Associates203/21/2026
Frank Bueno Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Four Star MechanicalPlumbing103/21/2026
Ips PlumbingPlumbing107/08/2026
Demicco Brothers ContractingGeneral Contractor111/07/2002
Master Fire SystemsFire Protection106/04/2013
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SY Engineering5149106/22/2021
JT Engineering7840111/17/2020
Building Lifecycle
09/15/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/22/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2N, 2nd…
HPD violation · open
06/22/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT…
HPD violation · open
06/18/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM NORTH LOCATED AT APT 2N,…
HPD violation · open
05/13/2026
771 (i) §27-2096 hmc: property registration was filed with false or incomplete information related to the property contacts. File with this…
HPD violation · open
211 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Ips Plumbing—
BIS—Master Fire Systems—
BIS—Jack Piccini—
BIS—Demicco Brothers Contracting—
BIS—Four Star Mechanical—
BIS—Nationwide Mechanical—
Nothing on file for this building.
Nothing on file for this building.
35 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account