← Back
BuildNYC
Elevator cooperative
680 REAR WEST 239 STREET
BRONX · BIN 2091926
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R4Zoning
188,200 sfGross Floor Area
110Units
LL97 CoveredRent Stabilized82 Active Violations ▸FDNY Report ↗
Elevator cooperative · 68,625 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofJoseph K. Blum CO. LLP4p · 1 filing · 7 docs
Site & exteriorJoseph K. Blum CO. LLP1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hudson Manor Terrace103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cta Architects103/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D D Expeditors203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brend Restorationspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Autographic Co1579103/07/2023
Catalpa Special Inspectio2004103/07/2023
Building Lifecycle
All (17)Filed (1)Permit Issued (1)Signed Off (1)Objection (10)Special Inspection (4)
07/28/2025
Signed off — Alteration
Install counter flashing at the interior parapet of the main roof, masonry and pointing as necessary, remove scrape, prime, and paint railing then reinstall, remove/replace coping stones.
X00832904-I1
07/27/2023
Permit issued — General Construction
X00832904-I1-GC
03/09/2023
Objection raised — Other
03/09/2023
Objection resolved — Addressed
03/09/2023
Objection raised — Scope
03/09/2023
Objection resolved — Addressed
03/09/2023
Objection raised — Other
03/09/2023
Objection resolved — Addressed
03/09/2023
Objection raised — Scope
03/09/2023
Objection resolved — Addressed
03/09/2023
Objection raised — Scope
03/09/2023
Objection resolved — Addressed
03/07/2023
Filed — Alteration
Install counter flashing at the interior parapet of the main roof, masonry and pointing as necessary, remove scrape, prime, and paint railing then reinstall, remove/replace coping stones.
X00832904-I1
03/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
02/21/2023
Special inspection requirement — Masonry
asghar Ghodsi
02/21/2023
Special inspection requirement — Post-installed Anchors
asghar Ghodsi
02/21/2023
Special inspection requirement — Final
Daniel Allen
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBrend Restoration07/27/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/06/2023Tenant Protection Plan ComplianceERIC BERLENTspecial
02/21/2023Masonryasghar Ghodsispecial
02/21/2023Post-installed Anchorsasghar Ghodsispecial
02/21/2023FinalDaniel Allenprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026X00832904-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X00832904-I1Open ↗
09/01/2026X00832904-I1Open ↗
09/01/2026X00832904-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026X00832904-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026X00832904-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026X00832904-I1Open ↗