Three families
680 ST JOHNS PLACE
BROOKLYN · Crown Heights (North) · BIN 3032150
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
3,063 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 1,584 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof20p · 3 filings · 20 docs
Floor 315p · 3 filings · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar14p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THREE STAR CONSTRUCTION GROUP1007/08/2026
EAGLE STREET DEVELOPMENT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2020$1.5M—Private party → Private party$503/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THREAD COLLECTIVE502/22/2024
GREEN SOLUTIONS ENGINEERING & ENERG412/18/2023
EMPIRE DESIGN CORP307/24/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEECO CONSTRUCTION CORPGeneral Contractor603/21/2026
ORBIT PLBG & HTG INCPlumbing507/08/2026
THREE STAR CONSTRUCTION GGeneral Contractor407/08/2026
ORBIT SPRINKLER CORPFire Protection307/08/2026
RITE WAY CONSTRUCTION CORGeneral Contractor303/21/2026
ORBIT MECHANICAL SOLUTIO*General Contractor107/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC73971002/22/2024
EMPIRE DESIGN CORP5474307/24/2023
Building Lifecycle
All (112)Filed (12)Permit Issued (15)Signed Off (5)Violation (2)Inspection (14)Objection (34)Special Inspection (30)
12/11/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/30/2024
Signed off — Alteration
MISC MECHANICAL WORKAS PER PLANS FIELD HEREWITH.NO CHANGE TO EGRESS, OCCUPANCY OR USE.
B00517108-I1
08/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/22/2024
Signed off — Alteration
Modify plumbing fixtures throughout, install new water service and associated valves. No change to egress, occupancy or use.
B00504757-I1
05/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2024
Signed off — Alteration
INSTALL WET PIPE SPRINKELR SYSTEM THROUGHT. NO CHANGE TO EGRESS, OCCUPANCY OR USE.
B00517110-I1
05/03/2024
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED WITH PIPE SCAFFOLD AT 680 ST JOHNS PLACE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00853729-I1
05/03/2024
Signed off — Alteration
B00446194-I1
03/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/01/2024
Objection raised — Other
03/01/2024
Objection resolved — Addressed
02/22/2024
Filed — Alteration
Modify plumbing fixtures throughout, install new water service and associated valves. No change to egress, occupancy or use.
B00504757-P1
02/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/08/2024
Permit issued — General Construction
B00504752-I1-GC-CX
12/28/2023
Permit issued — Sprinklers
B00517110-I1-PL
12/26/2023
Permit issued — Sprinklers
B00517110-I1-EW-SP
12/26/2023
Objection resolved — Addressed
12/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
12/26/2023
Special inspection requirement — Final
mark mancuso
12/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
mark mancuso
12/26/2023
Special inspection requirement — Air barrier - visual inspection
mark mancuso
12/26/2023
Special inspection requirement — Fenestration areas
mark mancuso
12/26/2023
Special inspection requirement — Lighting in dwelling units
mark mancuso
12/26/2023
Special inspection requirement — Permanent certificate
mark mancuso
12/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
mark mancuso
12/26/2023
Special inspection requirement — Fenestration air leakage
mark mancuso
12/26/2023
Special inspection requirement — Insulation placement and R values
mark mancuso
12/26/2023
Special inspection requirement — Metering
mark mancuso
12/26/2023
Special inspection requirement — Structural Steel - Details
JIAN DENG
12/26/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
12/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
12/21/2023
Special inspection requirement — Mechanical Systems
JIAN DENG
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
12/21/2023
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
12/21/2023
Special inspection requirement — Final
JIAN DENG
12/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
12/21/2023
Special inspection requirement — Maintenance information
JIAN DENG
12/21/2023
Special inspection requirement — Shutoff dampers
JIAN DENG
12/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
12/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
12/18/2023
Filed — Alteration
MISC MECHANICAL WORKAS PER PLANS FIELD HEREWITH.NO CHANGE TO EGRESS, OCCUPANCY OR USE.
B00517108-P1
12/18/2023
Objection resolved — Addressed
12/18/2023
Objection resolved — Addressed
12/15/2023
Objection raised — Zoning
12/15/2023
Objection raised — Other
12/14/2023
Special inspection requirement — Maintenance information
JIAN DENG
12/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
12/14/2023
Special inspection requirement — Mechanical Systems
JIAN DENG
12/14/2023
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
12/14/2023
Special inspection requirement — Final
JIAN DENG
12/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
12/10/2023
Objection resolved — Addressed
12/01/2023
Objection raised — Scope
12/01/2023
Objection raised — Scope
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLEECO CONSTRUCTION CORP01/08/2024
DOB NOWSprinklersSigned-offORBIT PLBG & HTG INC12/28/2023
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP12/26/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC04/06/2023
DOB NOWSidewalk ShedSigned-offTHREE STAR CONSTRUCTION G04/04/2023
DOB NOWSidewalk ShedSigned-offTHREE STAR CONSTRUCTION G04/04/2023
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP01/23/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC01/23/2023
DOB NOWMechanical SystemsSigned-offLEECO CONSTRUCTION CORP01/04/2023
DOB NOWStructuralPermit IssuedLEECO CONSTRUCTION CORP01/04/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC05/06/2022
DOB NOWPlumbingSigned-offORBIT SPRINKLER CORP02/22/2022
DOB NOWSprinklersSigned-offORBIT PLBG & HTG INC02/22/2022
DOB NOWGeneral ConstructionPermit IssuedORBIT MECHANICAL SOLUTIO*02/03/2022
DOB NOWGeneral ConstructionSigned-offRITE WAY CONSTRUCTION COR01/26/2021
BISOTISSUEDBROOKLYN SOLARWORKS LLC05/03/2022
BISEQISSUEDBEST RESTORATION INC04/05/1993
BISOTISSUEDBEST RESTORATION INC04/05/1993
3 projects · most recent 03/28/2024
General Wiring
FiledStatusContractorScope
03/28/2024CompleteERIC & NG ELEC'L, INC.General Wiring
07/07/2023CompleteBROOKYLN SOLARWORKS, LLC—
12/03/2021CompleteJOSEPH WEINSTEIN ELECTRIC—
1 project · most recent 11/28/2023
FiledStatusContractorScope
11/28/2023Permit IssuedLEECO CONSTRUCTION CORP2 scope_items
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
12/26/2023Structural Stability – Alterations of existing buildingsJIAN DENGspecial
12/26/2023Finalmark mancusoprogress
12/26/2023Fire-Resistance Rated Constructionmark mancusoprogress
12/26/2023Air barrier - visual inspectionmark mancusoenergy_progress
12/26/2023Fenestration areasmark mancusoenergy_progress
12/26/2023Lighting in dwelling unitsmark mancusoenergy_progress
12/26/2023Permanent certificatemark mancusoenergy_progress
12/26/2023Fenestration and door U-factor and product ratingsmark mancusoenergy_progress
12/26/2023Fenestration air leakagemark mancusoenergy_progress
12/26/2023Insulation placement and R valuesmark mancusoenergy_progress
12/26/2023Meteringmark mancusoenergy_progress
12/26/2023Structural Steel - DetailsJIAN DENGspecial
12/26/2023Structural Steel - High Strength BoltingJIAN DENGspecial
12/26/2023Fire-Resistant Penetrations and JointsJIAN DENGspecial
12/21/2023Mechanical SystemsJIAN DENGspecial
12/21/2023Fire-Resistant Penetrations and JointsJIAN DENGspecial
12/21/2023Energy Code Compliance InspectionsJIAN DENGprogress
12/21/2023FinalJIAN DENGprogress
12/21/2023HVAC-R and service water heating equipmentJIAN DENGenergy_progress
12/21/2023Maintenance informationJIAN DENGenergy_progress
12/21/2023Shutoff dampersJIAN DENGenergy_progress
12/21/2023HVAC-R and service water heating system controlsJIAN DENGenergy_progress
12/21/2023HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
12/14/2023Maintenance informationJIAN DENGenergy_progress
12/14/2023HVAC-R and service water heating system controlsJIAN DENGenergy_progress
Latest 25 of 37.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
09/01/2026B00504757-I1Request digital key ↗
09/01/2026B00517108-P1Request digital key ↗
09/01/2026B00517108-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/02/2026B00446194-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
11/21/2023340842262Open ↗
08/03/2023340842262Open ↗
05/02/2022340842262Open ↗
▸BISWORK PERMIT APPLICATION1
05/03/2022340842262Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00504752-I1Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature24
09/21/2026B00517108-P1Open ↗
09/21/2026B00517108-P1Open ↗
09/21/2026B00517108-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/21/2026B00517108-P1Open ↗
09/21/2026B00517108-P1Open ↗
08/31/2026B00853729-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026B00446194-I1Open ↗
09/01/2026B00504757-P1Open ↗
09/01/2026B00504757-I1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/02/2022340842262Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026B00504752-I1Open ↗
08/13/2026B00504752-P1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
05/03/2022340842262Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00504752-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/01/2026B00504757-I1Open ↗
09/01/2026B00517108-I1Open ↗
08/15/2026B00517110-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/02/2022340842262Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00504752-I1Open ↗
08/13/2026B00517108-I1Open ↗
08/13/2026B00504757-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/13/2023340842262Open ↗
05/02/2022340842262Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/13/2023340842262Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
12/14/2023340842262Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
05/02/2022340842262Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/13/2023340842262Open ↗
05/02/2022340842262Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/14/2023340842262Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/14/2023340842262Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/13/2023340842262Open ↗
05/02/2022340842262Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
11/28/2023340842262Open ↗
09/27/2023340842262Open ↗
09/27/2023340842262Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/02/2022340842262Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026B00504752-I1Open ↗