DOB11/07/1994V-DOB VIOLATION - ACTIVE
ECB12/27/1993ABANDONED AND DISCONTINUED OPERATIONS OPEN AND ABANDON SITE, PARTIAL WALL AND FORMATION STILL IN PLACE. REMEDY:PROVIDE 8' FT SOLID FENCE OR REMOVE FOUNDATION TO GRADE.Nothing owed — awaiting certificate of correction
ECB03/13/1989FAILURE TO MAINTAIN EXTERIOR ROOF DEFECT IS: SECTION OF ROOF AT NORTH AREA ADJACENT TO CHIMNEY IS BURNED, PARTLY MISSING AND DEFECTIVE. REMEDY: REPAIR AND RESTORE SIDE ROOF TO A SAFE AND LAWFUL CONDITION.Nothing owed — awaiting certificate of correction
ECB01/09/1989FAILURE TO PROVIDE PROTECTION AT FRONT AND SIDES OF ERCAVATION: GUARD RAIL FENCE 3'6" HIGH REQUIRED. REMEDY: PROVIDE REQUIRED GUARDRAIL FENCE 3'6" HIGH AT FRONT AND SIDES OF EXCAVATION.Nothing owed — awaiting certificate of correction
ECB01/09/1989FAILURE TO PROVIDE A SOLID FENCE OF HIGH AROUND PRIMETER OF OPEN FOUNDATION. REMEDY: PROVIDE REQUIRED OF FT. HIGH SOLID FENCE AROUND PREMETER OF OPEN FOUNDATION.Nothing owed — awaiting certificate of correction
ECB01/09/1989FAILURE TO PROVIDE A SOLID FENCE 8 FT. HIGH AROUND PRIMETER OF OPEN FOUNDATION. REMEDY: PROVIDE REQUIRED 8 FT. FENCE AROUND PRIMETER OF OPEN FOUNDATION.Nothing owed — awaiting certificate of correction
ECB01/09/1989FAILURE TO PROVIDE PROTECTION AT FENCE AND SIDES OF EXCAVATION GUARDRUILL FENCE 3'6" HIGH REQUIRED. REMEDY: PROVIDE REQUIRED GUARDRAIL FENCE.Nothing owed — awaiting certificate of correction
ECB01/09/1989FAILURE TO PROVIDE A SOLID FENCE 8 FT. HIGH AROUND PRIMETER OF OPEN FOUNDATION. REMEDY: PROVIDE REQUIRED 8 FT. HIGH SOLID FENCE AROUND PRIMETER OF OPEN FOUNDATION.Nothing owed — awaiting certificate of correction
ECB11/03/1988FAILURE TO PROVIDE PROTECTION AT FRONT AND SIDES OF EXCAVATION. GUARDRAIL FENCE 3'6" HIGH REQUIRED. REMEDY: PROVIDE REQUIRED GUARDERAIL FENCE 3'6" HIGH AT FRONT.Nothing owed — awaiting certificate of correction