| Owner | Filings | Most Recent |
|---|---|---|
| RIVERSIDE TOWERS | 6 | 07/08/2026 |
| YORK TOWERS | 8 | 07/08/2026 |
| KINGS GROUP NY CORP | 7 | 03/22/2026 |
| CASTCAPA CONSTRUCTION | 1 | 03/22/2026 |
| ARI GROUP | 1 | 03/22/2026 |
| DOUGLAS ELLIMAN PROPERTY MGMT | 2 | 03/21/2026 |
| BROWN HARRIS STEVENS MGMT LLC | 2 | 03/21/2026 |
| CUMBERLAND HOUSE CORP C-O DEPM | 9 | 03/21/2026 |
| BROWN HARRIS STEVENS RESIDENTIAL | 2 | 03/21/2026 |
| CUMBERLAND HOUSE CORP C-O BHS | 12 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EUGENE KHANANOV ARCHITECT | 2 | 08/26/2026 |
| FALCON ENGINEERING CO. LLC | 3 | 04/20/2026 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 3 | 04/14/2026 |
| ANDERSON ALEXANDER BUILDERS LLC | 1 | 06/27/2025 |
| KENDALL ENGINEERING PC | 2 | 06/04/2025 |
| JOCK DEBOER, AIA | 2 | 05/16/2025 |
| PIRO STUDIO LLC | 5 | 04/28/2025 |
| RICHARD ALLON, ARCHITECT | 1 | 04/15/2025 |
| MOJO STUMER ASSOCIATES, P.C. | 2 | 03/13/2025 |
| RIMKUS | 2 | 01/13/2025 |
| J7 ARCHITECTURE AND DESIGN | 5 | 02/02/2024 |
| L+L ARCHITECTURE, PLLC | 4 | 11/09/2022 |
| IP GROUP | 5 | 10/14/2022 |
| HNY CONSULTING ENGINEERS LLC | 5 | 05/13/2022 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 05/06/2022 |
| THE FALCON GROUP | 1 | 03/22/2022 |
| PATUXENT ENGINEERING LLC | 1 | 02/11/2022 |
| JAM ARCHITECTURE, PLLC | 2 | 12/06/2021 |
| LAWLESS AND MANGIONE ARCHITECTS AND | 1 | 12/03/2021 |
| A2 ARCHITECT, PC | 2 | 07/07/2021 |
| SALVATOR A. CARADONNA JR. | 2 | 07/06/2021 |
| CALLISONRTKL ARCHITECTS, P.C. | 2 | 03/31/2021 |
| CSANAD BODNAR ARCHITECT | 1 | 02/22/2021 |
| JONATHAN BOWSER ARCHITECT | 1 | 02/26/2020 |
| DOOLING & COMPANY ARCHITECTS | 1 | 04/17/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 8 | 03/21/2026 |
| PRAXIS WORKSHOP | 8 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 6 | 03/21/2026 |
| FALCON GROUP | 4 | 03/21/2026 |
| DI DIO ARCHITECTURE, PC | 10 | 03/21/2026 |
| A+ EXPEDITING | 4 | 03/21/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 6 | 03/21/2026 |
| EC EXPEDITING AND SERVICES | 6 | 03/21/2026 |
| GILLMAN CONSULTING | 12 | 03/21/2026 |
| KMA DESIGNS LLC | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| EXA USA,CORP | General Contractor | 13 | 07/08/2026 |
| STRUCTURE VENTURES LLC | General Contractor | 10 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 8 | 07/08/2026 |
| I & M CONSTRUCTION LLC | General Contractor | 6 | 03/21/2026 |
| MANHATTAN D ENTERPRISES | General Contractor | 6 | 03/21/2026 |
| UNIVERSAL PLUMBING INC | Plumbing | 5 | 07/08/2026 |
| YATES EXTERIOR RESTORATION | General Contractor | 4 | 07/08/2026 |
| HUDSON CONTRACTING GROUP | General Contractor | 4 | 07/08/2026 |
| SKYLINE RESTORATION INC | General Contractor | 4 | 07/08/2026 |
| VSP MECHANICAL INC | Plumbing | 3 | 07/08/2026 |
| KINGS GROUP NY CORP | General Contractor | 3 | 03/21/2026 |
| URBAN INTELLIGENCE, INC | General Contractor | 3 | 03/21/2026 |
| CAPITOL AWNING CO INC | General Contractor | 3 | 07/08/2026 |
| ARI GROUP, INC | General Contractor | 3 | 07/08/2026 |
| GREGG NY PLUMBING, INC | Plumbing | 2 | 07/08/2026 |
| G&B PLUMBING&HEATING CORP | Plumbing | 2 | 07/08/2026 |
| JOE PARZIALE PLUMBING CO | Plumbing | 2 | 07/08/2026 |
| DICKSON, CHARD | Electrical | 2 | 03/21/2026 |
| KEPTECH BUILDERS GRP LLC | General Contractor | 2 | 07/08/2026 |
| AVELLINO, LOUIS | Electrical | 2 | 03/21/2026 |
| GDC CONTRACTING LLC | General Contractor | 2 | 07/08/2026 |
| INTEGRITY CONTRACTING INC | General Contractor | 2 | 03/21/2026 |
| IRON WORKERS LOCAL 40 | Electrical | 1 | 03/21/2026 |
| INTER CONNECTION ELETRIC | Electrical | 1 | 03/22/2026 |
| CAMPISI PETER | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| STEEL CORE ENGINEERING PL | 1098 | 2 | 08/26/2026 |
| FALCON ENGINEERING CO.LLC | 5649 | 4 | 04/20/2026 |
| COMPLY BUILDING GROUP | 8622 | 4 | 04/14/2026 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 2 | 09/15/2025 |
| SIA INSPECTIONS LLC | 7306 | 1 | 06/27/2025 |
| KENDALL ENGINEERING PC | 4154 | 1 | 06/04/2025 |
| JOCK DEBOER, AIA - SIA | 7008 | 2 | 05/16/2025 |
| PIRO STUDIO LLC | 7503 | 5 | 04/28/2025 |
| PCS ENGINEERING | 3745 | 1 | 07/18/2024 |
| A TECH ENGINEERING NYC, P | 6738 | 1 | 05/03/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | GW MECHANICAL CORP | 09/10/2026 |
| DOB NOW | General Construction | Permit Issued | ALLERTONFOX CONSTRUCTION | 09/03/2026 |
| DOB NOW | General Construction | Signed-off | HUDSON CONTRACTING GROUP | 06/22/2026 |
| DOB NOW | Structural | Permit Issued | YATES EXTERIOR RESTORATION | 05/13/2026 |
| DOB NOW | Structural | Permit Issued | YATES EXTERIOR RESTORATIO | 09/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HUDSON CONTRACTING GROUP | 07/29/2025 |
| DOB NOW | Plumbing | Signed-off | GREGG NY PLUMBING, INC | 07/23/2025 |
| DOB NOW | General Construction | Permit Issued | I & M CONSTRUCTION LLC | 07/21/2025 |
| DOB NOW | General Construction | Signed-off | HUDSON CONTRACTING GROUP | 07/10/2025 |
| DOB NOW | General Construction | Signed-off | INTEGRITY CONTRACTING INC | 07/03/2025 |
| DOB NOW | Plumbing | Permit Issued | EXPRESS PLBG SWR & WTR MA | 06/11/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | I & M CONSTRUCTION LLC | 05/12/2025 |
| DOB NOW | Plumbing | Permit Issued | AUTHENTIC PLBG CORP | 04/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE VENTURES LLC | 01/13/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE VENTURES LLC | 01/13/2025 |
| DOB NOW | General Construction | Signed-off | CASTCAPA CONSTRUCTION | 10/16/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | KINGS GROUP NY CORP | 10/11/2024 |
| DOB NOW | General Construction | Permit Issued | BR CONSTRUCTION GROUP INC | 10/04/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | SPD CONSTRUCTION CORP | 07/29/2024 |
| DOB NOW | Plumbing | Signed-off | VILLAGE P & H NY INC | 06/03/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE VENTURES LLC | 05/28/2024 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE VENTURES LLC | 05/28/2024 |
| DOB NOW | General Construction | Signed-off | HUDSON CONTRACTING GROUP | 06/22/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | URBAN INTELLIGENCE, INC | 05/23/2023 |
| DOB NOW | Plumbing | Signed-off | GREGG NY PLUMBING, INC | 04/07/2023 |
| DOB NOW | General Construction | Signed-off | ALCO STORE DEVELOPMENT CO | 04/05/2023 |
| DOB NOW | General Construction | Signed-off | SKYLINE RESTORATION INC | 02/16/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | MANHATTAN D ENTERPRISES | 02/14/2023 |
| DOB NOW | General Construction | Signed-off | SKYLINE RESTORATION INC | 12/16/2022 |
| DOB NOW | Sprinklers | Signed-off | AMOK INC | 11/15/2022 |
| DOB NOW | Plumbing | Signed-off | UNIVERSAL PLUMBING INC | 08/04/2022 |
| DOB NOW | General Construction | Signed-off | GDC CONTRACTING | 07/13/2022 |
| DOB NOW | Supported Scaffold | Signed-off | SPRING SCAFFOLDING LLC | 05/09/2022 |
| DOB NOW | General Construction | Signed-off | SKYLINE RESTORATION INC | 04/22/2022 |
| DOB NOW | Plumbing | Signed-off | WALTER J.GRANDE P & H INC | 04/19/2022 |
| DOB NOW | General Construction | Signed-off | GDC CONTRACTING | 04/15/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | MANHATTAN D ENTERPRISES | 02/15/2022 |
| DOB NOW | Plumbing | Signed-off | NICE PLUMBING CORP | 01/28/2022 |
| DOB NOW | Plumbing | Signed-off | UNIVERSAL PLUMBING INC | 01/21/2022 |
| DOB NOW | Plumbing | Signed-off | UNIVERSAL PLUMBING INC | 10/31/2021 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/04/2025 | Signed-off | HUDSON CONTRACTING GROUP | Heating and Air Conditioning Systems | Heat / Cool Applied Comfort NYWC15K00E7P 370 CFM · Ptac ×2 NYWC12K00E7P 370 CFM · Ptac ×1 NYWC17K00E7N 470 CFM · Ptac ×1 |
| 05/16/2025 | Permit Issued | I & M CONSTRUCTION LLC | Air Conditioning Systems, Heating Systems | Cooling Mitsubishi Electric Mitsubishi PUZ-A30 30,000 BTU · Heat Pump Outdoor ×1 Mitsubishi MXZ-3C30 30,000 BTU · Vrf Outdoor ×1 Heating Mitsubishi Electric Mitsubishi MXZ-3C30 36,000 BTU · Vrf Outdoor ×1 Mitsubishi PUZ-A30 34,000 BTU · Heat Pump Outdoor ×1 |
| 02/04/2025 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PVF-P08NAMU-E1 9,000 BTU · Vrf Indoor ×2 MXZ-SM48NAM2 48,000 BTU · Condensing Unit ×1 PVFY-P12NAMU-E1 13,500 BTU · Vrf Indoor ×1 PVFY-P24NAMU-E1 27,000 BTU · Vrf Indoor ×1 Ventilation Panasonic Whisper FV-0511VFL1 50 CFM · Exhaust Fan ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | GW MECHANICAL CORP | Water/Sanitary |
| 04/14/2026 | Permit Issued | AUTHENTIC PLBG CORP | Gas, Water/Sanitary |
| 06/04/2025 | Signed-off | GREGG NY PLUMBING, INC | Water/Sanitary |
| 05/16/2025 | Permit Issued | EXPRESS PL SWR & WTR A | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/20/2026 | Permit Issued | FOCUS ELECTRICAL INC | General Wiring |
| 01/21/2026 | Permit Issued | WCK ELECTRIC CORP. | General Wiring |
| 07/22/2025 | Complete | A.L. ELECTRICAL CORP. | General Wiring |
| 05/21/2025 | Permit Issued | VLASHAVA ELEC CONTR'G COR | General Wiring |
| 05/16/2025 | Complete | ARMA ELECTRIC INC | General Wiring |
| 10/18/2024 | Complete | HIGH QUALITY ELECTRIC OF | — |
| 09/25/2024 | Permit Issued | EGG ELECTRIC INC. | General Wiring |
| 12/27/2023 | Complete | A.L. ELECTRICAL CORP. | General Wiring |
| 11/28/2022 | Permit Issued | TRIBORO ELEC'L CONTR'G CO | General Wiring |
| 07/10/2022 | Complete | JTE ELECTRICAL SERVICES | — |
| 06/22/2022 | Complete | INTEGRAL ELECL PWR & CNTR | General Wiring |
| 05/04/2022 | Complete | EINSTEIN ELEC'L CORP | General Wiring |
| 02/23/2022 | Complete | V. VASS ELECTRIC CORP | — |
| 02/18/2022 | Complete | 5 J'S ELECTL CONTS CORP | — |
| 12/20/2021 | Complete | BASS ELECTRICAL CORP. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/20/2026 | Permit Issued | YATES EXTERIOR RESTORATIO | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | GW MECHANICAL CORP | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/18/2024 | Permit Issued | — | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/23/2026 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 07/23/2026 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 07/23/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/23/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/06/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/04/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/05/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 11/05/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/28/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/08/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/22/2025 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 07/22/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 07/08/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/02/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/10/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/14/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/25/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/16/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 12/16/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/10/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/12/2026 | Lighting in dwelling units | Alexander Sheyman | energy_progress |
| 08/12/2026 | Energy Code Compliance Inspections | Alexander Sheyman | progress |
| 08/12/2026 | Fire-Resistance Rated Construction | Alexander Sheyman | progress |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | Alexander Sheyman | special |
| 08/12/2026 | Energy Code Compliance Inspections | Alexander Sheyman | progress |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | Alexander Sheyman | special |
| 08/12/2026 | Post-installed Anchors | Alexander Sheyman | special |
| 08/12/2026 | Final | Alexander Sheyman | progress |
| 05/22/2026 | Fire-Resistant Penetrations and Joints | ANA ACCETTA | special |
| 05/22/2026 | Energy Code Compliance Inspections | ANA ACCETTA | progress |
| 05/22/2026 | HVAC-R and service water piping design and insulation | ANA ACCETTA | energy_progress |
| 04/20/2026 | Post-installed Anchors | Anthony Volpe | special |
| 04/20/2026 | Fire-Resistant Penetrations and Joints | Anthony Volpe | special |
| 04/20/2026 | Structural Stability – Alterations of existing buildings | Anthony Volpe | special |
| 04/20/2026 | Final | Anthony Volpe | progress |
| 04/20/2026 | Tenant Protection Plan Compliance | JONAR MADRIAGA | special |
| 04/20/2026 | Concrete - Cast-In-Place | Anthony Volpe | special |
| 03/24/2026 | Tenant Protection Plan Compliance | — | special |
| 03/03/2026 | Structural Stability – Alterations of existing buildings | Anthony Volpe | special |
| 03/03/2026 | Post-installed Anchors | Anthony Volpe | special |
| 03/03/2026 | Fire-Resistant Penetrations and Joints | Anthony Volpe | special |
| 03/03/2026 | Concrete - Cast-In-Place | Anthony Volpe | special |
| 03/03/2026 | Final | Anthony Volpe | progress |
| 02/13/2026 | HVAC-R and service water piping design and insulation | ANA ACCETTA | energy_progress |
| 02/13/2026 | Fire-Resistant Penetrations and Joints | ANA ACCETTA | special |