← Back
BuildNYC
Primarily 2 family with 1 store or office
6811 20TH AVENUE
BROOKLYN · Bensonhurst · BIN 3135070
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R5Zoning
3,306 sfGross Floor Area
3Units
2 Active Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 6811 20th Ave · 1,710 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Acc Office3 filings · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
City Building NY Architect303/31/2025
Building Lifecycle
All (20)Filed (3)Violation (3)Objection (3)Special Inspection (11)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/29/2025
Objection raised — Admin
04/29/2025
Objection raised — Admin
04/29/2025
Objection raised — Other
03/31/2025
Filed — Alteration
To file PL plumbing work in conjunction with DOB Now Build application job#B01199569. No change in use, egress or occupancy under this application.
B01199583-I1
03/27/2025
Filed — Alteration
Renovation of an existing business store U.G. 6 at the 1st floor. No change in use, egress or occupancy under this application.
B01199569-I1
03/27/2025
Filed — Alteration
To file MS mechanical work in conjunction with DOB Now Build application job#B01199569. No change in use, egress or occupancy under this application.
B01199686-I1
03/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
03/27/2025
Special inspection requirement — Energy Code Compliance Inspections
03/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
03/27/2025
Special inspection requirement — Insulation placement and R values
03/27/2025
Special inspection requirement — Lighting controls
03/27/2025
Special inspection requirement — Interior lighting power
03/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
03/24/2025
Special inspection requirement — Mechanical Systems
03/24/2025
Special inspection requirement — Final
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2008
Violation issued (ECB, closed)
Boilers
Nothing on file for this building.
1 project · most recent 03/27/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2025——Air Conditioning Systems
Cooling
Mitsubishi Electric MXZ-3C30NA 72,000 BTU · Heat Pump Outdoor ×2
MXZ-4C36NA 43,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 03/31/2025
Water/Sanitary
FiledStatusContractorScope
03/31/2025——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
03/27/2025HVAC-R and service water piping design and insulation—energy_progress
03/27/2025Energy Code Compliance Inspections—progress
03/27/2025Fire-Resistance Rated Construction—progress
03/27/2025Insulation placement and R values—energy_progress
03/27/2025Lighting controls—energy_progress
03/27/2025Interior lighting power—energy_progress
03/27/2025HVAC-R and service water heating system controls—energy_progress
03/27/2025Fire-Resistant Penetrations and Joints—special
03/27/2025HVAC-R and service water heating equipment—energy_progress
03/24/2025Mechanical Systems—special
03/24/2025Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Acc OfficeRetailFloor 1
Project B01199569 Alteration · Objections · 03/27/2025
Project B01199686 Alteration · Objections · 03/27/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026B01199569-I1Request digital key ↗
08/22/2026B01199686-I1Request digital key ↗
08/22/2026B01199583-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026B01199569-I1Open ↗
08/22/2026B01199583-I1Open ↗
08/13/2026B01199686-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026B01199583-I1Open ↗