DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB01/17/2020VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB01/17/2020VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB03/03/2015V-DOB VIOLATION - ACTIVE
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
HPD06/11/2010SECTION 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOSE HOLD ITEMS AT PUBLIC HALL, 3rd STORY
HPD06/11/2010SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE AT ENTRANCE DOOR TO BUILDING , 1st STORY
HPD04/06/2010SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING DOOR AT EAST WALL CABINET IN THE KITCHEN LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD04/06/2010SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD04/06/2010SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD04/06/2010SECTION 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOSEHOLD ITEMS AT PUBLIC HALL, 3rd STORY
HPD04/06/2010SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE OVEN DOOR AT GAS RANGE IN THE KITCHEN LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/31/1991VP-VIOLATION UNSERVED ECB-ACTIVE
ECB06/02/200818B.50A.32A.50B. 50A INSTALL DRAIN FOR GAUGE GLASS ASSEMBLY 50B REPAIR DAMAGE SHEET ROCK FIRE RATED MATERIALNothing owed — awaiting certificate of correction
ECB06/02/2008BQ9.36.48A.18B.50A.50B.50C.50D BQ9 27-147 FULTON GAS FIRED HIGH PRESSURE BOILER INSTALLED W/O OBTAINING APPROVAL AND PERMITS FROM NYC DEPT OF BLDG BOILER W/O OBTAINING AN APPROVAL AND PERMITS FROM THE NYC DOBNothing owed — awaiting certificate of correction
ECB10/30/2006HAZARDOUS. BQ9,B4B,36. (BQ9) FULTON V.T BOILER, 10HP, NB 75301, GAS, 1996 (27-793) OPERATING A HIGH PRESSURE BOILER W/O A VALID CERTIFICATE ISSUED BY THE DOB. (36) BOILER NOT REGISTERED BY DOB AFTER BEINGNothing owed — awaiting certificate of correction
ECB10/17/2006HAZARDOUS. BQ9,B4B,50A,36. BQ9 FULTON V.T BOILER 10HP, NB 61516, GAS 1991. (27-793) OPERATING A HIGH PRESSURE BOILER W/O A VALID CERTIFICATEISSUED BY THE DOB. HAZ BQ9 CONSTRUCTING A BOILER RM ENCLOSURE W/O ANothing owed — awaiting certificate of correction
ECB03/02/2005BQ9/36 FULTON V.T. BOILER 15HP, NB75301, GAS-FIRED 1996 BQ9 (27-147) THE REFERENCED BOILER WAS INSTALLED AND PUT IN OPERATION WITHOUT THE REQUIRED BL WORK-TYPE OR ARA PERMIT. RESPONDENT MUST SUBMIT A SIGNED OFFNothing owed — awaiting certificate of correction
ECB03/02/2005BQ9/36 FULTON V.T. BOILER, 10HP, NB 61516, GAS-FIRED, 1991 BQ9 (27-147) THE REFERENCED BOILER WAS INSTALLED AND PUT IN OPERATION WITHOUT THEREQUIRED BL WORK-TYPE OR ARA PERMIT. RESPONDENT MUST SUBMIT A SIGNEDNothing owed — awaiting certificate of correction
ECB10/09/19914-A,18-B,36Nothing owed — awaiting certificate of correction
ECB10/09/19914-A,18-B,36Nothing owed — awaiting certificate of correction
ECB10/09/19914A,18B,36Nothing owed — awaiting certificate of correction
ECB08/31/19914A,18B,36Nothing owed — awaiting certificate of correction