← Back
Miscellaneous two family
6817 AVENUE T
BROOKLYN · Marine Park-Mill Basin-Bergen Beach · BIN 3236520
💬 Discuss this project
1986Year Built
2Stories
B9Building Class
R3-1Zoning
2,236 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Miscellaneous two family · 3,561 sf lot · 0.63 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELITE PROPERTIES NYC903/22/2026
U S BANK TRUST N A103/22/2026
BLEM 26 LLC103/22/2026
ELITE PROPERTIES NYC 101 LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2022$1.2M—— → —$537/sf building
05/04/2022$710K—Private party → ELITE PROPERTIES NYC 101 LLC$318/sf building
09/18/2018$656K—— → —$293/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CX CONSULTING CORP206/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G DESIGN DRAFTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINLI.CONSTRUCTION LLCGeneral Contractor303/21/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
XC ENGINEERING PC6692106/02/2022
Building Lifecycle
All (77)Filed (2)Permit Issued (2)Signed Off (2)Violation (60)Inspection (6)Special Inspection (5)
11/24/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
11/03/2022
Signed off — Alteration
B00744074-I1
10/31/2022
Signed off — Alteration
REMOVE ILLEGAL PARTITIONS & DOORS AT CELLAR. INTERIOR RENOVATION OF EXIST'G (2) FAMILY HOUSE WITH MECHANICAL WORK. PLUMBING JOB WILL BE FILED SEPARATELY. REMEDY ECB VIOLATION 35213272K, AND OTHER (18) RELATED ECB VIOLATIONS.
B00744071-I1
10/31/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/27/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/18/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/14/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/22/2022
Permit issued — Plumbing
B00744074-I1-PL
06/21/2022
Permit issued — General Construction
B00744071-I1-GC-CX
06/02/2022
Filed — Alteration
B00744074-I1
06/02/2022
Filed — Alteration
REMOVE ILLEGAL PARTITIONS & DOORS AT CELLAR. INTERIOR RENOVATION OF EXIST'G (2) FAMILY HOUSE WITH MECHANICAL WORK. PLUMBING JOB WILL BE FILED SEPARATELY. REMEDY ECB VIOLATION 35213272K, AND OTHER (18) RELATED ECB VIOLATIONS.
B00744071-I1
05/29/2022
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
05/29/2022
Special inspection requirement — Maintenance information
XIU CHEN
05/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
XIU CHEN
05/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
XIU CHEN
05/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
XIU CHEN
12/15/2020
Violation issued (HPD, closed)
B
12/15/2020
Violation issued (HPD, closed)
B
12/15/2020
Violation issued (HPD, closed)
B
12/15/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
A
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
11/25/2020
Violation issued (HPD, closed)
I
11/24/2020
Violation issued (HPD, closed)
B
11/24/2020
Violation issued (HPD, closed)
C
11/24/2020
Violation issued (HPD, closed)
B
11/24/2020
Violation issued (HPD, closed)
C
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2020
Violation issued (HPD, closed)
B
01/29/2020
Violation issued (HPD, closed)
B
01/29/2020
Violation issued (HPD, closed)
C
01/29/2020
Violation issued (HPD, closed)
B
01/29/2020
Violation issued (HPD, closed)
B
01/29/2020
Violation issued (ECB, closed)
Boilers
01/29/2020
Violation issued (HPD, closed)
B
01/23/2020
Violation issued (HPD, closed)
C
01/23/2020
Violation issued (HPD, closed)
C
01/23/2020
Violation issued (HPD, closed)
B
01/23/2020
Violation issued (HPD, closed)
B
01/22/2020
Violation issued (HPD, closed)
A
01/22/2020
Violation issued (HPD, closed)
B
01/22/2020
Violation issued (HPD, closed)
B
01/22/2020
Violation issued (HPD, closed)
B
01/22/2020
Violation issued (HPD, closed)
B
01/22/2020
Violation issued (HPD, closed)
B
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN06/22/2022
DOB NOWGeneral ConstructionSigned-offXINLI.CONSTRUCTION LLC06/21/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/14/2022Fail-Final General Construction Non-Directive 14FailView ↗
09/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/29/2022Energy Code Compliance InspectionsXIU CHENprogress
05/29/2022Maintenance informationXIU CHENenergy_progress
05/29/2022HVAC-R and service water piping design and insulationXIU CHENenergy_progress
05/29/2022HVAC-R and service water heating system controlsXIU CHENenergy_progress
05/29/2022HVAC-R and service water heating equipmentXIU CHENenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026B00744071-I1Request digital key ↗
08/29/2026B00744074-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00744071-I1Open ↗
08/13/2026B00744074-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00744074-I1Open ↗
08/23/2026B00744074-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00744071-I1Open ↗
08/13/2026B00744074-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00744074-I1Open ↗
08/13/2026B00744071-I1Open ↗