ECB07/01/2013B254,3A,44A,48A,50,50A,50B,50C. 50-BOTH PRESSURE CONTROLS ON THE SAME1/4 PIPE TO BOILER; 50A-BOILER WATER FEED DIRECT INTO CASTIRON BOILER;50B-BOILER SAFETY VALVE DISCHARGE PIPE MADE OF PLASTIC; 50C-HOT WATERNothing owed — awaiting certificate of correction
Primarily 1 family with 1 store or office · 1,700 sf lot · 1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.