← Back
BuildNYC
Two family converted from one family
6820 52ND DRIVE
QUEENS · Maspeth · BIN 4055786
💬 Discuss this project
1950Year Built
1Stories
B3Building Class
R4-1Zoning
1,557 sfGross Floor Area
2Units
Two family converted from one family · 2,100 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Sub-BasementConvert dwelling to two family units2p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/24/2022$928K—Private party → Private party$596/sf building
07/17/2019$682K—Private party → Private party$438/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zheng Engineering201/17/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cam Energy Heating and MePlumbing207/08/2026
PipestylistsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Office of Xiao Ye Zheng7471201/17/2020
Building Lifecycle
06/17/2020
Signed off — Alteration
TO CONVERT EXISTING 1 FAMILY DWELLING UNIT TO 2 FAMILY DWELLING UNITS. PROPOSED NEW KITCHEN, 3 PIECE BATHROOM, NEW BOILER+H.W.H. COMBO. WORK IN CONJUNCTION WITH ALT-1 JOB APPLICATION #421884731 AS PROPOSED PLAN SUBMITTED. ALL WORK AT BASEMENT FOR PLUMBING
Q00228227-I1
02/04/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
02/04/2020
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
02/04/2020
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
02/04/2020
Special inspection requirement — HVAC insulation and sealing
XIAO ZHENG
20 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T Plumbing01/02/2020
DOB NOWPlumbingSigned-offCam Energy Heating and Me10/26/2019
DOB NOWPlumbingSigned-offCam Energy Heating and Me10/04/2019
1 project · most recent 10/08/2019
General Wiring
FiledStatusContractorScope
10/08/2019CompleteJ Y ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
02/04/2020Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
02/04/2020Fire-Resistance Rated ConstructionXIAO ZHENGprogress
02/04/2020Energy Code Compliance InspectionsXIAO ZHENGprogress
02/04/2020HVAC insulation and sealing XIAO ZHENGenergy_progress
02/04/2020HVAC and service water heating system controls XIAO ZHENGenergy_progress
02/04/2020HVAC and service water heating equipment XIAO ZHENGenergy_progress
01/17/2020Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
01/17/2020Energy Code Compliance InspectionsXIAO ZHENGprogress
01/17/2020Fire-Resistance Rated ConstructionXIAO ZHENGprogress
01/17/2020HVAC and service water heating equipment XIAO ZHENGenergy_progress
01/17/2020HVAC insulation and sealing XIAO ZHENGenergy_progress
01/17/2020HVAC and service water heating system controls XIAO ZHENGenergy_progress
57 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account