General warehouse
683 COURT STREET
BROOKLYN · BIN 3430137
💬 Discuss this project
2023Year Built
3Stories
E1Building Class
M3-1Zoning
254,330 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFDNY Report ↗
General warehouse · Owner of record: RXR-Lba Red Hook Court Street Owner · 141,050 sf lot · 1.8 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRxr-lba Red Hook Owner LLC115p · 2 filings · 20 docs
BulkheadRxr-lba Red Hook Owner LLC5p · 2 filings · 20 docs
Floor 4Rxr-lba Red Hook Court Street Owner7p · 2 filings · 5 docs
Floor 3Rxr-lba Red Hook Owner LLC170p · 3 filings · 20 docs
Floor 2Rxr-lba Red Hook Owner LLC169p · 3 filings · 20 docs
Floor 1ConEd211p · 14 filings · 20 docs
MezzanineRxr-lba Red Hook Owner LLC150p · 1 filing · 20 docs
CellarRxr-lba Red Hook Owner LLC17p · 1 filing · 20 docs
Site & exteriorRxr-lba Red Hook Owner LLC108p · 10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RXR-Lba Red Hook Court Street Owner7407/08/2026
RXR-Lba Red Hook Owners803/22/2026
Manhattan Constructors607/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates5803/21/2026
Building Brothers403/21/2026
A1 Expediting Service603/21/2026
Lombardo Building Consultants303/21/2026
AE Design Solution203/21/2026
JMG Consultants203/21/2026
EC Building Consultants203/21/2026
Line Design103/21/2026
Cornerstone Consulting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hunter Roberts ConstructionGeneral Contractor2307/08/2026
Stat Fire Sprinkler NYCFire Protection707/08/2026
S&E Bridge & ScaffoldScaffold603/21/2026
Aabco Sheet Metal Cospecialty_contractor603/21/2026
TT MechanicalPlumbing507/08/2026
FM95NYGeneral Contractor303/21/2026
Winick ProductionsGeneral Contractor203/21/2026
Ecd NYGeneral Contractor203/21/2026
Precise Construction ConrGeneral Contractor203/21/2026
Team ElectricElectrical203/22/2026
Manhattan Constructors*Scaffold207/08/2026
Red Hook Sign and ElectricSign hanger107/08/2026
Bayport ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio2004811/05/2025
MEP Inspections1102103/27/2025
Atlas ATC Engineering8011906/17/2024
Atlantic Engineeringlabor1381905/22/2024
Leo Y Lee Associates2481107/31/2023
Desimone Consulting Engineering5942405/04/2023
Building Lifecycle
All (177)Filed (44)Permit Issued (42)Signed Off (21)Violation (12)Inspection (22)Objection (6)Special Inspection (30)
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
ERIC BERLENT
11/06/2025
Special inspection requirement — Final
ERIC BERLENT
11/06/2025
Special inspection requirement — Mechanical Systems
ERIC BERLENT
11/06/2025
Special inspection requirement — Metering
ERIC BERLENT
11/06/2025
Special inspection requirement — Shutoff dampers
ERIC BERLENT
11/06/2025
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
11/06/2025
Special inspection requirement — Duct leakage testing, insulation and design
ERIC BERLENT
11/06/2025
Special inspection requirement — Ventilation and air distribution system
ERIC BERLENT
11/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
ERIC BERLENT
11/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIC BERLENT
11/06/2025
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
11/06/2025
Special inspection requirement — Interior lighting power
ERIC BERLENT
11/06/2025
Special inspection requirement — Lighting controls
ERIC BERLENT
11/05/2025
Filed — Alteration
Mechanical application filed as per plan provided.
B01194667-P1
10/23/2025
Signed off — Alteration
B01194678-I1
07/30/2025
Signed off — Alteration
Plumbing application filed as per plan provided.
B01194673-I1
07/24/2025
Signed off — Alteration
Construction of full height, insulated, fire rated demising walls on level 1 within the existing warehouse (s-1) space. Construction of partial height fire rated egress stair vestibule including ceiling and light fixtures.
B01164908-I1
07/24/2025
Signed off — Alteration
Mechanical application filed as per plan provided.
B01167342-I1
07/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
ERIC BERLENT
07/24/2025
Special inspection requirement — Lighting controls
ERIC BERLENT
07/24/2025
Special inspection requirement — Interior lighting power
ERIC BERLENT
07/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
ERIC BERLENT
07/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
ERIC BERLENT
07/24/2025
Special inspection requirement — Metering
ERIC BERLENT
07/24/2025
Special inspection requirement — Mechanical Systems
ERIC BERLENT
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
07/24/2025
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
07/24/2025
Special inspection requirement — Final
ERIC BERLENT
07/24/2025
Special inspection requirement — Shutoff dampers
ERIC BERLENT
07/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIC BERLENT
07/24/2025
Special inspection requirement — Ventilation and air distribution system
ERIC BERLENT
07/23/2025
Signed off — Alteration
General construction application filed as per plan provided.
B01191700-I1
06/27/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/23/2025
Permit issued — Mechanical Systems
B01194667-I1-MS
05/23/2025
Permit issued — Sprinklers
B01194678-I1-EW-SP
05/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2025
Permit issued — Plumbing
B01194673-I1-PL
03/27/2025
Filed — Alteration
B01194678-I1
03/27/2025
Filed — Alteration
Plumbing application filed as per plan provided.
B01194673-I1
03/27/2025
Filed — Alteration
Mechanical application filed as per plan provided.
B01194667-I1
03/26/2025
Permit issued — General Construction
B01191700-I1-GC
03/23/2025
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
03/23/2025
Special inspection requirement — Final
ERIC BERLENT
03/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
03/21/2025
Filed — Alteration
General construction application filed as per plan provided.
B01191700-P1
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
03/20/2025
Filed — Alteration
General construction application filed as per plan provided.
B01191700-I1
02/28/2025
Permit issued — Mechanical Systems
B01167342-I1-MS
02/21/2025
Filed — Alteration
Mechanical application filed as per plan provided.
B01167342-I1
02/10/2025
Permit issued — General Construction
B01164908-I1-GC
01/28/2025
Filed — Alteration
Construction of full height, insulated, fire rated demising walls on level 1 within the existing warehouse (s-1) space. Construction of partial height fire rated egress stair vestibule including ceiling and light fixtures.
B01164908-I1
09/25/2024
Signed off — Alteration
HEREBY FILING INSTALLATION OF TEMPORARY TENT (40' X 80' X 8') AT FIRST FLOOR AS PER PLANS.
B01104029-I1
09/18/2024
Permit issued — General Construction
B01104029-I1-GC
09/17/2024
Signed off — Alteration
FILING FOR TEMPORARY FIRE STANDPIPE.
B00824402-I1
09/16/2024
Signed off — Alteration
Fuel Storage applciation filed in-conjunction with the new building application.
B00786886-I1
09/12/2024
Filed — Alteration
HEREBY FILING INSTALLATION OF TEMPORARY TENT (40' X 80' X 8') AT FIRST FLOOR AS PER PLANS.
B01104029-I1
09/12/2024
Filed — No Work
B01104067-P1
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedHunter Roberts Construction05/23/2025
DOB NOWSprinklersSigned-offStat Fire Sprinkler NYC05/23/2025
DOB NOWPlumbingSigned-offTT Mechanical04/14/2025
DOB NOWGeneral ConstructionSigned-offHunter Roberts Construction03/26/2025
DOB NOWMechanical SystemsSigned-offHunter Roberts Construction02/28/2025
DOB NOWGeneral ConstructionSigned-offHunter Roberts Construction02/10/2025
DOB NOWGeneral ConstructionSigned-offWinick Productions09/18/2024
DOB NOWMechanical SystemsSigned-offAabco Sheet Metal Co07/17/2024
DOB NOWCurb CutSigned-offHunter Roberts Construction07/02/2024
DOB NOWCurb CutSigned-offHunter Roberts Construction06/13/2024
DOB NOWSignSigned-offRed Hook Sign and Electric06/04/2024
DOB NOWStructuralSigned-offFM95NY06/04/2024
DOB NOWPlumbingSigned-offTT Mechanical05/23/2024
DOB NOWSprinklersSigned-offStat Fire Sprinkler NYC03/15/2024
DOB NOWStandpipeSigned-offStat Fire Sprinkler NYC03/07/2024
DOB NOWSupported ScaffoldSigned-offManhattan Constructors*02/23/2024
DOB NOWMechanical SystemsSigned-offAabco Sheet Metal Co01/26/2024
DOB NOWStructuralSigned-offHunter Roberts Construction01/24/2024
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction01/19/2024
DOB NOWFoundationPermit IssuedHunter Roberts Construction01/19/2024
DOB NOWStandpipeSigned-offStat Fire Sprinkler NYC01/16/2024
DOB NOWBoiler EquipmentSigned-offNew York Heating01/03/2024
DOB NOWPlumbingSigned-offTT Mechanical12/22/2023
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold12/04/2023
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction11/02/2023
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold09/26/2023
DOB NOWSupported ScaffoldSigned-offBayport Construction08/03/2023
DOB NOWPlumbingSigned-offTT Mechanical03/22/2023
DOB NOWStructuralSigned-offHunter Roberts Construction02/21/2023
DOB NOWSprinklersSigned-offStat Fire Sprinkler NYC02/15/2023
DOB NOWStandpipeSigned-offStat Fire Sprinkler NYC02/15/2023
DOB NOWPlumbingSigned-offTT Mechanical02/14/2023
DOB NOWStandpipeSigned-offStat Fire Sprinkler NYC02/11/2023
DOB NOWStructuralSigned-offHunter Roberts Construction02/07/2023
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction01/26/2023
DOB NOWSidewalk ShedSigned-offManhattan Constructors*01/25/2023
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold12/08/2022
DOB NOWFoundationPermit IssuedHunter Roberts Construction12/05/2022
DOB NOWFoundationPermit IssuedHunter Roberts Construction10/03/2022
DOB NOWFoundationPermit IssuedHunter Roberts Construction09/15/2022
+ 2 more permits on file
2 projects · most recent 11/05/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems Associated Ducts and Piping Generators
FiledStatusContractorScopeMake / Model / Capacity
11/05/2025Permit IssuedHunter Roberts ConstructionHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUZ-A12NKA7 24,600 BTU · Heat Pump Outdoor ×4
PUHY-EP120TNU-A1, service AC-1-5, AC-1-7, AC-1-8, AC-1-9 112,800 BTU · Vrf Outdoor ×2
PUZ-A36NKA7, service AC-1-6 36,900 BTU · Heat Pump Outdoor ×2
Heating
Reznor EGHB 7,000 BTU · Electric Heater ×4
Ventilation
Loren Cook 120SQN17D 555 CFM · Exhaust Fan ×4
135SQN17D 1,100 CFM · Exhaust Fan ×2
06/17/2024Signed-offAabco Sheet Metal CoAssociated Ducts and Piping, Generators, Heating and Air Conditioning Systems, Heating Systems
Heat / Cool
Mitsubishi Electric NTXMSM48A182AA 48,000 BTU · Vrf Outdoor ×2
TPEFYP096MH140A 96,000 BTU · Vrf Indoor ×2
TPKA0A0361KA70A 34,400 BTU · Heat Pump Outdoor ×2
TPLFYP048EM140B 54,000 BTU · Vrf Indoor ×2
TRUZA0361KA70NA 36,000 BTU · Heat Pump Outdoor ×2
TUHYP1684AN40AB 168,901 BTU · Vrf Outdoor ×1
Heating
Ouellet OASU20034AM-CV-DIS40-RT 68,000 CFM · Electric Heater ×17
OASU04077AM-CV-DIS40-RT 14,000 BTU · Electric Heater ×7
OASU03034AM-CV-DIS40-RT 10,000 BTU · Electric Heater ×6
OASU03077AM-CV-DIS40-RT 10,000 BTU · Electric Heater ×6
OASU02077AM-CV-DIS40-RT 7,000 BTU · Electric Heater ×5
OASU07534AM-CV-DIS40-RT 26,000 BTU · Electric Heater ×2
OCAU04077BLD1-DIS40-FIW-RT-TAV Electric Heater ×1
ODSRU05077BL-DIS40-RT-TAV Electric Heater ×1
Ventilation
Twin City Fan WPB-42B304 23,000 CFM · Exhaust Fan ×9
WPB-54C3 37,500 CFM · Exhaust Fan ×6
BCV-SW 8,000 CFM · Exhaust Fan ×3
DSI-080AE 280 CFM · Exhaust Fan ×3
DSI-120A 900 CFM · Exhaust Fan ×3
BSI-210A 5,400 CFM · Exhaust Fan ×1
TD-24-B-5-14 4,800 CFM · Exhaust Fan ×1
TD-24-B-5-17 5,703 CFM · Exhaust Fan ×1
TD-30-E-8-29 11,315 CFM · Exhaust Fan ×1
Aaon RN-011-3-0-H60E-17A 3,000 CFM · Erv ×2
__Junk__ RN-018-3-0-H60E-19A 410,000 BTU · Erv ×2
Generators
Kinsley 550REOZVB, 300 Gallon 550 kW · Generator ×1
Ducts & Piping
__Junk__ Associated ducts and piping 1 BTU · Ductwork ×1
1 project · most recent 06/17/2024
Storm Water/Sanitary
FiledStatusContractorScope
06/17/2024Signed-offTT MechanicalStorm, Water/Sanitary
7 projects · most recent 02/11/2025
General Wiring
FiledStatusContractorScope
02/11/2025CompleteTeam ElectricGeneral Wiring
10/30/2024CompleteTeam ElectricGeneral Wiring
06/15/2023CompleteJam Electrical—
06/15/2023CompleteJam Electrical—
06/15/2023CompleteJam Electrical—
04/05/2023CompleteTeam ElectricGeneral Wiring
02/02/2023CompleteTeam ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/13/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/08/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
06/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/04/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/20/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/31/2023Pass-Final PL - UndergroundPassView ↗
03/13/2023Pass-Final PL - UndergroundPassView ↗
03/02/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
11/06/2025Lighting controlsERIC BERLENTenergy_progress
11/06/2025Shutoff dampersERIC BERLENTenergy_progress
11/06/2025HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
11/06/2025Mechanical SystemsERIC BERLENTspecial
11/06/2025Post-installed AnchorsERIC BERLENTspecial
11/06/2025FinalERIC BERLENTprogress
11/06/2025Energy Code Compliance InspectionsERIC BERLENTprogress
11/06/2025HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
11/06/2025Ventilation and air distribution systemERIC BERLENTenergy_progress
11/06/2025HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
11/06/2025MeteringERIC BERLENTenergy_progress
11/06/2025Interior lighting powerERIC BERLENTenergy_progress
11/06/2025Duct leakage testing, insulation and designERIC BERLENTenergy_progress
07/24/2025Duct leakage testing, insulation and designERIC BERLENTenergy_progress
07/24/2025Interior lighting powerERIC BERLENTenergy_progress
07/24/2025HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
07/24/2025Lighting controlsERIC BERLENTenergy_progress
07/24/2025Ventilation and air distribution systemERIC BERLENTenergy_progress
07/24/2025HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
07/24/2025Shutoff dampersERIC BERLENTenergy_progress
07/24/2025HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
07/24/2025MeteringERIC BERLENTenergy_progress
07/24/2025FinalERIC BERLENTprogress
07/24/2025Energy Code Compliance InspectionsERIC BERLENTprogress
07/24/2025Post-installed AnchorsERIC BERLENTspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
ConEdOfficeFloor 1
Project B01167342 Alteration · LOC Issued · 02/21/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 263 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch42
08/29/2026B00774052-I1Request digital key ↗
08/28/2026B00766779-I1Request digital key ↗
08/28/2026B00796432-I1Request digital key ↗
Showing 3 of 42 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/24/2026B01104067-P1Request digital key ↗
08/24/2026B01104067-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
02/20/2024340854230Open ↗
08/10/2022340854230Open ↗
08/05/2022340854230Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
11/06/2023340854230Open ↗
06/16/2022340854230Open ↗
▸DOB NOWDEP Stormwater Construction Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00703468-P7Open ↗
08/13/2026B00703468-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00703468-A3Open ↗
08/13/2026B00703468-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications140
▸DOB NOWProgress Inspector Seal & Signature56
09/22/2026B00703468-S4Open ↗
09/22/2026B00703468-S4Open ↗
09/02/2026B01104029-I1Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature45
08/29/2026B00774052-I1Open ↗
08/28/2026B00786886-I1Open ↗
08/27/2026B00808021-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/23/2026B00786886-I1Open ↗
09/22/2026B00703468-S4Open ↗
09/02/2026B01194673-I1Open ↗
Showing 3 of 38 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/16/2022340854230Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStandpipe Alarms Drawings2
08/25/2026B00703468-I1—
08/25/2026B00703468-S8—
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/25/2026B00703468-P7Open ↗
08/25/2026B00703468-P2Open ↗
08/25/2026B00703468-S8Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
08/05/2022340854230Open ↗
06/16/2022340854230Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
06/16/2022340854230Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00703468-S8Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸DOB NOWTR5 Test Report3
08/13/2026B00826613-I1Open ↗
08/13/2026B00703468-S2Open ↗
Showing 2 of 3 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/06/2023340854230Open ↗
05/12/2023340854230Open ↗
08/05/2022340854230Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
06/16/2022340854230Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION4
11/06/2023340854230Open ↗
11/06/2023340854230Open ↗
05/12/2023340854230Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAI1 Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/16/2022340854230Open ↗
▸Other Documents30
▸DOB NOWFlood Plan Emergency Temporary Flood Shields6
08/25/2026B00703468-P7Open ↗
08/25/2026B00703468-I1Open ↗
08/25/2026B00703468-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/25/2026B00703468-P7Open ↗
08/25/2026B00703468-P1Open ↗
08/25/2026B00703468-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)4
08/13/2026B00703468-S1Open ↗
08/13/2026B00703468-I1Open ↗
08/13/2026B00703468-S8Open ↗
Showing 3 of 4 on file for this type
▸BISNYS DEC TIDAL WETLANDS MAP1
06/16/2022340854230Open ↗
▸BISPLOT DIAGRAM1
06/16/2022340854230Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/06/2023340854230Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSurvey1
08/13/2026B00766779-I1Open ↗