← Back
Three families
683 PARK AVENUE
BROOKLYN · BIN 3048379
💬 Discuss this project
1931Year Built
3Stories
C0Building Class
R6BZoning
3,750 sfGross Floor Area
3Units
6 Open Violations 2 unresolved · 4 paperwork only ▸FDNY Report ↗
Three families · Owner of record: 683 PARK LLC · 2,125 sf lot · 1.76 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 2 filings · 20 docs
Penthouse1p · 1 filing · 20 docs
Floor 3Under Construction6p · 1 filing · 11 docs
Floor 2Under Construction7p · 2 filings · 20 docs
Floor 1Under Construction7p · 1 filing · 11 docs
Cellar1p · 1 filing · 20 docs
Sub-BasementUnder Construction6p · 1 filing · 11 docs
1 job · most recent 05/08/2026
General Wiring
FiledStatusContractorScope
05/08/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
Building Lifecycle
All (26)Filed (3)Permit Issued (1)Violation (14)Special Inspection (8)
06/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NORMAN LOK
06/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
06/26/2026
Special inspection requirement — Final
ADITYA DESAI
06/23/2026
Filed — Alteration
HEREWITH FILING FOR CONSTRUCTION OF FRAMED ROOF BULKHEAD. FILING TO REPAIR ALL DAMAGED SURFACES IN EXISTING STAIRWELL. FILING FOR INSTALLATION OF 42"H METAL FENCE AT ROOF PERIMETER TO ADDRESS STOP WORK ORDER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214119-P2
04/14/2026
Permit issued — General Construction
B01214119-I1-GC
12/12/2025
Violation issued (ECB, closed)
Construction
12/12/2025
Violation issued (ECB, closed)
Construction
12/12/2025
Violation issued (ECB, open)
Construction
12/12/2025
Violation issued (ECB, open)
Construction
12/12/2025
Violation issued (ECB, closed)
Construction
12/12/2025
Violation issued (ECB, closed)
Construction
10/20/2025
Filed — Alteration
HEREWITH FILING FOR CONSTRUCTION OF FRAMED ROOF BULKHEAD. FILING TO REPAIR ALL DAMAGED SURFACES IN EXISTING STAIRWELL. FILING FOR INSTALLATION OF 42"H METAL FENCE AT ROOF PERIMETER TO ADDRESS STOP WORK ORDER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214119-P1
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/30/2025
Special inspection requirement — Final
06/25/2025
Violation issued (ECB, open)
Construction
06/25/2025
Violation issued (ECB, closed)
Construction
06/25/2025
Violation issued (ECB, open)
Construction
06/25/2025
Violation issued (ECB, open)
Construction
06/25/2025
Violation issued (ECB, open)
Unknown
04/23/2025
Filed — Alteration
HEREWITH FILING FOR CONSTRUCTION OF FRAMED ROOF BULKHEAD. FILING TO REPAIR ALL DAMAGED SURFACES IN EXISTING STAIRWELL. FILING FOR INSTALLATION OF 42"H METAL FENCE AT ROOF PERIMETER TO ADDRESS STOP WORK ORDER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214119-I1
03/13/2025
Violation issued (ECB, closed)
Construction
07/17/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/17/1998
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
683 PARK LLC1303/22/2026
NY/ENTERPRISE CITYHOME103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/25/2024$1.5M—Private party → Private party$400/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE306/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EZFILINGNYCORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EDMUND S. JOSEPHGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818206/23/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEDMUND S. JOSEPH04/14/2026
BISEQISSUEDCREST CONTRACTING INC02/02/1998
BIS—ISSUEDCREST CONTRACTING INC12/02/1997
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/26/2026Tenant Protection Plan ComplianceNORMAN LOKspecial
06/26/2026Fire-Resistant Penetrations and JointsNORMAN LOKspecial
06/26/2026Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
06/26/2026FinalADITYA DESAIprogress
09/30/2025Fire-Resistant Penetrations and Joints—special
09/30/2025Structural Stability – Alterations of existing buildings—special
09/30/2025Tenant Protection Plan Compliance—special
09/30/2025Final—progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01214119-P2Request digital key ↗
08/21/2026B01214119-I1Request digital key ↗
08/15/2026B01214119-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01214119-P2Open ↗
08/21/2026B01214119-I1Open ↗
08/21/2026B01214119-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B01214119-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01214119-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01214119-I1Open ↗
08/21/2026B01214119-P2Open ↗
08/15/2026B01214119-P1Open ↗