4 Active Violations ▸FDNY Report ↗
Two family brick · 2,300 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 13p · 1 filing · 20 docs
Basement4p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/23/2021$920K—— → —$558/sf building
12/02/2020$350K—— → —$212/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA Building & Inspection Service509/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dmconsulting6860603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JH CrewGeneral Contractor104/09/2026
SB Renovation & ModelingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519509/09/2026
Building Lifecycle
All (63)Filed (5)Permit Issued (2)Signed Off (1)Violation (6)Inspection (5)Objection (26)Special Inspection (18)
10/05/2026
Objection resolved — Resolved
10/05/2026
Objection resolved — Resolved
09/18/2026
Objection raised — Other
09/18/2026
Objection raised — Other
09/09/2026
Filed — Alteration CO
HEREWITH FILE ALTERATION SUBSEQUENT TO GC APPLICATION B00845062-I1 TO INSTALL 1 NEW A/C UNIT IN PROPOSED BEDROOM IN BASEMENT LEVEL AS PER PLANS FILED.
B00845062-P3
09/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
09/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/09/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
04/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/30/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
03/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/18/2026
Filed — Alteration CO
HEREWITH FILE ALTERATION SUBSEQUENT TO GC APPLICATION B00845062-I1 TO INSTALL 1 NEW A/C UNIT IN PROPOSED BEDROOM IN BASEMENT LEVEL AS PER PLANS FILED.
B00845062-P2
03/18/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
03/11/2026
Signed off — Alteration CO
HEREWITH FILE ALTERATION SUBSEQUENT TO GC APPLICATION B00845062-I1 TO INSTALL 1 NEW A/C UNIT IN PROPOSED BEDROOM IN BASEMENT LEVEL AS PER PLANS FILED.
B00845062-S1
03/10/2026
Permit issued — Mechanical Systems
B00845062-S1-MS
02/06/2026
Objection resolved — Addressed
02/06/2026
Objection resolved — Addressed
01/23/2026
Objection raised — Admin
01/23/2026
Objection resolved — Addressed
01/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/08/2026
Objection raised — Mechanical
01/08/2026
Objection raised — Mechanical
01/08/2026
Objection raised — Plumbing
01/08/2026
Objection raised — Mechanical
01/08/2026
Objection raised — Mechanical
01/08/2026
Objection raised — Scope
12/29/2025
Inspection — No Access-Final CND-Occupancy Inspection
No Access
View inspection ↗
12/23/2025
Objection resolved — Addressed
02/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
02/19/2025
Objection raised — Energy
02/19/2025
Objection raised — Structural
02/19/2025
Objection raised — Plumbing
02/19/2025
Objection resolved — Addressed
02/11/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION SUBSEQUENT TO GC APPLICATION B00845062-I1 TO INSTALL 1 NEW A/C UNIT IN PROPOSED BEDROOM IN BASEMENT LEVEL AS PER PLANS FILED.
B00845062-S1
02/11/2025
Special inspection requirement — Final
NAVEEN KUMAR
02/11/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
02/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
02/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
02/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
11/15/2024
Objection raised — Admin
11/05/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION SUBSEQUENT TO GC APPLICATION B00845062-I1 TO INSTALL 1 NEW A/C UNIT IN PROPOSED BEDROOM IN BASEMENT LEVEL AS PER PLANS FILED.
B00845062-P1
04/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/16/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
04/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/04/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/31/2023
Permit issued — General Construction
B00845062-I1-GC
03/16/2023
Filed — Alteration CO
HEREWITH FILE ALTERATION SUBSEQUENT TO GC APPLICATION B00845062-I1 TO INSTALL 1 NEW A/C UNIT IN PROPOSED BEDROOM IN BASEMENT LEVEL AS PER PLANS FILED.
B00845062-I1
04/26/2022
Violation issued (HPD, open)
I
04/20/2022
Violation issued (HPD, closed)
C
04/13/2022
Violation issued (HPD, open)
I
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJH Crew03/10/2026
DOB NOWGeneral ConstructionPermit IssuedSB Renovation & Modeling03/31/2023
BISOTISSUEDPro Custom Solar09/30/2021
1 project · most recent 09/09/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/09/2026Signed-offJH CrewAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×2
Heating
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×2
Ventilation
Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×2
3 projects · most recent 08/10/2026
General Wiring
FiledStatusContractorScope
08/10/2026CompleteSupreme Electric2 meters, 1 new_meters
10/06/2021CompleteIsland Electric—
01/22/2021CompleteSupreme ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/29/2025No Access-Final CND-Occupancy InspectionNo AccessView ↗
04/04/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
09/09/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
09/09/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/09/2026Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
03/30/2026Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
03/30/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
03/30/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/18/2026Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
03/18/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/18/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
02/25/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
02/11/2025FinalNAVEEN KUMARprogress
02/11/2025Mechanical SystemsYounes Abouyaalaspecial
02/11/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
02/11/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
02/11/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/16/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/16/2023Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
04/16/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026B00845062-I1Request digital key ↗
08/17/2026B00845062-S1Request digital key ↗
08/17/2026B00845062-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
03/07/2024340823185Open ↗
01/08/2024340823185Open ↗
01/11/2022340823185Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/13/2024340823185Open ↗
03/13/2024340823185Open ↗
▸BISWORK PERMIT APPLICATION1
09/30/2021340823185Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00845062-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature14
10/06/2026B00845062-P3Open ↗
10/06/2026B00845062-P3Open ↗
10/06/2026B00845062-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
10/06/2026B00845062-P3Open ↗
08/17/2026B00845062-P2Open ↗
08/17/2026B00845062-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00845062-S1Open ↗
08/27/2026B00845062-S1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/30/2021340823185Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2021340823185Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
10/06/2026B00845062-P3Open ↗
08/13/2026B00845062-P1Open ↗
08/13/2026B00845062-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
09/30/2021340823185Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
10/06/2026B00845062-P3Open ↗
08/17/2026B00845062-S1Open ↗
08/17/2026B00845062-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/29/2021340823185Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/08/2024340823185Open ↗
03/04/2024340823185Open ↗
03/01/2024340823185Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/04/2024340823185Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/30/2021340823185Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/08/2024340823185Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/08/2024340823185Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/30/2021340823185Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/08/2024340823185Open ↗
03/04/2024340823185Open ↗
03/01/2024340823185Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/21/2024340823185Open ↗
03/13/2024340823185Open ↗
03/13/2024340823185Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/13/2024340823185Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
03/08/2024340823185Open ↗
09/30/2021340823185Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/08/2024340823185Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
01/23/2024340823185Open ↗
05/23/2022340823185Open ↗
02/25/2022340823185Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/29/2021340823185Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
10/06/2026B00845062-P3Open ↗
08/17/2026B00845062-P2Open ↗
08/17/2026B00845062-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00845062-I1Open ↗