← Back
BuildNYC
Public elementary, junior or senior high
P.S. 135 Sheldon A. Brookner
684 LINDEN BOULEVARD · BIN 3102005
💬 Discuss this project
1931Year Built
5Stories
W1Building Class
R5Zoning
54,375 sfGross Floor Area
1Units
LL97 Covered4 Active Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 64,000 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2P.S. 135 Sheldon A. Brookner1 filing · 8 docs
Floor 1P.S. 135 Sheldon A. Brookner2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority6810/13/2026
NYC Department of Education303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Koysman Engineering108/07/2026
Samy Abouzid Engineering103/11/2026
Stephen B Jacobs Group103/04/2026
Eme Consulting Engineering Group108/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Stephen B Jacobs Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S ElectricElectrical103/22/2026
Candela Systems Corp DbaElectrical103/22/2026
A & S ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351108/25/2023
Building Lifecycle
All (78)Filed (5)Violation (60)Objection (4)Special Inspection (9)
08/13/2026
Objection raised — Other
08/07/2026
Filed — Alteration
REMOVE & DISPOSE: EX. DBL CLF GATES, ASPHALT PAV AND BASE TO A DEPTH OF 1'-6" BELOW FG DISPOSE OF LEGALLY OFF SITE. IMPROVEMENTS: NEW ASPHALT, PERMEABLE PAVERS W/ TREE PITS AND TREE PLANTING, FLUSH CC, 15'-0" HT. CLF DOUBLE GATES, PLAY EQ. W/ SAFETY SURFA
B01366001-S3
08/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/06/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
04/18/2026
Objection raised — Other
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
03/31/2026
Filed — Alteration
REMOVE & DISPOSE: EX. DBL CLF GATES, ASPHALT PAV AND BASE TO A DEPTH OF 1'-6" BELOW FG DISPOSE OF LEGALLY OFF SITE. IMPROVEMENTS: NEW ASPHALT, PERMEABLE PAVERS W/ TREE PITS AND TREE PLANTING, FLUSH CC, 15'-0" HT. CLF DOUBLE GATES, PLAY EQ. W/ SAFETY SURFA
B01366001-S2
03/25/2026
Special inspection requirement — Final
03/18/2026
Objection raised — Other
03/18/2026
Objection raised — Other
03/11/2026
Filed — Alteration
REMOVE & DISPOSE: EX. DBL CLF GATES, ASPHALT PAV AND BASE TO A DEPTH OF 1'-6" BELOW FG DISPOSE OF LEGALLY OFF SITE. IMPROVEMENTS: NEW ASPHALT, PERMEABLE PAVERS W/ TREE PITS AND TREE PLANTING, FLUSH CC, 15'-0" HT. CLF DOUBLE GATES, PLAY EQ. W/ SAFETY SURFA
B01366001-S1
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/04/2026
Filed — Alteration
REMOVE & DISPOSE: EX. DBL CLF GATES, ASPHALT PAV AND BASE TO A DEPTH OF 1'-6" BELOW FG DISPOSE OF LEGALLY OFF SITE. IMPROVEMENTS: NEW ASPHALT, PERMEABLE PAVERS W/ TREE PITS AND TREE PLANTING, FLUSH CC, 15'-0" HT. CLF DOUBLE GATES, PLAY EQ. W/ SAFETY SURFA
B01366001-I1
02/09/2026
Violation issued (FDNY_NOV, closed)
11/17/2025
Violation issued (FDNY_ORDER, closed)
11/17/2025
Violation issued (FDNY_NOV, closed)
08/19/2025
Violation issued (FDNY_ORDER, closed)
11/22/2024
Violation issued (FDNY_ORDER, closed)
11/22/2024
Violation issued (FDNY_ORDER, closed)
03/15/2024
Violation issued (ECB, closed)
Construction
09/08/2023
Violation issued (FDNY_NOV, closed)
09/08/2023
Violation issued (FDNY_NOV, closed)
08/25/2023
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEMS FOR THE SECOND FLOOR AUDITORIUM.
B00924634-I1
08/24/2023
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/24/2023
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/24/2023
Special inspection requirement — Final
Asma Hashmi
03/10/2023
Violation issued (ECB, closed)
Construction
03/10/2023
Violation issued (ECB, closed)
Construction
05/05/2022
Violation issued (ECB, closed)
Construction
05/05/2022
Violation issued (ECB, closed)
Construction
05/05/2022
Violation issued (ECB, closed)
Construction
11/30/2021
Violation issued (FDNY_NOV, closed)
08/11/2021
Violation issued (ECB, closed)
Site Safety
08/11/2021
Violation issued (ECB, closed)
Construction
08/11/2021
Violation issued (ECB, closed)
Construction
08/11/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Violation issued (ECB, closed)
Construction
06/01/2020
Violation issued (ECB, closed)
Construction
06/01/2020
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/06/2018
Violation issued (ECB, closed)
Construction
06/20/2017
Violation issued (ECB, closed)
Construction
11/14/2016
Violation issued (ECB, closed)
Construction
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDJ & N Construction Group08/03/2022
BISOTISSUEDJ & N Construction Group08/03/2022
BISOTISSUEDJ & N Construction Group08/03/2022
BISPLISSUEDFranco Belli PLMG & Heating Son02/24/2022
BISEQISSUEDJ & N Construction Group12/08/2021
BISMHISSUEDKW Tech08/10/2021
BISOTISSUEDJ & N Construction Group08/05/2021
BISMHRE-ISSUEDKW Tech08/05/2021
BISOTISSUEDJ & N Construction Group08/05/2021
BISOTISSUEDJ & N Construction Group08/05/2021
BISOTISSUEDJ & N Construction Group08/03/2021
BISPLISSUEDFranco Belli PLMG & Heating Son02/26/2021
BISOTISSUEDJ & N Construction Group12/18/2020
BISOTISSUEDJ & N Construction Group12/18/2020
BISOTISSUEDJ & N Construction Group12/18/2020
BISOTISSUEDJ & N Construction Group12/18/2020
BISEQISSUEDJ & N Construction Group12/18/2020
BISEQISSUEDJ & N Construction Group12/18/2020
BISMHISSUEDKW Tech12/08/2020
BISEQISSUEDJ & N Construction Group11/25/2020
BISMHISSUEDKW Tech02/26/2020
BISPLISSUEDFranco Belli PLMG & Heating Son02/26/2020
BISOTISSUEDJ & N Construction Group02/26/2020
BISOTISSUEDJ & N Construction Group02/26/2020
BISOTISSUEDJ & N Construction Group02/26/2020
BISOTISSUEDJ & N Construction Group02/05/2020
BISEQISSUEDJ & N Construction Group01/08/2020
BISEQISSUEDJ & N Construction Group12/27/2019
BISEQISSUEDJ & N Construction Group12/06/2019
BISEQISSUEDAbax07/10/2018
BISEQISSUEDAbax06/22/2018
BISPLISSUEDAtlantis Plumbing & Heating08/11/2015
BISOTISSUEDCM&E Con12/11/2013
BISOTISSUEDCM&E Con12/11/2013
BISPLISSUEDAtlantis Plumbing & Heating12/03/2013
BISPLISSUEDForsythe P&H03/22/2013
BISOTISSUEDCM&E Con03/22/2013
BISOTISSUEDCM&E Con03/22/2013
BISEQISSUEDCM&E Con01/10/2013
BISPLISSUEDMar-Sal Plumbing & Heating03/26/2012
+ 10 more permits on file
1 project · most recent 08/25/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2023——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUB36TLAV1 34,000 BTU · Split System ×8
AOU120RLAVL 120,000 BTU · Condensing Unit ×2
1 project · most recent 08/07/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/07/2026——Storm, Water/Sanitary
12 projects · most recent 08/05/2026
General Wiring Lighting
FiledStatusContractorScope
08/05/2026Permit IssuedSteel City Electrical ConGeneral Wiring
04/20/2026Permit IssuedAnco Electl ContctngGeneral Wiring
11/19/2024CompleteCandela Systems Corp DbaLighting
04/05/2024CompleteGemini Electric Co—
10/16/2023CompleteAnco Electl Contctng—
08/02/2023Permit IssuedA & S ElectricGeneral Wiring
06/26/2023CompleteI.S.M. Electric—
01/12/2023CompleteCharan Electrical Enterp'sGeneral Wiring
11/27/2019CompleteI.S.M. Electric—
05/29/2018CompleteCharan Electrical Enterp's—
05/23/2018CompleteCharan Electrical Enterp'sGeneral Wiring
02/22/2018Permit IssuedStanco System Electrical Cont—
1 project · most recent 08/07/2026
FiledStatusContractorScope
08/07/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/06/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
03/25/2026Final—progress
03/11/2026Fire-Resistant Penetrations and Joints—special
08/24/2023Mechanical SystemsAsma Hashmispecial
08/24/2023Energy Code Compliance InspectionsAsma Hashmiprogress
08/24/2023Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/24/2023Post-installed AnchorsAsma Hashmispecial
08/24/2023FinalAsma Hashmiprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 135 Sheldon A. BrooknerEducationFloors 1, 2
Project B01366001 Alteration · Objections · 03/04/2026
Project B00924634 Alteration · Approved · 08/25/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026B00924634-I1Request digital key ↗
08/18/2026B01366001-I1Request digital key ↗
08/18/2026B01366001-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/09/2009310311230Open ↗
▸BISWORK PERMIT APPLICATION1
03/24/2009310311230Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B00924634-I1Open ↗
08/18/2026B01366001-I1Open ↗
08/18/2026B01366001-S3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00924634-I1Open ↗
08/28/2026B00924634-I1Open ↗
08/28/2026B00924634-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/07/2009310311230Open ↗
03/09/2009310311230Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00924634-I1Open ↗
08/28/2026B00924634-I1Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/09/2009310311230Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/18/2026B01366001-S3Open ↗
08/13/2026B00924634-I1Open ↗
08/13/2026B01366001-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/18/2026B01366001-S3Open ↗
08/13/2026B01366001-S1Open ↗
08/13/2026B01366001-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/15/2026B01366001-S2Open ↗
08/13/2026B01366001-S1Open ↗
08/13/2026B01366001-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/07/2009310311230Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/09/2009310311230Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/07/2009310311230Open ↗
03/09/2009310311230Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/09/2009310311230Open ↗
▸Other Documents4
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal4
08/18/2026B01366001-S3Open ↗
08/13/2026B01366001-S1Open ↗
08/13/2026B01366001-I1Open ↗
Showing 3 of 4 on file for this type