← Back
One story retail building
684 SENECA AVENUE
QUEENS · BIN 4440648
💬 Discuss this project
1930Year Built
1Stories
K1Building Class
R6BZoning
10,401 sfGross Floor Area
27Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: GOLDEN CHOI REALLY CORP · 14,482 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof2p · 1 filing · 12 docs
Floor 18p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOLDEN CHOI REALTY103/21/2026
GOLDEN CHOI REALTY GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE L. PENA,P.E.711/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST MECHANICAL SVCS INCPlumbing207/08/2026
B Y CONSTRUCTION CORPGeneral Contractor107/08/2026
CJ HEATING & MECHANICAL CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE L. PENA, P.E5969711/04/2022
Building Lifecycle
All (20)Filed (7)Permit Issued (4)Violation (1)Special Inspection (8)
04/28/2025
Violation issued (FDNY_NOV, closed)
01/30/2024
Permit issued — Plumbing
Q00403268-I1-PL
11/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
11/04/2022
Filed — Alteration
Application file to propose new kitchen hood and HVAC system
Q00407859-P1
11/04/2022
Special inspection requirement — Mechanical Systems
Jose Pena
11/04/2022
Special inspection requirement — Final
Jose Pena
11/03/2022
Filed — Alteration
install new kitchen equipment ( 2 gas range, 1 salamander, 3 deep fryer, 1 flat grill, 1 steam table, 1 fire suppression shut off valve) Cap and remove 2 pc bath. new 2 pc bath, new 3 non residential sink and 4 floor drain
Q00403268-P4
11/01/2022
Special inspection requirement — Final
Jose Pena
11/01/2022
Special inspection requirement — Mechanical Systems
Jose Pena
01/28/2022
Filed — Alteration
install new kitchen equipment ( 2 gas range, 1 salamander, 3 deep fryer, 1 flat grill, 1 steam table, 1 fire suppression shut off valve) Cap and remove 2 pc bath. new 2 pc bath, new 3 non residential sink and 4 floor drain
Q00403268-P3
01/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
09/02/2021
Permit issued — Mechanical Systems
Q00407859-I1-MS
08/31/2021
Filed — Alteration
install new kitchen equipment ( 2 gas range, 1 salamander, 3 deep fryer, 1 flat grill, 1 steam table, 1 fire suppression shut off valve) Cap and remove 2 pc bath. new 2 pc bath, new 3 non residential sink and 4 floor drain
Q00403268-P2
08/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
07/19/2021
Filed — Alteration
Application file to propose new kitchen hood and HVAC system
Q00407859-I1
07/08/2021
Filed — Alteration
install new kitchen equipment ( 2 gas range, 1 salamander, 3 deep fryer, 1 flat grill, 1 steam table, 1 fire suppression shut off valve) Cap and remove 2 pc bath. new 2 pc bath, new 3 non residential sink and 4 floor drain
Q00403268-P1
06/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
04/25/2021
Permit issued — Plumbing
Q00403268-I1-PL
01/28/2021
Permit issued — Plumbing
Q00403268-I1-PL
01/21/2021
Filed — Alteration
install new kitchen equipment ( 2 gas range, 1 salamander, 3 deep fryer, 1 flat grill, 1 steam table, 1 fire suppression shut off valve) Cap and remove 2 pc bath. new 2 pc bath, new 3 non residential sink and 4 floor drain
Q00403268-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCJ HEATING & MECHANICAL C01/30/2024
DOB NOWMechanical SystemsPermit IssuedB Y CONSTRUCTION CORP09/02/2021
DOB NOWPlumbingPermit IssuedBEST MECHANICAL SVCS INC04/25/2021
DOB NOWPlumbingPermit IssuedBEST MECHANICAL SVCS INC01/28/2021
BISOTISSUEDB Y CONSTRUCTION CORP10/28/2020
BISOTISSUEDSIGN MASTER USA INC04/27/2018
BISOTISSUEDXINLI.CONSTRUCTION LLC10/14/2016
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM10/17/2000
BISPLISSUEDTRUE NORTH MECHANICAL LLC06/16/1993
BISMHISSUEDJT. T MECHANCAL CONTRACTING06/16/1993
BISOTISSUEDJ.T.&T. MECHANICAL CONTRACTORS02/24/1993
BISFPISSUEDMASTER FIRE PREVENTION10/17/1989
BISMHISSUEDW C L CONSTRUCTION09/19/1989
1 project · most recent 11/04/2022
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/04/2022Permit IssuedB Y CONSTRUCTION CORPAir Conditioning Systems, Ventilation Systems
Cooling
Coleman ZXG14E2B3AA1A111A2 220,000 BTU ×2
Heating
Coleman ZXG14E2B3AA1A111A2 220,000 BTU ×2
Ventilation
Twin City Fan MODEL#BCV-SW 78,660 CFM · Exhaust Fan ×2
1 project · most recent 11/03/2022
Gas Water/Sanitary
FiledStatusContractorScope
11/03/2022Permit IssuedCJ HEATING & MECHANICAL CGas, Water/Sanitary
2 projects · most recent 12/25/2022
General Wiring
FiledStatusContractorScope
12/25/2022Permit IssuedRM ELECTRIC CO., INC.General Wiring
05/08/2018Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/17/2022Fire-Resistant Penetrations and JointsJose Penaspecial
11/04/2022Mechanical SystemsJose Penaspecial
11/04/2022FinalJose Penaprogress
11/01/2022FinalJose Penaprogress
11/01/2022Mechanical SystemsJose Penaspecial
01/28/2022Fire-Resistant Penetrations and JointsJose Penaspecial
08/12/2021Fire-Resistant Penetrations and JointsJose Penaspecial
06/29/2021Fire-Resistant Penetrations and JointsJose Penaspecial
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Plumbing5
08/26/2026Q00403268-P4Request digital key ↗
08/26/2026Q00403268-P3Request digital key ↗
08/26/2026Q00403268-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026Q00407859-I1Request digital key ↗
08/25/2026Q00407859-P1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
11/25/2022440634137Open ↗
11/22/2022440634137Open ↗
10/07/2020440634137Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
06/23/2021440634137Open ↗
10/28/2020440634137Open ↗
05/08/2018421625691Open ↗
Showing 3 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/22/2019421625691Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00403268-P3Open ↗
08/26/2026Q00403268-P2Open ↗
08/26/2026Q00403268-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00403268-I1Open ↗
08/30/2026Q00403268-P3Open ↗
08/25/2026Q00403268-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/08/2018421625691Open ↗
10/18/2016421387902Open ↗
10/18/2016421387902Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/08/2018421625691Open ↗
10/18/2016421387902Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/07/2020440634137Open ↗
05/08/2018421625691Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q00407859-I1Open ↗
08/23/2026Q00407859-P1Open ↗
▸BISProfessional and Owner Certification (POC3)1
10/18/2016421387902Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/07/2020440634137Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/07/2020440634137Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
09/17/2008410166387Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026Q00403268-P1Open ↗
08/26/2026Q00403268-P3Open ↗
08/26/2026Q00403268-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/17/2008410166387Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/07/2020440634137Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/07/2020440634137Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/07/2020440634137Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00407859-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/07/2020440634137Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/22/2019421625691Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/17/2008410166387Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/17/2008410166387Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
10/07/2020440634137Open ↗
01/22/2019421625691Open ↗
05/08/2018421625691Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
05/08/2018421625691Open ↗
10/18/2016421387902Open ↗
09/17/2008410166387Open ↗
▸BISBOROUGH INTAKE FORM1
06/23/2021440634137Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/07/2020440634137Open ↗
▸BISADDITIONAL INFORMATION1
11/25/2022440634137Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
09/17/2008410166387Open ↗