← Back
Two family frame
6844 AMBOY ROAD
STATEN ISLAND · Tottenville-Charleston · BIN 5105085
💬 Discuss this project
1915Year Built
2Stories
B2Building Class
PARKZoning
3,923 sfGross Floor Area
2Units
Two family frame · Owner of record: EPX LLC · 47,922 sf lot · 0.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC507/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ CONSTRUCTION GROUP INCGeneral Contractor303/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449507/06/2023
Building Lifecycle
All (17)Filed (5)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (4)
10/15/2024
Signed off — Alteration
Propose plumbing work for existing residential building as per plan. No change in use, egress, or occupancy.
S00840323-I1
09/13/2023
Signed off — Alteration
Propose interior renovation for existing residential building with new partition work and floor finish as per plan. No change in use, egress or occupancy.
S00840312-I1
09/12/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/06/2023
Filed — Alteration
Propose plumbing work for existing residential building as per plan. No change in use, egress, or occupancy.
S00840323-P2
07/06/2023
Filed — Alteration
Propose interior renovation for existing residential building with new partition work and floor finish as per plan. No change in use, egress or occupancy.
S00840312-P1
07/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/06/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
05/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/03/2023
Filed — Alteration
Propose plumbing work for existing residential building as per plan. No change in use, egress, or occupancy.
S00840323-P1
05/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
05/02/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
04/12/2023
Permit issued — Plumbing
S00840323-I1-PL
04/08/2023
Permit issued — General Construction
S00840312-I1-GC
03/28/2023
Filed — Alteration
Propose plumbing work for existing residential building as per plan. No change in use, egress, or occupancy.
S00840323-I1
03/27/2023
Filed — Alteration
Propose interior renovation for existing residential building with new partition work and floor finish as per plan. No change in use, egress or occupancy.
S00840312-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC04/12/2023
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC04/08/2023
1 project · most recent 04/17/2023
General Wiring
FiledStatusContractorScope
04/17/2023CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/12/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/06/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/06/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
05/02/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
05/02/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00840323-P1Request digital key ↗
08/23/2026S00840323-I1Request digital key ↗
08/23/2026S00840323-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00840323-I1Open ↗
08/23/2026S00840323-P2Open ↗
08/23/2026S00840323-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026S00840323-P1Open ↗
08/28/2026S00840323-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026S00840323-P1Open ↗
08/28/2026S00840323-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026S00840323-I1Open ↗
08/23/2026S00840323-P1Open ↗
08/23/2026S00840323-P2Open ↗
Showing 3 of 5 on file for this type