← Back
Two family frame
6844 AMBOY ROAD
STATEN ISLAND · BIN 5105087
💬 Discuss this project
1915Year Built
2Stories
B2Building Class
PARKZoning
3,923 sfGross Floor Area
2Units
Two family frame · Owner of record: EPX LLC · 47,922 sf lot · 0.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC507/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ CONSTRUCTION GROUP INCGeneral Contractor407/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449507/24/2023
Building Lifecycle
All (34)Filed (5)Permit Issued (3)Signed Off (3)Inspection (5)Special Inspection (18)
04/29/2025
Signed off — Alteration
Propose mechanical work for existing residential building as per plan. No change in use, egress, or occupancy.
S00849532-I1
10/15/2024
Signed off — Alteration
Propose plumbing work for existing residential building as per plan. No change in use, egress, or occupancy.
S00840314-I1
09/14/2023
Signed off — Alteration
Propose interior renovation for existing residential building with new partition work and floor finish as per plan. No change in use, egress or occupancy.
S00840291-I1
08/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/03/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/31/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/26/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/25/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/25/2023
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
07/24/2023
Filed — Alteration
Propose plumbing work for existing residential building as per plan. No change in use, egress, or occupancy.
S00840314-P1
07/24/2023
Filed — Alteration
Propose interior renovation for existing residential building with new partition work and floor finish as per plan. No change in use, egress or occupancy.
S00840291-P1
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/21/2023
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
07/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/21/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
05/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/12/2023
Permit issued — Plumbing
S00840314-I1-PL
04/08/2023
Permit issued — General Construction
S00840291-I1-GC
04/08/2023
Permit issued — Mechanical Systems
S00849532-I1-MS
03/28/2023
Filed — Alteration
Propose mechanical work for existing residential building as per plan. No change in use, egress, or occupancy.
S00849532-I1
03/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
03/28/2023
Special inspection requirement — Ventilation and air distribution system
MOHAMED MAHMOUD
03/28/2023
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
03/28/2023
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMED MAHMOUD
03/27/2023
Filed — Alteration
Propose plumbing work for existing residential building as per plan. No change in use, egress, or occupancy.
S00840314-I1
03/27/2023
Filed — Alteration
Propose interior renovation for existing residential building with new partition work and floor finish as per plan. No change in use, egress or occupancy.
S00840291-I1
03/24/2023
Special inspection requirement — Final
MOHAMED MAHMOUD
03/24/2023
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC04/12/2023
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC04/08/2023
DOB NOWMechanical SystemsSigned-offJZ CONSTRUCTION GROUP INC04/08/2023
1 project · most recent 04/17/2023
General Wiring
FiledStatusContractorScope
04/17/2023CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/31/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/26/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/26/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
07/25/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
07/25/2023Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
07/25/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/25/2023Interior lighting powerMOHAMED MAHMOUDenergy_progress
07/24/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/24/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
07/21/2023Interior lighting powerMOHAMED MAHMOUDenergy_progress
07/21/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/21/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
07/21/2023Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
03/28/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
03/28/2023Ventilation and air distribution systemMOHAMED MAHMOUDenergy_progress
03/28/2023Maintenance informationMOHAMED MAHMOUDenergy_progress
03/28/2023Duct leakage testing, insulation and designMOHAMED MAHMOUDenergy_progress
03/24/2023FinalMOHAMED MAHMOUDprogress
03/24/2023Mechanical SystemsMOHAMED MAHMOUDspecial
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00840291-P1Request digital key ↗
08/23/2026S00840291-I1Request digital key ↗
08/23/2026S00849532-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S00840314-I1Open ↗
08/31/2026S00840291-P1Open ↗
08/31/2026S00840291-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00840291-P1Open ↗
08/23/2026S00840291-I1Open ↗
08/13/2026S00840314-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026S00840314-I1Open ↗
08/31/2026S00840291-P1Open ↗
08/31/2026S00840291-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026S00840291-I1Open ↗
08/23/2026S00840291-P1Open ↗
08/13/2026S00840314-I1Open ↗
Showing 3 of 5 on file for this type