← Back
BuildNYC
Five to six families
686 ONDERDONK AVENUE
QUEENS · Ridgewood · BIN 4082554
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R6BZoning
4,875 sfGross Floor Area
6Units
Rent Stabilized9 Active Violations ▸FDNY Report ↗
Five to six families · Owner of record: 686 Onderdonk · 2,500 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDemolition of partitions and fixtures7p · 1 filing · 20 docs
Floor 3Demolition of partitions and fixtures12p · 1 filing · 20 docs
Floor 2Demolition of partitions and fixtures11p · 1 filing · 20 docs
Floor 1Demolition of partitions and fixtures12p · 1 filing · 20 docs
CellarDemolition of partitions and fixtures12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
686 Onderdonk103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2024$950K—2021-1 REALTY HOLDINGS III, LLC → 686 ONDERDONK LLC$195/sf building
11/19/2018$195K—Private party → ONDERDOM LLC$40/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Baobab Architects203/17/2025
Chosen MEP205/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ellipses Design403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JB Construction & DesignGeneral Contractor307/08/2026
JB Construction Designspecialty_contractor107/08/2026
Creative Plumbing inPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616403/17/2025
Building Lifecycle
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · open
09/10/2025
Signed off — Alteration
MECHANICAL APPLICATION HEREBY FILED AS A SUBSEQUENT FILING TO JOB #Q00985699.
Q00985699-S2
09/10/2025
Signed off — Alteration
MECHANICAL APPLICATION HEREBY FILED AS A SUBSEQUENT FILING TO JOB #Q00985699.
Q00985699-S1
09/10/2025
Signed off — Alteration
MECHANICAL APPLICATION HEREBY FILED AS A SUBSEQUENT FILING TO JOB #Q00985699.
Q00985699-I1
07/23/2025
§ 27-2005, 27-2007, 27-2041.1 hmc, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or…
HPD violation · closed
179 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJB Construction Design07/03/2024
DOB NOWGeneral ConstructionSigned-offJB Construction Design06/28/2024
DOB NOWPlumbingSigned-offAB Plumbing06/27/2024
DOB NOWGeneral ConstructionSigned-offJB Construction Design04/05/2024
2 projects · most recent 05/02/2024
General Wiring
FiledStatusContractorScope
05/02/2024Permit IssuedFried ElectricGeneral Wiring
11/12/2019CompleteDeltex Electrical Cont. I—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/19/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
12/24/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/24/2024MeteringFAHAD FATEHenergy_progress
12/24/2024Sprayed fire-resistant materialsFAHAD FATEHspecial
12/24/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/24/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
12/24/2024FinalFAHAD FATEHprogress
12/24/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/24/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
12/24/2024Lighting controlsFAHAD FATEHenergy_progress
12/24/2024Maintenance informationFAHAD FATEHenergy_progress
12/24/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/24/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
12/24/2024Interior lighting powerFAHAD FATEHenergy_progress
12/24/2024Exterior lighting powerFAHAD FATEHenergy_progress
05/28/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/28/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/20/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/02/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/01/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
05/01/2024Maintenance informationFAHAD FATEHenergy_progress
05/01/2024FinalFAHAD FATEHprogress
05/01/2024Mechanical SystemsFAHAD FATEHspecial
20 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account