← Back
Over six families without stores
687 5TH AVENUE
BROOKLYN · BIN 3017368
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R6AZoning
5,263 sfGross Floor Area
8Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 689 5TH LLC · 1,761 sf lot · 2.99 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingGeneral
Roof3p · 3 filings · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 10 docs
Floor 32p · 2 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 11p · 1 filing · 17 docs
Cellar1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING507/08/2026
BRUKLYN BUILDERS4007/08/2026
689 5TH LLC703/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGN1603/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRUKLYN BUILDERS INCGeneral Contractor1907/08/2026
JSB WORKS INCGeneral Contractor303/22/2026
LND ARCHITECTGeneral Contractor303/22/2026
MPI PLUMBING CORPPlumbing307/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor207/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
LEANDRO DICKSONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191011/18/2021
Building Lifecycle
All (91)Filed (13)Permit Issued (11)Signed Off (9)Violation (4)Inspection (8)Objection (16)Special Inspection (30)
04/30/2026
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/16/2022
Signed off — Alteration
Plumbing and sprinkler work in conjunction with application number 321599365.
B00500772-I1
02/09/2022
Signed off — Alteration
B00586830-I1
01/27/2022
Signed off — Alteration
B00524336-I1
01/20/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/18/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/13/2021
Signed off — Alteration
B00518237-I1
12/10/2021
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
12/03/2021
Signed off — Alteration
B00474908-I1
12/03/2021
Signed off — Alteration
B00491420-S1
12/03/2021
Signed off — Alteration
New split system for heating and cooling and new ventilation systems filed in conjunction with alt 1 application # 321599365
B00500777-I1
12/03/2021
Signed off — Alteration
B00491417-I1
11/18/2021
Filed — Alteration
Plumbing and sprinkler work in conjunction with application number 321599365.
B00500772-P2
11/17/2021
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
11/17/2021
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
11/17/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
11/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/17/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
11/17/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
11/17/2021
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
11/12/2021
Permit issued — Mechanical Systems
B00500777-I1-MS
10/29/2021
Signed off — Alteration
B00491420-I1
10/27/2021
Permit issued — Construction Fence
B00518237-I1-FN
10/25/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/08/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/09/2021
Permit issued — Supported Scaffold
B00586830-I1-SF
09/09/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/08/2021
Filed — Alteration
B00586830-I1
08/16/2021
Special inspection requirement — Final
NAVEEN KUMAR
08/16/2021
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
08/16/2021
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
08/16/2021
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
08/16/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/16/2021
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
08/16/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
08/16/2021
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
08/16/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
08/16/2021
Special inspection requirement — Footing and Foundation
Younes Abouyaala
08/05/2021
Filed — Alteration
B00491417-P1
08/05/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/05/2021
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
08/05/2021
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
08/05/2021
Special inspection requirement — Footing and Foundation
Younes Abouyaala
08/05/2021
Special inspection requirement — Final
NAVEEN KUMAR
08/05/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
08/05/2021
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
08/05/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
08/05/2021
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
08/05/2021
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
07/14/2021
Permit issued — Plumbing
B00500772-I1-EW-SP
07/09/2021
Permit issued — Plumbing
B00500772-I1-PL
06/18/2021
Permit issued — General Construction
B00491417-I1-GC-CX
06/18/2021
Violation issued (ECB, closed)
Construction
06/18/2021
Violation issued (ECB, closed)
Construction
06/10/2021
Permit issued — Support of Excavation
B00491420-I1-SE
06/10/2021
Permit issued — Foundation
B00491420-S1-FO
05/19/2021
Permit issued — Sidewalk Shed
B00524336-I1-SH
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBRUKLYN BUILDERS INC11/12/2021
DOB NOWConstruction FenceSigned-offBRUKLYN BUILDERS INC10/27/2021
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING09/09/2021
DOB NOWPlumbingSigned-offA M B MECHANICAL INC07/14/2021
DOB NOWPlumbingSigned-offYG SERVICES INC07/09/2021
DOB NOWGeneral ConstructionSigned-offBRUKLYN BUILDERS INC06/18/2021
DOB NOWSupport of ExcavationSigned-offBRUKLYN BUILDERS INC06/10/2021
DOB NOWFoundationSigned-offBRUKLYN BUILDERS INC06/10/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/19/2021
DOB NOWConstruction FenceSigned-offBRUKLYN BUILDERS INC05/12/2021
DOB NOWStructuralSigned-offBRUKLYN BUILDERS INC04/01/2021
BIS—ISSUEDJSB WORKS INC06/22/2021
BIS—ISSUEDJSB WORKS INC06/10/2021
2 projects · most recent 01/24/2022
General Wiring
FiledStatusContractorScope
01/24/2022CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
05/18/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/20/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/30/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/10/2021Pass-Final Fence Non-Directive 14PassView ↗
10/25/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/08/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
11/17/2021HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
11/17/2021Sprinkler SystemsYounes Abouyaalaspecial
11/17/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
11/17/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/17/2021HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
11/17/2021Maintenance informationYounes Abouyaalaenergy_progress
11/17/2021HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
08/16/2021FinalNAVEEN KUMARprogress
08/16/2021Structural Steel - WeldingYounes Abouyaalaspecial
08/16/2021Concrete - Cast-In-PlaceYounes Abouyaalaspecial
08/16/2021Post-installed AnchorsYounes Abouyaalaspecial
08/16/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/16/2021Structural Cold-Formed SteelYounes Abouyaalaspecial
08/16/2021Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
08/16/2021Structural Steel - DetailsYounes Abouyaalaspecial
08/16/2021Structural Steel - High Strength BoltingYounes Abouyaalaspecial
08/16/2021Footing and FoundationYounes Abouyaalaprogress
08/05/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/05/2021Structural Cold-Formed SteelYounes Abouyaalaspecial
08/05/2021Post-installed AnchorsYounes Abouyaalaspecial
08/05/2021Footing and FoundationYounes Abouyaalaprogress
08/05/2021FinalNAVEEN KUMARprogress
08/05/2021Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
08/05/2021Structural Steel - WeldingYounes Abouyaalaspecial
08/05/2021Structural Steel - High Strength BoltingYounes Abouyaalaspecial
Latest 25 of 50.
▾Documents — 178 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch10
09/01/2026B00491417-P1Request digital key ↗
09/01/2026B00491417-I1Request digital key ↗
09/01/2026B00491420-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00474908-I1Request digital key ↗
09/01/2026B00474908-P1Request digital key ↗
09/01/2026B00474908-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural3
09/01/2026B00474908-I1Request digital key ↗
08/15/2026B00474908-P2Request digital key ↗
08/15/2026B00474908-P1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION12
03/08/2022321599365Open ↗
02/01/2022321599365Open ↗
12/08/2021321599365Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION2
06/14/2021321599365Open ↗
06/10/2021321599365Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
06/10/2021321599365Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
06/10/2021321599365Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/30/2021340810331Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/22/2021321599365Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISVERIFY TAX LOT2
03/15/2022321599365Open ↗
12/22/2021321599365Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/09/2021321599365Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/27/2021321599365Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/27/2021321599365Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/22/2021321599365Open ↗
▸BISZONING DIAGRAM1
06/03/2021321599365Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/27/2021321599365Open ↗
▸Seals & Professional Certifications48
▸DOB NOWSpecial Inspector Seal & Signature17
08/28/2026B00491420-S1Open ↗
08/28/2026B00491420-S1Open ↗
08/27/2026B00491417-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
08/31/2026B00474908-P2Open ↗
08/28/2026B00491420-S1Open ↗
08/27/2026B00491417-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00474908-P1Open ↗
09/01/2026B00474908-P2Open ↗
09/01/2026B00474908-I1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/18/2021340810331Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/18/2021340810331Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
02/03/2022321599365Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/29/2021321599365Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST4
03/17/2022321599365Open ↗
06/30/2021340810331Open ↗
05/20/2021321599365Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
06/30/2021340810331Open ↗
06/10/2021321599365Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/14/2021321599365Open ↗
05/20/2021321599365Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/18/2021340810331Open ↗
▸BISSTREET TREE SIGNOFF1
03/18/2022321599365Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00474908-P2Open ↗
09/01/2026B00474908-P1Open ↗
09/01/2026B00474908-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00491417-I1Open ↗
08/14/2026B00500772-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/20/2021321599365Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/22/2021321599365Open ↗
06/10/2021321599365Open ↗
05/20/2021321599365Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00500777-I1Open ↗
08/14/2026B00500772-I1Open ↗
▸BISINTERIOR LIGHTING POWER1
12/13/2021321599365Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/13/2021321599365Open ↗
▸BISFENESTRATION AREAS1
12/13/2021321599365Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/13/2021321599365Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/13/2021321599365Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/13/2021321599365Open ↗
▸BISLIGHTING CONTROLS1
12/13/2021321599365Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/22/2021321599365Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/13/2021321599365Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/13/2021321599365Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/13/2021321599365Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/22/2021321599365Open ↗
06/10/2021321599365Open ↗
05/20/2021321599365Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT4
08/13/2026B00491420-I1Open ↗
08/13/2026B00491417-P1Open ↗
08/13/2026B00491420-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram3
08/13/2026B00491420-S1Open ↗
08/13/2026B00491420-I1Open ↗
08/13/2026B00491417-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B00491420-I1Open ↗
08/13/2026B00491420-S1Open ↗
08/13/2026B00491417-I1Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/13/2021321599365Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/20/2021321599365Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE3
06/01/2021321599365Open ↗
03/24/2021321599365Open ↗
03/16/2021321599365Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/24/2022321599365Open ↗
06/03/2021321599365Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
11/22/2021321599365Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT (FINAL): PW32
03/15/2022321599365Open ↗
11/21/2021321599365Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/10/2021321599365Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
05/20/2021321599365Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/10/2021321599365Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
06/14/2021321599365Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION10
03/16/2022321599365Open ↗
12/16/2021321599365Open ↗
08/13/2021321599365Open ↗
Showing 3 of 10 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/30/2021340810331Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/18/2021340810331Open ↗
▸Other Documents12
▸BISPLOT DIAGRAM2
11/17/2021321599365Open ↗
05/20/2021321599365Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/20/2021321599365Open ↗
▸BISMETERING1
01/24/2022321599365Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/30/2021340810331Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
12/13/2021321599365Open ↗
▸BISMAINTENANCE INFORMATION1
12/13/2021321599365Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/18/2021340810331Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/13/2021321599365Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
12/13/2021321599365Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00491420-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00491420-I1Open ↗