← Back
Five to six families
688 MAC DONOUGH STREET
BROOKLYN · BIN 3040331
💬 Discuss this project
1910Year Built
3Stories
C2Building Class
R6BZoning
3,300 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Five to six families · Owner of record: MACDONOUGH PLATINUM LLC · 2,000 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 336p · 1 filing · 20 docs
Floor 234p · 1 filing · 20 docs
Floor 134p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MACDONOUGH PLATINUM LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/09/2024$1.2M—Private party → MACDONOUGH PLATINUM LLC$379/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INFOCUS DESIGN AND PLANNING PC701/15/2025
NY BUILDING ASSOCIATES INC111/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XH&RC PLUMBING AND HEATING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UGB CONSTRUCTION INCGeneral Contractor1307/08/2026
WU(WOODY) CHENElectrical203/21/2026
DOUGS PLBG HTG SERVPlumbing203/22/2026
ADAM ELECL CONTRNG LLCElectrical103/22/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
WATERMARK PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SJS INSPECTIONS AND CONSU8286701/15/2025
Building Lifecycle
All (86)Filed (8)Permit Issued (10)Signed Off (4)Violation (14)Inspection (8)Objection (12)Special Inspection (30)
10/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2025
Violation issued (HPD, closed)
A
04/02/2025
Signed off — Alteration CO
CONVERT AN EXISTING THREE-FAMILY THREE-STORY TO SIX-FAMILY THREE-STORY BUILDING WITH A CELLAR AS SHOWN ON PLANS.
B00620184-S2
01/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
01/16/2025
Special inspection requirement — Maintenance information
SERGEY BOLOTOV
01/16/2025
Special inspection requirement — Lighting controls
SERGEY BOLOTOV
01/16/2025
Special inspection requirement — Insulation placement and R values
SERGEY BOLOTOV
01/16/2025
Special inspection requirement — Vestibules
SERGEY BOLOTOV
01/16/2025
Special inspection requirement — Lighting in dwelling units
SERGEY BOLOTOV
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
SERGEY BOLOTOV
01/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY BOLOTOV
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
01/15/2025
Filed — Alteration CO
CONVERT AN EXISTING THREE-FAMILY THREE-STORY TO SIX-FAMILY THREE-STORY BUILDING WITH A CELLAR AS SHOWN ON PLANS.
B00620184-P3
01/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY BOLOTOV
01/15/2025
Special inspection requirement — Lighting in dwelling units
SERGEY BOLOTOV
01/15/2025
Special inspection requirement — Lighting controls
SERGEY BOLOTOV
01/15/2025
Special inspection requirement — Insulation placement and R values
SERGEY BOLOTOV
01/15/2025
Special inspection requirement — Maintenance information
SERGEY BOLOTOV
01/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
01/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
01/15/2025
Special inspection requirement — Energy Code Compliance Inspections
SERGEY BOLOTOV
01/15/2025
Special inspection requirement — Vestibules
SERGEY BOLOTOV
01/13/2025
Filed — Alteration CO
CONVERT AN EXISTING THREE-FAMILY THREE-STORY TO SIX-FAMILY THREE-STORY BUILDING WITH A CELLAR AS SHOWN ON PLANS.
B00620184-P2
01/13/2025
Objection raised — Admin
01/13/2025
Objection resolved — Addressed
01/02/2025
Special inspection requirement — Lighting controls
SERGEY BOLOTOV
01/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
01/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
01/02/2025
Special inspection requirement — Energy Code Compliance Inspections
SERGEY BOLOTOV
01/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERGEY BOLOTOV
01/02/2025
Special inspection requirement — Vestibules
SERGEY BOLOTOV
01/02/2025
Special inspection requirement — Maintenance information
SERGEY BOLOTOV
01/02/2025
Special inspection requirement — Insulation placement and R values
SERGEY BOLOTOV
01/02/2025
Special inspection requirement — Lighting in dwelling units
SERGEY BOLOTOV
12/18/2024
Signed off — Alteration CO
CONVERT AN EXISTING THREE-FAMILY THREE-STORY TO SIX-FAMILY THREE-STORY BUILDING WITH A CELLAR AS SHOWN ON PLANS.
B00620184-S1
12/04/2024
Signed off — Alteration CO
CONVERT AN EXISTING THREE-FAMILY THREE-STORY TO SIX-FAMILY THREE-STORY BUILDING WITH A CELLAR AS SHOWN ON PLANS.
B00620184-S4
12/02/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/29/2024
Violation issued (HPD, closed)
I
11/27/2024
Filed — Alteration CO
CONVERT AN EXISTING THREE-FAMILY THREE-STORY TO SIX-FAMILY THREE-STORY BUILDING WITH A CELLAR AS SHOWN ON PLANS.
B00620184-P1
11/27/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
11/21/2024
Special inspection requirement — Lighting in dwelling units
SERGEY BOLOTOV
11/21/2024
Special inspection requirement — Maintenance information
SERGEY BOLOTOV
11/14/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/07/2024
Signed off — Alteration CO
CONVERT AN EXISTING THREE-FAMILY THREE-STORY TO SIX-FAMILY THREE-STORY BUILDING WITH A CELLAR AS SHOWN ON PLANS.
B00620184-S3
09/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2024
Permit issued — General Construction
B00620184-I1-GC
09/23/2024
Permit issued — Construction Fence
B00620184-S3-FN
09/23/2024
Permit issued — Structural
B00620184-S4-ST
09/23/2024
Permit issued — Mechanical Systems
B00620184-S1-MS
09/18/2024
Permit issued — Mechanical Systems
B00620184-S1-MS
08/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2024
Permit issued — Sprinklers
B00620184-S2-EW-SP
07/24/2024
Permit issued — Plumbing
B00620184-S2-PL
06/05/2024
Permit issued — General Construction
B00620184-I1-GC
05/17/2024
Permit issued — Structural
B00620184-S4-ST
05/16/2024
Permit issued — Construction Fence
B00620184-S3-FN
04/11/2024
Violation issued (HPD, closed)
A
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUGB CONSTRUCTION INC09/23/2024
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC09/23/2024
DOB NOWStructuralSigned-offUGB CONSTRUCTION INC09/23/2024
DOB NOWMechanical SystemsSigned-offUGB CONSTRUCTION INC09/23/2024
DOB NOWMechanical SystemsSigned-offUGB CONSTRUCTION INC09/18/2024
DOB NOWSprinklersSigned-offDOUG'S PLBG & HTG SERV CO07/25/2024
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP07/24/2024
DOB NOWGeneral ConstructionPermit IssuedUGB CONSTRUCTION INC06/05/2024
DOB NOWStructuralSigned-offUGB CONSTRUCTION INC05/17/2024
DOB NOWConstruction FenceSigned-offUGB CONSTRUCTION INC05/16/2024
1 project · most recent 01/03/2025
General Wiring
FiledStatusContractorScope
01/03/2025CompleteADAM ELECL CONTRNG LLCGeneral Wiring
1 project · most recent 01/15/2025
Fence
FiledStatusContractorScope
01/15/2025Signed-offUGB CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
01/16/2025Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
01/16/2025Maintenance informationSERGEY BOLOTOVenergy_progress
01/16/2025Lighting controlsSERGEY BOLOTOVenergy_progress
01/16/2025Insulation placement and R valuesSERGEY BOLOTOVenergy_progress
01/16/2025VestibulesSERGEY BOLOTOVenergy_progress
01/16/2025Lighting in dwelling unitsSERGEY BOLOTOVenergy_progress
01/16/2025Energy Code Compliance InspectionsSERGEY BOLOTOVprogress
01/16/2025Fire-Resistance Rated ConstructionSERGEY BOLOTOVprogress
01/16/2025Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
01/15/2025Fire-Resistance Rated ConstructionSERGEY BOLOTOVprogress
01/15/2025Lighting in dwelling unitsSERGEY BOLOTOVenergy_progress
01/15/2025Lighting controlsSERGEY BOLOTOVenergy_progress
01/15/2025Insulation placement and R valuesSERGEY BOLOTOVenergy_progress
01/15/2025Maintenance informationSERGEY BOLOTOVenergy_progress
01/15/2025Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
01/15/2025Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
01/15/2025Energy Code Compliance InspectionsSERGEY BOLOTOVprogress
01/15/2025VestibulesSERGEY BOLOTOVenergy_progress
01/02/2025Lighting controlsSERGEY BOLOTOVenergy_progress
01/02/2025Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
01/02/2025Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
01/02/2025Energy Code Compliance InspectionsSERGEY BOLOTOVprogress
01/02/2025Fire-Resistance Rated ConstructionSERGEY BOLOTOVprogress
01/02/2025VestibulesSERGEY BOLOTOVenergy_progress
01/02/2025Maintenance informationSERGEY BOLOTOVenergy_progress
Latest 25 of 45.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026B00620184-P1Request digital key ↗
08/31/2026B00620184-P3Request digital key ↗
08/31/2026B00620184-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00620184-I1Open ↗
08/13/2026B00620184-P2Open ↗
08/13/2026B00620184-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00620184-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00620184-I1Open ↗
09/01/2026B00620184-I1Open ↗
08/31/2026B00620184-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026B00620184-S1Open ↗
08/13/2026B00620184-P1Open ↗
08/13/2026B00620184-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00620184-I1Open ↗
08/31/2026B00620184-S2Open ↗
08/28/2026B00620184-P3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/13/2026B00620184-P2Open ↗
08/13/2026B00620184-P3Open ↗
08/13/2026B00620184-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00620184-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026B00620184-I1Open ↗
08/13/2026B00620184-P1Open ↗
08/13/2026B00620184-P3Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00620184-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026B00620184-P2Open ↗
08/13/2026B00620184-I1Open ↗
08/13/2026B00620184-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00620184-I1Open ↗