← Back
Four families
688 MONROE STREET
BROOKLYN · BIN 3044982
💬 Discuss this project
1931Year Built
3Stories
C3Building Class
R6AZoning
3,300 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Four families · 1,500 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GIBRALTAR GROUP HOLDINGS LLC1507/08/2026
GIBRALTAR GROUP403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO VURAL405/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME IMPRO SERVS GRP INCGeneral Contractor203/21/2026
APOLLO PLBG & HTG INCPlumbing207/08/2026
CHRISTOPHER SCHAEFERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KATZ ENGINEERING238405/03/2022
A.S. ENGINEERING SERVICES5735202/17/2022
Building Lifecycle
All (80)Filed (4)Permit Issued (3)Signed Off (2)Violation (7)Inspection (5)Objection (44)Special Inspection (15)
05/08/2026
Violation issued (HPD, closed)
A
03/30/2023
Violation issued (HPD, closed)
A
06/28/2022
Signed off — Alteration
PROPOSE EXTERIOR WORKS FOR NEW THRU-WALL A/C, FILL-IN EXISTING OPENING, WINDOWS OPENING MODIFICATION WORKS; & INTERIOR RENOVATION WITH MINIOR PARTITIONS, FINISH WORK AT EXISTING UNIT#1; PLUMBING WORK FILED SEPARATELY. NO CHANGE IN USE, EGRESS, & OCCUPANCY
B00591273-I1
06/23/2022
Signed off — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, ERESS, OR OCCUPANCY.
B00591643-I1
06/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2022
Permit issued — Plumbing
B00591643-I1-PL
05/31/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/03/2022
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, ERESS, OR OCCUPANCY.
B00591643-P1
05/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
YURI KATZ
05/03/2022
Special inspection requirement — Energy Code Compliance Inspections
YURI KATZ
05/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
YURI KATZ
04/29/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/09/2022
Violation issued (HPD, closed)
A
03/07/2022
Special inspection requirement — Masonry
ALEXIS SPYROU
03/07/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SPYROU
03/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
YURI KATZ
03/07/2022
Special inspection requirement — Final
YURI KATZ
03/07/2022
Special inspection requirement — Energy Code Compliance Inspections
YURI KATZ
03/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
YURI KATZ
03/07/2022
Special inspection requirement — Interior lighting power
YURI KATZ
03/07/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
YURI KATZ
03/07/2022
Special inspection requirement — Air barrier - visual inspection
YURI KATZ
03/07/2022
Special inspection requirement — Fenestration areas
YURI KATZ
03/07/2022
Special inspection requirement — Fenestration air leakage
YURI KATZ
03/07/2022
Special inspection requirement — Insulation placement and R values
YURI KATZ
02/25/2022
Objection resolved — Addressed
02/24/2022
Objection raised — Scope
02/17/2022
Filed — Alteration
PROPOSE EXTERIOR WORKS FOR NEW THRU-WALL A/C, FILL-IN EXISTING OPENING, WINDOWS OPENING MODIFICATION WORKS; & INTERIOR RENOVATION WITH MINIOR PARTITIONS, FINISH WORK AT EXISTING UNIT#1; PLUMBING WORK FILED SEPARATELY. NO CHANGE IN USE, EGRESS, & OCCUPANCY
B00591273-P1
02/03/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/19/2022
Permit issued — Plumbing
B00591643-I1-PL
12/10/2021
Permit issued — General Construction
B00591273-I1-GC
09/20/2021
Objection raised — Inspections
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Energy
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Energy
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Energy
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Scope
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Admin
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Scope
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Fire_Protection
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Accessibility
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Accessibility
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Other
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Other
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Other
09/20/2021
Objection resolved — Addressed
09/20/2021
Objection raised — Cost
09/20/2021
Objection resolved — Addressed
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC06/01/2022
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC01/19/2022
DOB NOWGeneral ConstructionSigned-offHOME IMPRO SERVS GRP12/10/2021
BIS—ISSUEDS & M PLUMBING & HEATING12/08/2006
BISEQISSUEDS & M PLUMBING & HEATING12/08/2006
BISPLISSUEDAMERICAN NATIONAL PL & HTG INC11/17/2006
BIS—ISSUEDS & M PLUMBING & HEATING05/19/2006
BISEQISSUEDS & M PLUMBING & HEATING05/19/2006
BIS—ISSUEDNOSTRAND CONTRACTING,COPR.06/02/1993
BISEQISSUEDNOSTRAND CONTRACTING,COPR.06/02/1993
1 project · most recent 01/12/2022
General Wiring
FiledStatusContractorScope
01/12/2022CompleteEVS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/29/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/03/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
05/03/2022Fire-Resistant Penetrations and JointsYURI KATZspecial
05/03/2022Energy Code Compliance InspectionsYURI KATZprogress
05/03/2022HVAC-R and service water piping design and insulationYURI KATZenergy_progress
03/07/2022MasonryALEXIS SPYROUspecial
03/07/2022Structural Stability – Alterations of existing buildingsALEXIS SPYROUspecial
03/07/2022Fire-Resistant Penetrations and JointsYURI KATZspecial
03/07/2022FinalYURI KATZprogress
03/07/2022Energy Code Compliance InspectionsYURI KATZprogress
03/07/2022Fire-Resistance Rated ConstructionYURI KATZprogress
03/07/2022Interior lighting powerYURI KATZenergy_progress
03/07/2022Fenestration and door U-factor and product ratingsYURI KATZenergy_progress
03/07/2022Air barrier - visual inspectionYURI KATZenergy_progress
03/07/2022Fenestration areasYURI KATZenergy_progress
03/07/2022Fenestration air leakageYURI KATZenergy_progress
03/07/2022Insulation placement and R valuesYURI KATZenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00591643-P1Request digital key ↗
09/01/2026B00591643-I1Request digital key ↗
08/15/2026B00591273-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026B00591273-I1Open ↗
08/31/2026B00591273-I1Open ↗
08/31/2026B00591273-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00591643-I1Open ↗
09/01/2026B00591643-P1Open ↗
08/13/2026B00591273-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00591273-I1Open ↗
08/31/2026B00591273-I1Open ↗
08/31/2026B00591273-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00591643-I1Open ↗
08/13/2026B00591273-I1Open ↗