← Back
Walk-up apt, over six families with stores
689 5TH AVENUE
BROOKLYN · Sunset Park (West) · BIN 3017367
💬 Discuss this project
1931Year Built
5Stories
C7Building Class
R6AZoning
5,520 sfGross Floor Area
9Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 689 5TH LLC · 1,853 sf lot · 2.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 4 docs
Floor 52p · 1 filing · 10 docs
Floor 4
Floor 35p · 2 filings · 20 docs
Floor 22p · 2 filings · 14 docs
Floor 13p · 3 filings · 20 docs
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING707/08/2026
BRUKLYN BUILDERS3707/08/2026
689 5TH LLC903/22/2026
LSB WORKS INC103/22/2026
BILLY CONTRACTORS203/21/2026
ATLAS SAVINGS BANK103/21/2026
ATLAS BANK103/21/2026
ARTISAN SERVICES INC C O KEARNY303/21/2026
KEARNY FEDERAL SAVINGS BANK203/21/2026
KEARNY BANK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGN1603/21/2026
ADVANCED BUILDERS SERVICES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRUKLYN BUILDERS INCGeneral Contractor1607/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor507/08/2026
LND ARCHITECTGeneral Contractor303/22/2026
LEANDRO N DICKSONElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519811/18/2021
Building Lifecycle
All (98)Filed (14)Permit Issued (12)Signed Off (10)Violation (22)Inspection (8)Objection (2)Special Inspection (30)
04/30/2026
Violation issued (HPD, closed)
A
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/08/2022
Signed off — Alteration
Plumbing and sprinkler work in conjunction with application number 321599374.
B00504486-I1
01/20/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/18/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/20/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/20/2021
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
12/13/2021
Signed off — Alteration
B00518234-I1
12/13/2021
Objection resolved — Addressed
12/10/2021
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
12/07/2021
Signed off — Alteration
B00515076-I1
12/07/2021
Signed off — Alteration
B00489707-I1
12/07/2021
Signed off — Alteration
B00515070-I1
12/06/2021
Signed off — Alteration
B00491433-S1
12/03/2021
Signed off — Alteration
B00474719-I1
12/03/2021
Signed off — Alteration
B00504471-I1
12/03/2021
Violation issued (ECB, closed)
Construction
11/30/2021
Signed off — Alteration
B00491430-I1
11/24/2021
Objection raised — Scope
11/18/2021
Filed — Alteration
Plumbing and sprinkler work in conjunction with application number 321599374.
B00504486-P1
11/12/2021
Permit issued — Mechanical Systems
B00504471-I1-MS
10/29/2021
Signed off — Alteration
B00491433-I1
10/27/2021
Permit issued — Construction Fence
B00518234-I1-FN
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/22/2021
Violation issued (ECB, closed)
Construction
10/08/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/20/2021
Permit issued — Foundation
B00491433-S1-FO
09/17/2021
Violation issued (ECB, closed)
Construction
09/09/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2021
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
08/23/2021
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
08/23/2021
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
08/23/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
08/23/2021
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
08/23/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
08/23/2021
Special inspection requirement — Final
Younes Abouyaala
08/23/2021
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
08/23/2021
Special inspection requirement — Footing and Foundation
Younes Abouyaala
08/23/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/10/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/06/2021
Violation issued (ECB, closed)
Site Safety
08/06/2021
Violation issued (ECB, closed)
Construction
08/06/2021
Violation issued (ECB, closed)
Construction
08/06/2021
Violation issued (ECB, closed)
Construction
08/05/2021
Filed — Alteration
B00491430-P1
08/05/2021
Special inspection requirement — Footing and Foundation
Younes Abouyaala
08/05/2021
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
08/05/2021
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
08/05/2021
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
08/05/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBRUKLYN BUILDERS INC11/12/2021
DOB NOWConstruction FenceSigned-offBRUKLYN BUILDERS INC10/27/2021
DOB NOWFoundationSigned-offBRUKLYN BUILDERS INC09/20/2021
DOB NOWPlumbingSigned-offA M B MECHANICAL INC07/06/2021
DOB NOWPlumbingSigned-offYG SERVICES INC06/29/2021
DOB NOWSupport of ExcavationSigned-offBRUKLYN BUILDERS INC06/10/2021
DOB NOWFoundationSigned-offBRUKLYN BUILDERS INC05/20/2021
DOB NOWConstruction FenceSigned-offBRUKLYN BUILDERS INC05/12/2021
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING05/05/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/05/2021
DOB NOWStructuralSigned-offBRUKLYN BUILDERS INC03/29/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING03/21/2021
BIS—ISSUEDJSB WORKS INC06/22/2021
BISBLISSUEDEAST COAST MECHANICAL LLC04/16/2019
BISPLISSUEDEAST COAST MECHANICAL LLC04/16/2019
BISOTISSUEDJOSEPH EPISCOPO &SONS INC08/27/2015
BIS—ISSUEDPAUL SIGNS, INC07/10/2015
BIS—ISSUEDPAUL SIGNS, INC07/10/2015
BIS—ISSUEDPAUL SIGNS, INC07/10/2015
BISOTISSUEDGRAPHIC SIGNS & AWNINGS L11/09/2011
BIS—ISSUEDMAD SIGNS INC11/09/2011
BIS—ISSUEDMAD SIGNS INC11/09/2011
BISEQISSUEDBILLY CONTRACTORS INC05/24/2011
BISEQISSUEDBILLY CONTRACTORS INC05/20/2011
BIS—ISSUEDSERV SIGN & ERCTORS CO INC05/16/2000
BISEQISSUEDAVIV CONSTRUCTION CO INC07/21/1999
BISOTISSUEDAVIV CONSTRUCTION CO INC07/21/1999
7 projects · most recent 01/24/2022
General Wiring
FiledStatusContractorScope
01/24/2022CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
05/03/2021CompleteRICHARD NEU—
03/20/2021CompleteRICHARD NEU—
05/29/2020CompleteA & A ELEC'L CONTR'G CORPGeneral Wiring
03/17/2020CompleteRAINBOW ELECTRIC CO., INC—
03/17/2020CompleteRAINBOW ELECTRIC CO., INC—
03/17/2020CompleteRAINBOW ELECTRIC CO., INC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/20/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/30/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/10/2021Pass-Final Fence Non-Directive 14PassView ↗
10/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/10/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/02/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
12/20/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
12/20/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/20/2021Sprinkler SystemsYounes Abouyaalaspecial
08/23/2021Structural Steel - DetailsYounes Abouyaalaspecial
08/23/2021Concrete - Cast-In-PlaceYounes Abouyaalaspecial
08/23/2021Post-installed AnchorsYounes Abouyaalaspecial
08/23/2021Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
08/23/2021Structural Cold-Formed SteelYounes Abouyaalaspecial
08/23/2021Structural Steel - High Strength BoltingYounes Abouyaalaspecial
08/23/2021FinalYounes Abouyaalaprogress
08/23/2021Structural Steel - WeldingYounes Abouyaalaspecial
08/23/2021Footing and FoundationYounes Abouyaalaprogress
08/23/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/05/2021Footing and FoundationYounes Abouyaalaprogress
08/05/2021Concrete - Cast-In-PlaceYounes Abouyaalaspecial
08/05/2021Post-installed AnchorsYounes Abouyaalaspecial
08/05/2021Structural Cold-Formed SteelYounes Abouyaalaspecial
08/05/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/05/2021Structural Steel - DetailsYounes Abouyaalaspecial
08/05/2021Structural Steel - High Strength BoltingYounes Abouyaalaspecial
08/05/2021Structural Steel - WeldingYounes Abouyaalaspecial
08/05/2021Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
08/05/2021FinalYounes Abouyaalaprogress
05/05/2021UnderpinningYounes Abouyaalaspecial
05/05/2021FinalNAVEEN KUMARprogress
Latest 25 of 37.
▾Documents — 343 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch11
09/01/2026B00489707-I1Request digital key ↗
09/01/2026B00491433-I1Request digital key ↗
09/01/2026B00491433-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00474719-P2Request digital key ↗
09/01/2026B00474719-I1Request digital key ↗
09/01/2026B00474719-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural3
09/01/2026B00474719-I1Request digital key ↗
08/15/2026B00474719-P2Request digital key ↗
08/15/2026B00474719-P1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION35
02/01/2022321599374Open ↗
12/08/2021321599374Open ↗
12/03/2021322102773Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION14
06/14/2021321599374Open ↗
06/10/2021321599374Open ↗
04/15/2019340672203Open ↗
Showing 3 of 14 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
06/10/2021321599374Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/30/2021340810340Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
12/14/2021322102773Open ↗
05/11/2021321599374Open ↗
▸BISZONING DIAGRAM2
10/20/2021321599374Open ↗
06/02/2021321599374Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/28/2021321599374Open ↗
▸BISVERIFY TAX LOT1
12/22/2021321599374Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/22/2021321599374Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/28/2021321599374Open ↗
▸Seals & Professional Certifications77
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
03/28/2020320312130Open ↗
03/28/2020320312130Open ↗
03/18/2020320311131Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026B00491433-I1Open ↗
09/23/2026B00491433-I1Open ↗
09/23/2026B00491433-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00474719-P2Open ↗
09/01/2026B00474719-P1Open ↗
09/01/2026B00474719-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B00491433-I1Open ↗
09/01/2026B00491430-I1Open ↗
09/01/2026B00491430-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
07/15/2015321146559Open ↗
07/13/2015321146540Open ↗
07/13/2015321146531Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/15/2019340672203Open ↗
07/15/2015321146559Open ↗
07/13/2015321146540Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/17/2021340810340Open ↗
04/15/2019340672203Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/17/2021340810340Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/15/2019340672203Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/20/2016321096096Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/29/2021321599374Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
01/24/2022321599374Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/29/2021321599374Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
05/11/2021321599374Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST5
03/14/2022321599374Open ↗
11/22/2021321599374Open ↗
06/30/2021340810340Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
06/30/2021340810340Open ↗
06/10/2021321599374Open ↗
▸BISSTREET TREE SIGNOFF1
12/06/2021321599374Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
05/28/2021321599374Open ↗
04/15/2019340672203Open ↗
01/20/2016321096096Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00474719-P1Open ↗
09/01/2026B00474719-P2Open ↗
09/01/2026B00474719-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00474719-I1Open ↗
09/01/2026B00491430-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/22/2021321599374Open ↗
06/10/2021321599374Open ↗
05/11/2021321599374Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/27/2019340672203Open ↗
01/20/2016321096096Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/20/2020321097969Open ↗
08/27/2019340672203Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00504486-I1Open ↗
08/13/2026B00504471-I1Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/13/2021321599374Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/13/2021321599374Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/13/2021321599374Open ↗
▸BISLIGHTING CONTROLS1
12/13/2021321599374Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/22/2021321599374Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/15/2019340672203Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/13/2021321599374Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/13/2021321599374Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY7
11/22/2021321599374Open ↗
06/10/2021321599374Open ↗
05/11/2021321599374Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSOIL REPORT4
08/13/2026B00491430-I1Open ↗
08/13/2026B00491433-S1Open ↗
08/13/2026B00491433-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram4
08/13/2026B00491430-I1Open ↗
08/13/2026B00491433-I1Open ↗
08/13/2026B00491433-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram3
08/13/2026B00491433-S1Open ↗
08/13/2026B00491433-I1Open ↗
08/13/2026B00491430-I1Open ↗
▸Approvals, Objections & Sign-offs35
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
07/15/2020300876915Open ↗
07/09/2020320312130Open ↗
06/08/2020321097969Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
07/15/2015321146559Open ↗
07/13/2015321146540Open ↗
Showing 2 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
10/12/2021321599374Open ↗
10/08/2021321599374Open ↗
09/20/2021321599374Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/14/2021322102773Open ↗
12/14/2021322102773Open ↗
05/27/2021321599374Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter1
09/01/2026B00474719-I1Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT17
11/18/2021321599374Open ↗
06/08/2020321097969Open ↗
08/27/2019340672203Open ↗
Showing 3 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/21/2021321599374Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/10/2021321599374Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
05/11/2021321599374Open ↗
▸Filing & Intake Forms37
▸BISADDITIONAL INFORMATION11
02/03/2022321599374Open ↗
01/24/2022321599374Open ↗
01/24/2022321599374Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM11
04/01/2020300876915Open ↗
04/01/2020320312130Open ↗
03/28/2020320312130Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET10
01/20/2016321096096Open ↗
07/15/2015321146559Open ↗
07/13/2015321146540Open ↗
Showing 3 of 10 on file for this type
▸BISeFiling Job Application Cover Sheet4
05/17/2021340810340Open ↗
04/15/2019340672203Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWAI1 Form1
08/13/2026B00474719-P2Open ↗
▸Other Documents9
▸BISPLOT DIAGRAM3
11/17/2021321599374Open ↗
11/17/2021321599374Open ↗
01/20/2016321096096Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
12/13/2021321599374Open ↗
▸BISMAINTENANCE INFORMATION1
12/13/2021321599374Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/17/2021340810340Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/13/2021321599374Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
12/13/2021321599374Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00491433-I1Open ↗