Elevator apt, semi-fireproof without stores
689 EAST 223 STREET
BRONX · Williamsbridge-Olinville · BIN 2115530
💬 Discuss this project
2023Year Built
7Stories
D1Building Class
R6Zoning
17,684 sfGross Floor Area
23Units
Rent Stabilized3 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 689 E SJ LLC · 2,856 sf lot · 6.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Roof63p · 2 filings · 20 docs
Floor 758p · 1 filing · 20 docs
Floor 669p · 1 filing · 20 docs
Floor 568p · 1 filing · 20 docs
Floor 469p · 1 filing · 20 docs
Floor 373p · 1 filing · 20 docs
Floor 274p · 1 filing · 20 docs
Floor 199p · 3 filings · 20 docs
Cellar6p · 1 filing · 14 docs
Site & exterior100p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1962A5407/08/2026
SCG CAPITAL607/08/2026
OWNERS REP607/08/2026
WILLBROOKS EQUITES507/08/2026
DORIA, INC503/22/2026
WPR REALTY503/21/2026
689 E SJ LLC103/22/2026
SKYROCK NYC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/16/2022$2.0M—689 PROJECT LLC → 689 E SJ LLC— not available
06/16/2022$2.0M—689 PROJECT LLC → 689 E SJ LLC— not available
05/27/2021$480K—3925 WPR REALTY CORP. → 689 PROJECT LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2203/21/2026
NEVM EXPEDITORS603/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYWARD DEVELOPERS INCGeneral Contractor2507/08/2026
PARK MANAGEMENT USA CORPGeneral Contractor407/08/2026
UPPERCLASS MAINTENANCE INGeneral Contractor407/08/2026
GWT ENTERPRISES INCGeneral Contractor407/08/2026
HIVOLTS ELECTRICAL INC 004090General Contractor403/22/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
BONEI BUILDERS LLCGeneral Contractor207/08/2026
DORIA, INCGeneral Contractor203/21/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
ROCK BUILDERS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161001/06/2025
SKYLINE RIGGING7880108/29/2023
REGIONAL TESTING CORP.394205/26/2022
Building Lifecycle
All (184)Filed (16)Permit Issued (27)Signed Off (11)Violation (7)Inspection (13)Objection (80)Special Inspection (30)
04/29/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
C
04/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2025
Signed off — New Building
FILING FOR MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITH NEW BUILDING APPLICATION:X00528618. INSTALLING NEW HEATING AND COOLING AND VENTILATION SYSTEMS
X00528618-Z1
04/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/28/2025
Permit issued — Mechanical Systems
X00528618-Z1-MS
03/26/2025
Violation issued (HPD, closed)
C
02/13/2025
Objection resolved — Addressed
02/07/2025
Violation issued (HPD, closed)
B
02/05/2025
Violation issued (HPD, open)
C
01/29/2025
Objection raised — Energy
01/29/2025
Objection resolved — Addressed
01/13/2025
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
01/10/2025
Objection raised — Admin
01/06/2025
Filed — New Building
FILING FOR MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITH NEW BUILDING APPLICATION:X00528618. INSTALLING NEW HEATING AND COOLING AND VENTILATION SYSTEMS
X00528618-Z1
01/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
01/06/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/06/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/06/2025
Special inspection requirement — Final
FAHAD FATEH
01/06/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
01/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
01/06/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
01/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/10/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/01/2024
Signed off — New Building
FILING FOR MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITH NEW BUILDING APPLICATION:X00528618. INSTALLING NEW HEATING AND COOLING AND VENTILATION SYSTEMS
X00528618-S4
09/20/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
09/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/19/2024
Signed off — New Building
FILING FOR MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITH NEW BUILDING APPLICATION:X00528618. INSTALLING NEW HEATING AND COOLING AND VENTILATION SYSTEMS
X00528618-S5
09/18/2024
Signed off — New Building
FILING FOR MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITH NEW BUILDING APPLICATION:X00528618. INSTALLING NEW HEATING AND COOLING AND VENTILATION SYSTEMS
X00528618-S3
09/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/13/2024
Signed off — Alteration
X00706052-I1
09/12/2024
Signed off — New Building
FILING FOR MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITH NEW BUILDING APPLICATION:X00528618. INSTALLING NEW HEATING AND COOLING AND VENTILATION SYSTEMS
X00528618-S2
07/22/2024
Permit issued — General Construction
X00528618-I1-GC
06/12/2024
Special inspection requirement — Metering
FAHAD FATEH
06/12/2024
Special inspection requirement — Vestibules
FAHAD FATEH
06/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/12/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/12/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/12/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
06/12/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
06/12/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/12/2024
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
06/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
06/12/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/12/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/12/2024
Special inspection requirement — Air barrier — testing
FAHAD FATEH
06/12/2024
Special inspection requirement — Sprayed fire-resistant materials
FAHAD FATEH
06/12/2024
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
06/12/2024
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
06/12/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/30/2024
Objection resolved — Addressed
05/16/2024
Objection raised — Accessibility
05/13/2024
Filed — New Building
FILING FOR MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITH NEW BUILDING APPLICATION:X00528618. INSTALLING NEW HEATING AND COOLING AND VENTILATION SYSTEMS
X00528618-P4
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBONEI BUILDERS03/28/2025
DOB NOWGeneral ConstructionPermit IssuedBONEI BUILDERS07/22/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN04/10/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC04/10/2024
DOB NOWFoundationSigned-offSKYWARD DEVELOPERS INC01/10/2024
DOB NOWSupport of ExcavationSigned-offSKYWARD DEVELOPERS INC01/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offDORIA, INC08/29/2023
DOB NOWFoundationSigned-offSKYWARD DEVELOPERS INC07/20/2023
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC07/20/2023
DOB NOWStructuralSigned-offSKYWARD DEVELOPERS INC07/20/2023
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC07/20/2023
DOB NOWMechanical SystemsSigned-offSKYWARD DEVELOPERS INC07/19/2023
DOB NOWStructuralSigned-offSKYWARD DEVELOPERS INC07/19/2023
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC06/06/2023
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC06/06/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN02/28/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC02/22/2023
DOB NOWMechanical SystemsSigned-offSKYWARD DEVELOPERS INC02/21/2023
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC02/21/2023
DOB NOWFoundationSigned-offSKYWARD DEVELOPERS INC02/21/2023
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC02/21/2023
DOB NOWStructuralSigned-offSKYWARD DEVELOPERS INC02/21/2023
DOB NOWEarth WorkSigned-offPARK MANAGEMENT USA CORP08/30/2022
DOB NOWConstruction FenceSigned-offPARK MANAGEMENT USA CORP08/29/2022
DOB NOWEarth WorkSigned-offUPPERCLASS MAINTENANCE IN06/02/2022
DOB NOWConstruction FenceSigned-offUPPERCLASS MAINTENANCE IN05/30/2022
DOB NOWConstruction FenceSigned-offROCK BUILDERS INC05/20/2022
1 project · most recent 01/06/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/06/2025Signed-offBONEI BUILDERS LLCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
General Electric AZ65E09DAB 8,000 BTU · Ptac ×36
AZ65H15DAB 13,400 BTU · Ptac ×24
Heating
King W1215 5,120 BTU ×6
LPW1227 10,500 BTU ×4
Qmark MUH0381 10,200 BTU · Electric Heater ×2
Ventilation
Greenheck n/a 50 CFM ×46
USF-08-B2 700 BTU · Exhaust Fan ×1
Markel 8PD15-1812-3 52,000 BTU · Electric Heater ×1
Heat / Cool
Amana PTH1135CC 12,000 BTU · Ptac ×17
PTH093K25A 9,000 BTU · Ptac ×16
PBH09G35CC 9,000 BTU · Ptac ×14
PBH153K35A 15,000 BTU · Ptac ×6
PTH123K25CC 12,000 BTU · Ptac ×6
1 project · most recent 01/06/2025
Sprinkler System
FiledStatusContractorScope
01/06/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 01/06/2025
Storm Water/Sanitary
FiledStatusContractorScope
01/06/2025Signed-offPRIME PIPING & HEATING INStorm, Water/Sanitary
4 projects · most recent 07/13/2023
General Wiring
FiledStatusContractorScope
07/13/2023CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
06/26/2023CompletePOWER DIRECT ELECTRIC INC—
06/12/2023CompleteHIVOLTS ELECTRICAL INC—
05/19/2023CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 01/06/2025
Concrete
FiledStatusContractorScope
01/06/2025Signed-offBONEI BUILDERS LLCConcrete
1 project · most recent 01/06/2025
Fence
FiledStatusContractorScope
01/06/2025Signed-offBONEI BUILDERS LLCFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/20/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
09/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2024Pass-Final PL - UndergroundPassView ↗
05/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/16/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
01/13/2025Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
01/06/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/06/2025Heating SystemsFAHAD FATEHspecial
01/06/2025Mechanical SystemsFAHAD FATEHspecial
01/06/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/06/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/06/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/06/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/06/2025FinalFAHAD FATEHprogress
01/06/2025Shutoff dampersFAHAD FATEHenergy_progress
01/06/2025Maintenance informationFAHAD FATEHenergy_progress
06/12/2024Lighting controlsFAHAD FATEHenergy_progress
06/12/2024Exterior lighting powerFAHAD FATEHenergy_progress
06/12/2024Maintenance informationFAHAD FATEHenergy_progress
06/12/2024Interior lighting powerFAHAD FATEHenergy_progress
06/12/2024Fenestration areasFAHAD FATEHenergy_progress
06/12/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
06/12/2024VestibulesFAHAD FATEHenergy_progress
06/12/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/12/2024MeteringFAHAD FATEHenergy_progress
06/12/2024Air barrier continuity plan testingFAHAD FATEHenergy_progress
06/12/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/12/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
06/12/2024Sprayed fire-resistant materialsFAHAD FATEHspecial
06/12/2024Seismic Isolation SystemsFAHAD FATEHspecial
Latest 25 of 93.
▾Documents — 137 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/24/2026X00742435-I1Request digital key ↗
08/23/2026X00706052-I1Request digital key ↗
08/23/2026X00706052-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
03/13/2024240329168Open ↗
03/04/2024240329168Open ↗
12/28/2023200931224Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
04/24/2025240329168Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/12/2024240329168Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026X00528618-I1Open ↗
08/13/2026X00528618-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026X00528618-I1Open ↗
08/13/2026X00528618-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00528618-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWSpecial Inspector Seal & Signature19
10/03/2026X00706052-I1Open ↗
10/03/2026X00706052-I1Open ↗
08/31/2026X00742435-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/23/2026X00706052-P1Open ↗
08/23/2026X00706052-I1Open ↗
08/21/2026X00528618-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
10/03/2026X00706052-I1Open ↗
08/31/2026X00742435-I1Open ↗
08/31/2026X00742435-I1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/19/2022240329168Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/14/2026X00528618-I1Open ↗
08/13/2026X00528618-P4Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist2
08/14/2026X00528618-I1Open ↗
08/13/2026X00528618-P4Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/12/2024240329168Open ↗
▸BISSTREET TREE CHECKLIST1
04/12/2024240329168Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00528618-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00528618-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00528618-I1Open ↗
▸Environmental & Asbestos19
▸DOB NOWOER: Notice to Proceed9
08/14/2026X00528618-I1Open ↗
08/13/2026X00742435-I1Open ↗
08/13/2026X00528618-S3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/13/2026X00528618-S5Open ↗
08/13/2026X00528618-S7Open ↗
08/13/2026X00528618-Z1Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
04/09/2025240329168Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
04/12/2024240329168Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00528618-S5Open ↗
08/13/2026X00528618-Z1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00528618-I1Open ↗
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT4
08/13/2026X00706052-P1Open ↗
08/13/2026X00706052-I1Open ↗
08/13/2026X00742435-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram3
08/13/2026X00706052-I1Open ↗
08/13/2026X00528618-S7Open ↗
08/13/2026X00742435-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026X00742435-I1Open ↗
08/13/2026X00706052-I1Open ↗
08/13/2026X00528618-S7Open ↗
▸DOB NOWConcrete Testing Exception Report2
08/13/2026X00528618-S2Open ↗
08/13/2026X00706052-I1Open ↗
▸BISBPP: FIELD INSPECTION1
04/24/2025240329168Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
04/24/2025240329168Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/24/2025240329168Open ↗
▸Cost, Insurance & Ownership3
▸BISBPP: ENGINEERS AFFIDAVIT1
04/24/2025240329168Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00528618-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026X00528618-I1Open ↗
▸Filing & Intake Forms2
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/12/2024240329168Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/19/2022240329168Open ↗
▸Other Documents16
▸BISBPP - SUPPORTING DOCUMENTATION8
04/24/2025240329168Open ↗
04/24/2025240329168Open ↗
04/24/2025240329168Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial2
08/14/2026X00528618-I1Open ↗
08/13/2026X00528618-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026X00528618-I1Open ↗
08/13/2026X00528618-P4Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00742435-I1Open ↗
08/13/2026X00528618-S7Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00528618-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00528618-I1Open ↗