← Back
Walk-up apt, over six families with stores
689 FRANKLIN AVENUE
BROOKLYN · BIN 3426347
💬 Discuss this project
2022Year Built
4Stories
C7Building Class
R7AZoning
7,284 sfGross Floor Area
9Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: TWO LAND LLC · 2,117 sf lot · 3.44 FAR built · Flood zone X
Locations of Work
StructuralFire Protection
Roof4p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 16 docs
Floor 41p · 1 filing · 16 docs
Floor 31p · 1 filing · 16 docs
Floor 23p · 1 filing · 10 docs
Floor 13p · 1 filing · 10 docs
Cellar4p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
73 AVE2407/08/2026
TWO LAND LLC703/22/2026
LEVEL 10 CONSTRUCTION GR1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/17/2017$951K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L&C ASSOCIATES210/30/2023
JUNG Y. SHIN LLC208/19/2022
PRIME ZONE BUILDING CONSULTING407/19/2022
ARQUITECTURA VARELA112/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEEP FORMATION INCGeneral Contractor1907/08/2026
L C ASSOCIATESGeneral Contractor403/22/2026
LEVEL 10 CONSTRUCTION GR*General Contractor303/22/2026
BRUCHE MECHANICAL NY LLCFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129510/30/2023
Building Lifecycle
All (54)Filed (9)Permit Issued (9)Signed Off (4)Violation (15)Inspection (2)Special Inspection (15)
05/11/2026
Violation issued (HPD, closed)
A
11/20/2025
Violation issued (HPD, closed)
I
06/16/2025
Violation issued (HPD, closed)
A
12/06/2023
Signed off — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING IN CONJUNCTION WITH NB JOB# 321918608
B00286316-I1
10/31/2023
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
10/30/2023
Filed — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING IN CONJUNCTION WITH NB JOB# 321918608
B00286316-P4
10/20/2023
Signed off — Alteration
B00287772-I1
10/19/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND SUPPORTED SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF AND 600 PSF
B00643568-I1
10/18/2023
Signed off — Alteration
B00277948-I1
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2023
Permit issued — Sprinklers
B00286316-I1-EW-SP
08/03/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/31/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/23/2022
Permit issued — Supported Scaffold
B00643568-I1-SH
12/22/2022
Permit issued — Sidewalk Shed
B00643568-I1-SF
09/23/2022
Violation issued (ECB, closed)
Construction
08/26/2022
Permit issued — Structural
B00287772-I1-ST
08/23/2022
Special inspection requirement — Structural Cold-Formed Steel
NANIK MASSAND
08/23/2022
Special inspection requirement — Structural Steel - Details
NANIK MASSAND
08/23/2022
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
08/23/2022
Special inspection requirement — Structural Steel - High Strength Bolting
NANIK MASSAND
08/23/2022
Special inspection requirement — Masonry
NANIK MASSAND
08/23/2022
Special inspection requirement — Final
NANIK MASSAND
08/19/2022
Filed — Alteration
B00287772-P1
08/18/2022
Special inspection requirement — Structural Steel - High Strength Bolting
08/18/2022
Special inspection requirement — Concrete - Cast-In-Place
08/18/2022
Special inspection requirement — Masonry
08/18/2022
Special inspection requirement — Structural Cold-Formed Steel
08/18/2022
Special inspection requirement — Structural Steel - Details
08/18/2022
Special inspection requirement — Final
07/19/2022
Filed — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING IN CONJUNCTION WITH NB JOB# 321918608
B00286316-P3
07/18/2022
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
07/12/2022
Violation issued (ECB, closed)
Site Safety
06/21/2022
Permit issued — Construction Fence
B00277948-I1-FN
06/03/2022
Filed — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING IN CONJUNCTION WITH NB JOB# 321918608
B00286316-P2
06/03/2022
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
05/11/2022
Permit issued — Sprinklers
B00286316-I1-EW-SP
03/23/2022
Violation issued (ECB, closed)
Construction
03/23/2022
Violation issued (ECB, closed)
Construction
03/23/2022
Violation issued (ECB, closed)
Construction
02/23/2022
Violation issued (ECB, closed)
Construction
02/23/2022
Violation issued (ECB, closed)
Construction
02/23/2022
Violation issued (ECB, closed)
Construction
02/23/2022
Violation issued (ECB, closed)
Construction
02/23/2022
Violation issued (ECB, closed)
Construction
12/28/2021
Permit issued — Supported Scaffold
B00643568-I1-SH
12/28/2021
Permit issued — Sidewalk Shed
B00643568-I1-SF
12/19/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND SUPPORTED SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF AND 600 PSF
B00643568-I1
12/16/2021
Violation issued (ECB, closed)
Unknown
05/19/2021
Permit issued — Construction Fence
B00277948-I1-FN
10/30/2020
Filed — Alteration
B00287772-I1
10/22/2020
Filed — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING IN CONJUNCTION WITH NB JOB# 321918608
B00286316-P1
08/19/2020
Filed — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING IN CONJUNCTION WITH NB JOB# 321918608
B00286316-I1
08/19/2020
Filed — Alteration
B00277948-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC09/15/2023
DOB NOWSupported ScaffoldSigned-offDEEP FORMATION INC12/23/2022
DOB NOWSidewalk ShedSigned-offDEEP FORMATION INC12/22/2022
DOB NOWStructuralSigned-offDEEP FORMATION INC08/26/2022
DOB NOWConstruction FenceSigned-offDEEP FORMATION INC06/21/2022
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC05/11/2022
DOB NOWSupported ScaffoldSigned-offDEEP FORMATION INC12/28/2021
DOB NOWSidewalk ShedSigned-offDEEP FORMATION INC12/28/2021
DOB NOWConstruction FenceSigned-offDEEP FORMATION INC05/19/2021
BISPLISSUEDPLBG P & H INC09/15/2023
BIS—ISSUEDLEVEL 10 CONSTRUCTION GR*12/30/2022
BIS—ISSUEDLEVEL 10 CONSTRUCTION GR*06/18/2022
BISPLISSUEDPLBG P & H INC05/11/2022
BIS—ISSUEDLEVEL 10 CONSTRUCTION GR*06/28/2021
BIS—ISSUEDLEVEL 10 CONSTRUCTION GR*06/28/2021
1 project · most recent 06/03/2022
General Wiring Lighting
FiledStatusContractorScope
06/03/2022CompleteBDS ELECTRIC CORP.General Wiring, Lighting
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/31/2023Sprinkler SystemsNANIK MASSANDspecial
08/23/2022Structural Cold-Formed SteelNANIK MASSANDspecial
08/23/2022Structural Steel - DetailsNANIK MASSANDspecial
08/23/2022Concrete - Cast-In-PlaceNANIK MASSANDspecial
08/23/2022Structural Steel - High Strength BoltingNANIK MASSANDspecial
08/23/2022MasonryNANIK MASSANDspecial
08/23/2022FinalNANIK MASSANDprogress
08/18/2022Structural Steel - High Strength Bolting—special
08/18/2022Concrete - Cast-In-Place—special
08/18/2022Masonry—special
08/18/2022Structural Cold-Formed Steel—special
08/18/2022Structural Steel - Details—special
08/18/2022Final—progress
07/18/2022Sprinkler SystemsNANIK MASSANDspecial
06/03/2022Sprinkler SystemsNANIK MASSANDspecial
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Sprinkler5
08/26/2026B00286316-P2Request digital key ↗
08/26/2026B00286316-P4Request digital key ↗
08/26/2026B00286316-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00287772-I1Request digital key ↗
08/15/2026B00287772-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00277948-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/31/2026B00643568-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION15
03/28/2024321918608Open ↗
03/11/2024321918608Open ↗
09/01/2023321918608Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION8
05/11/2022321918608Open ↗
06/29/2021321918608Open ↗
06/29/2021321918608Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
09/17/2021340714757Open ↗
09/15/2021340714757Open ↗
11/18/2020340714757Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
09/23/2021321918608Open ↗
08/11/2020321918608Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/31/2020321918608Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/15/2020321918608Open ↗
▸BISVERIFY TAX LOT1
12/05/2023321918608Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/04/2019321918608Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/20/2023321918608Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/13/2026B00277948-I1Open ↗
08/13/2026B00286316-P2Open ↗
08/13/2026B00286316-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/29/2026B00286316-P2Open ↗
08/28/2026B00287772-I1Open ↗
08/28/2026B00287772-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
03/27/2020321918608Open ↗
01/08/2020321918608Open ↗
02/04/2019321918608Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/10/2020340714757Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B00287772-I1Open ↗
▸Trade Schedules & Equipment8
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/07/2024321918608Open ↗
05/24/2023321918608Open ↗
05/08/2023321918608Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/05/2024321918608Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/09/2023321918608Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/09/2023321918608Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/04/2019321918608Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/16/2024321918608Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST6
11/19/2024321918608Open ↗
09/23/2021321918608Open ↗
09/15/2021340714757Open ↗
Showing 3 of 6 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/18/2021321918608Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
06/18/2021321918608Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/12/2020340714757Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/23/2021321918608Open ↗
09/15/2021321918608Open ↗
06/18/2021321918608Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/09/2023321918608Open ↗
▸BISINTERIOR LIGHTING POWER1
11/09/2023321918608Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/09/2023321918608Open ↗
▸BISFENESTRATION AREAS1
11/09/2023321918608Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/09/2023321918608Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/09/2023321918608Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/09/2023321918608Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/09/2023321918608Open ↗
▸BIS* HVAC INSULATION AND SEALING1
11/09/2023321918608Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY8
04/16/2024321918608Open ↗
09/23/2021321918608Open ↗
09/15/2021321918608Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/12/2023321918608Open ↗
06/18/2021321918608Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
11/02/2023321918608Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/09/2023321918608Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/09/2023321918608Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/09/2023321918608Open ↗
▸BISMASONRY1
11/09/2023321918608Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
11/09/2023321918608Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
11/09/2023321918608Open ↗
▸BISSOIL REPORT1
02/04/2019321918608Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE4
03/28/2024321918608Open ↗
03/11/2024321918608Open ↗
02/04/2019321918608Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership9
▸BISAcord 25 (Acord Certificate of Liability Insurance)4
06/29/2021321918608Open ↗
06/21/2021321918608Open ↗
06/21/2021321918608Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
06/21/2021321918608Open ↗
06/21/2021321918608Open ↗
06/16/2021321918608Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
06/29/2021321918608Open ↗
06/18/2021321918608Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION9
04/15/2024321918608Open ↗
12/08/2023321918608Open ↗
12/08/2023321918608Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET2
01/08/2020321918608Open ↗
02/04/2019321918608Open ↗
▸BISBOROUGH INTAKE FORM2
06/29/2021321918608Open ↗
03/27/2020321918608Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/15/2021340714757Open ↗
▸Other Documents19
▸BISBPP - SUPPORTING DOCUMENTATION6
03/21/2024321918608Open ↗
03/21/2024321918608Open ↗
09/20/2021340714757Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/18/2021321918608Open ↗
06/18/2021321918608Open ↗
02/04/2019321918608Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
09/15/2021321918608Open ↗
08/31/2020321918608Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/15/2020321918608Open ↗
▸BISLOWEST FLOOR ELEVATION1
11/09/2023321918608Open ↗
▸BISUNDERPINNING (2014)1
11/09/2023321918608Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
11/09/2023321918608Open ↗
▸BISMAINTENANCE INFORMATION1
11/09/2023321918608Open ↗
▸BISTCO - Supporting Documents1
03/21/2024321918608Open ↗
▸BISFA-LOR WAS RECEIVED AND BSCANNED. FA-LOA SHALL BE SUBMITTED PRIOR TO FCO.1
04/17/2024321918608Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
11/09/2023321918608Open ↗